City of Valdez, AK Capital Facilities Department
300 Airport Rd. Ste. 201, Valdez, AK 99686
(907) 835-5478
300 Airport Rd. Ste. 201, Valdez, AK 99686
(907) 835-5478
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
2151 Meals Hill Park Development Phase 1
Construction of the Schedule A Work includes a main access area with parking and drop-off zone to Meals Hill Park, entry plaza, approximately 0.9 mile long multi-use pedestrian trail, scenic overlooks, vault toilet, and a picnic shelter. Work includes earthwork, gravel surfacing, cast-in-place concrete, curb & gutter, asphalt pavement, pedestrian fencing, interpretive and wayfinding posts as well as installation of owner provide materials including steel picnic shelter, vault restroom, benches, trash cans, gates, kiosks, topsoil & seeding, and wayfinding sign panels.
Construction of the Schedule B Work includes the design and construction of four walking trails (Valdez Vista Overlook Spur, Valdez Vista Trail, Valdez Vista Spur, and Bog View Trail) and two mountain bike trails (Forest Flow and Alder Flow). Included for each trail segment is a Design Memo, Design Standard, Trail Management Objectives that provide detailed trail specifications, and GPS data of the general layout in a kmz file format.
Bid Deadline: April 29, 2024 at 2:00pm Alaska Time
Non-Mandatory Pre-Bid meeting: April 17, 2024 at 2:00pm Alaska Time
Project Manager: Nathan Duval
email: nduval@valdezak.gov
| 04/29/2024 10:00 PM UTC |
Number | Deadline |
---|---|
1737
City Hall and Library Parking Lot Lighting Upgrades
Non-Mandatory Pre-Bid Conference March 16, 2021 at 2:00 PM
| 03/30/2021 10:00 PM UTC |
1747
VCT Causeway Repairs
Non-mandatory pre-bid meeting - Wednesday, March 10, 2021 at 1:30 PM
| 03/30/2021 06:00 PM UTC |
1740
Valdez Civic Center Theatre Lighting Upgrades
Non-mandatory pre-bid conference will be held at the Civic Center, 314 Clifton Dr., Valdez, Alaska on February 23, 2021 at 2:00 PM
| 03/09/2021 11:00 PM UTC |
1735
Baler & Fire Stations 3 & 4 Roof Replacements
Non-mandatory pre-bid conference - Wednesday, February 10, 2021 at 2:00 PM
| 02/24/2021 11:00 PM UTC |
1599
Valdez Elementary & High School Water Piping Replacement
Non-mandatory pre-bid conference - Wednesday, January 6, 2021 at 2:00 PM
| 02/01/2021 11:00 PM UTC |
1615
Hermon Hutchens Elementary School and High School Generator Replacement
Non-mandatory Pre-Bid Conference - Thursday, October 22, 2020 at 2:00 PM
| 11/20/2020 08:00 PM UTC |