General Info

Business Logo

City of Valdez, AK Capital Facilities Department

300 Airport Rd. Ste. 201, Valdez, AK 99686
(907) 835-5478


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2151 Meals Hill Park Development Phase 1
Construction of the Schedule A Work includes a main access area with parking and drop-off zone to Meals Hill Park, entry plaza, approximately 0.9 mile long multi-use pedestrian trail, scenic overlooks, vault toilet, and a picnic shelter. Work includes earthwork, gravel surfacing, cast-in-place concrete, curb & gutter, asphalt pavement, pedestrian fencing, interpretive and wayfinding posts as well as installation of owner provide materials including steel picnic shelter, vault restroom, benches, trash cans, gates, kiosks, topsoil & seeding, and wayfinding sign panels. Construction of the Schedule B Work includes the design and construction of four walking trails (Valdez Vista Overlook Spur, Valdez Vista Trail, Valdez Vista Spur, and Bog View Trail) and two mountain bike trails (Forest Flow and Alder Flow). Included for each trail segment is a Design Memo, Design Standard, Trail Management Objectives that provide detailed trail specifications, and GPS data of the general layout in a kmz file format. Bid Deadline: April 29, 2024 at 2:00pm Alaska Time Non-Mandatory Pre-Bid meeting: April 17, 2024 at 2:00pm Alaska Time Project Manager: Nathan Duval email: nduval@valdezak.gov
04/29/2024 10:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
2188
Valdez Clinic Flooring Replacement Bid Deadline: March 27, 2024 at 11:00am Alaska Time Non-mandatory Pre-Bid meeting: March 13, 2024 at 11:00am Alaska Time Project Manager: Austin Rake email: arake@valdezak.gov
03/27/2024 07:00 PM UTC
2161
Providence Valdez Medical Center Level 1 EPS Generator Replacement Bid Deadline: February 22, 2024 at 2:00pm Alaska Time Non-Mandatory Pre-Bid Conference: January 4, 2024 at 2:00pm Alaska Time Project Manager: Brad Sontag email: bsontag@valdezak.gov
02/22/2024 11:00 PM UTC
2123
HHES Roof, Door & Siding Replacement Bid Deadline: November 8, 2023 at 2:00pm Alaska Time Non-Mandatory Pre-Bid Conference: October 4, 2023 at 3:00pm Alaska Time Project Manager: Scott Benda email: sbenda@valdezak.gov
11/08/2023 11:00 PM UTC
2046
Library/Museum Controls and HVAC Upgrades Bid Deadline: August 1, 2023 at 2:00pm Alaska Time Non-Mandatory Pre-Bid conference: July 14, 2023 at 1:00pm Alaska Time Project Manager: Brad Sontag email: bsontag@valdezak.gov Bidder's Qualification Packet MUST be submitted in order for a bid to be considered complete.
08/01/2023 10:00 PM UTC
1963
Sewer Force Main Replacement Bid Opening: June 8, 2023 at 3:30 PM Alaska Time ***ADDITIONAL Mandatory Pre-Bid Conference*** May 19, 2023 at 11:00 AM Alaska Time MANDATORY Pre-Bid Conference: April 27, 2024 at 2:00 PM Alaska Time Project Manager - Lindy Vititow email: lvititow@valdezak.gov
06/08/2023 11:30 PM UTC
2028
VHS Pool Column Repair Bid Deadline: May 5, 2023 at 2:00pm Alaska Time Non-mandatory pre-bid conference: April 21, 2023 at 2:00pm Alaska Time Project Manager - Austin Rake email: arake@valdezak.gov
05/05/2023 10:00 PM UTC
1994
Port of Valdez Fisherman's Wharf Electrical Repairs A non-mandatory pre-bid conference will be held at the office of the Capital Facilities Director, 300 Airport Road, Suite 201, Valdez, Alaska on April 5, 2023 at 3:00 pm AKST. Project Manager: Larry Ables Email: LAbles@ValdezAK.Gov
04/26/2023 11:00 PM UTC
2044
Glacier Stream Erosion Mitigation Bid Deadline: April 19, 2023 at 2:00pm Alaska Time Non-Mandatory pre-bid conference: April 5, 2023 at 2:00pm Alaska Time Project Manager: Scott Benda email: sbenda@valdezak.gov
04/19/2023 10:00 PM UTC
2033
VHS Exterior Door Replacement A non-mandatory pre-bid conference will be held at the office of the Capital Facilities Director, 300 Airport Road, Suite 201, Valdez, AK on March 30, 2023 at 2:00 pm. Project Manager: Austin Rake Email: ARake@ValdezAK.Gov
04/10/2023 10:00 PM UTC
2031
Park Shelter Structural Repairs Non-mandatory pre-bid conference will be held at the office of the Capital Facilities Director, 300 Airport Road, Suite 201, Valdez, AK on March 22, 2023 at 10:00 am. Project Manager: Canyon Rohrer Email: crohrer@valdezak.gov
04/05/2023 09:00 PM UTC
1 - 10 of 36 Solicitations
← Previous 1 3 4