General Info

Business Logo

The University of Toledo, OH

2801 W Bancroft St 2925 East Rocket Drive, Toledo, OH 43606-3328
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1130-26-040
Elevator replacements at Carlson Library on Main Campus, and University Medical Center on the Health Science Campus.
05/26/2026 06:00 PM UTC
0016-26-039
The University of Toledo, Student Union Renovations to portions of the existing Student Center to refresh existing spaces, create a new student lounge, and add a sprinkler system in areas currently without
06/02/2026 06:00 PM UTC
5006-26-1942
DCC CT Sim_Mammography at Dana Cancer Center on UTMC Campus. Project is alteration of existing space to become new diagnostic imaging space. Project includes all major trades.
06/09/2026 06:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
1130-21-247
Wireless Infrastructure Upgrades This project includes replacement of wireless access points in various locations on both campuses. This portion of the project is for installation of owner provided equipment. Existing equipment is no longer able to support the high volume of this service need. A large portion of current equipment is at end-of-life by manufacturer and current software versions are no longer supported on the equipment.
10/26/2021 06:00 PM UTC
REBID 1130-21-240
Underground Utility Infrastructure Improvements Project includes the Main Campus underground utility infrastructure which is 40-50 years old in some locations and often compromised due to failed sections of the piping system. This project will replace 1970’s era underground steam supply and condensate return lines, along with chilled water supply and return lines on Main Campus.
10/12/2021 06:00 PM UTC
1030-22-264
Parking Lot 2 Expansion Parking Lot 2 Expansion project will include the creation of surface parking to replace the former east parking ramp. It will include improved aesthetics, landscaping upgrades and the resurfacing of the existing lot 2 paving. The new and existing lots will be combined and reconfigured to improve vehicular traffic and parking on the east side of campus.
09/28/2021 06:00 PM UTC
0051-21-238
North Engineering Lab/Classroom Renovations (Phase 2) project will address the mechanical, electrical, plumbing and structural renovations in preparation for the classrooms and lab spaces in Phase 3 of the project.
09/21/2021 06:00 PM UTC
0018-22-266
Carter Hall Demolition Project includes abatement of hazardous material as well as demolition of both Carter Hall East and Carter Hall West. The two dormitory buildings were originally built in 1964/1965 and total approximately 125,673gsf. Scope includes complete building and foundation demo and removal. Existing utilities will be cut and capped outside the building footprint. The site will be filled and seeded as the area will become green space after the demolition and available for future development.
09/14/2021 06:00 PM UTC
1130-21-240
Underground Utility Infrastructure Improvements Project includes the Main Campus underground utility infrastructure which is 40-50 years old in some locations and often compromised due to failed sections of the piping system. This project will replace 1970’s era underground steam supply and condensate return lines, along with chilled water supply and return lines on Main Campus.
09/14/2021 06:00 PM UTC
1030-22-263
Parking Lot 13 Expansion project will include the creation of surface parking to replace the former west parking ramp. It will include improved aesthetics, landscaping upgrades and the resurfacing of the existing lot 13 paving. The new and existing lots will be combined and reconfigured to improve vehicular traffic and parking on the west side of campus.
09/07/2021 06:00 PM UTC
REBID 1130-21-236
Elevator Safety Repairs and Replacement Project (Various campus buildings) Upgrade, replace, and modernize elevator systems including upgrading and replacing elevator power systems, controller equipment and systems, elevator cars and machine room upgrades, and bringing existing building elevators up to current code requirements.
08/31/2021 06:00 PM UTC
New 0094-21-231
Ottawa East 2021 Dining Expansion project includes expanding the existing seating capacity within the overall dining space, as well as modifications to the existing dining spaces and associated cooking/serving stations.
08/24/2021 06:00 PM UTC
1130-21-236
Elevator Safety Repairs and Replacement Project (Various campus buildings) Upgrade, replace, and modernize elevator systems including upgrading and replacing elevator power systems, controller equipment and systems, elevator cars and machine room upgrades, and bringing existing building elevators up to current code requirements.
08/10/2021 06:00 PM UTC
61 - 70 of 84 Solicitations
1 2 3 4 5 7 9