General Info

Business Logo

Solicitations and notifications are free for this business.

Lane County, OR - Engineering & Construction Services (ECS) Division

3040 N Delta Hwy, Eugene, OR 97408-1636
(541) 682-6900

Email ECS-Construction@lanecountyor.gov with any questions.

Standard Documents

Name * Description
Instructions for Bid Express on Lane County Projects and FAQ (202 KB)
How to submit a bid on Lane County projects and frequently asked questions.
General Conditions for Construction for Lane County - 2021 (954 KB)
General Conditions for Construction for Lane County - 2021
Local Public Agency (LPA) Quality Assurance Program-2021 (1.15 MB)
Quality Assurance Program for Lane County Public Works
3 Documents

Upcoming Solicitations

Number Deadline
24/25-04-RMD Dust Suppressant Materials - Delivery and Application
See Project Information Section for Description.
05/21/2024 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
22/23-13-RFP Territorial Hwy - Easy Acres Dr to Hamm Rd
The work includes designing and preparing construction drawings and specifications for road widening and realignment, pavement reconstruction and/or preservation, stormwater management (including treatment and flow control), fish passage culverts, retaining walls, and related improvements for 2.51 miles of Territorial Highway. Environmental permitting and hazardous materials compliance are outside the scope of this contract.
01/19/2023 11:00 PM UTC
22/23-12-RFQ Asphalt Concrete Pavement (ACP) Coring and Testing Services
See Project Information Section for Description.
01/17/2023 06:00 PM UTC
22/23-11-RFP Blue River Consolidated Boundary Retracement Survey
See Project Information Section for Description.
11/23/2022 01:00 AM UTC
22/23-09 - RFP: Lane County Parks: Water and Sewer Infrastructure Feasibility Study
The work of the RFP includes an assessment of the water and sewer infrastructure systems for three different parks within Lane County. The feasibility study will result in a thorough report encompassing the three park locations; an evaluation of the sites to determine the water and sewer infrastructure needs and cost estimates for replacing or refurbishing the system. The contract will be for a six month period from January 1, 2023 through July 1, 2023.
11/19/2022 01:00 AM UTC
22.23-08-ECS Territorial Hwy Stony Point Permanent Fencing
See Project Information Section for Description.
11/15/2022 06:00 PM UTC
22/23-06-ECS Howard Elementary & Colin Kelly MS Traffic Congestion Mitigation
See Project Information Section for Description.
11/15/2022 06:00 PM UTC
22/23-10-RMD 2023 Uncoated Oil Rock Production
See Project Information Section for Description.
11/08/2022 06:00 PM UTC
22/23-07-RFP OR-225: OR-126 to end of City jurisdiction (Springfield) ***Re-posted***
***Due to a time zone error with the previous solicitation, this is a re-posting of the solicitation with the deadline extended by one week*** OR-225: OR-126 to end of City jurisdiction (Springfield) Request for Proposal This project will develop a comprehensive design concept for the OR-225 (Franklin Blvd) corridor that improves safety and accommodates all modes of transportation. The corridor currently lacks bicycle, pedestrian, transit, stormwater, and intersection traffic control facilities. The project includes elements such intersection layout and right-of-way envelope, and potential re-alignment of an intersecting street. Traffic roundabouts are proposed at E 19th Ave, Nugget Way, and in the vicinity of the southern end of the project. Additional elements include protected bicycle facilities, lighting, and a center median and landscaping that will incorporate stormwater facilities. The design concept will also determine the future design for the underpass at the Union Pacific Railroad crossing just north of E 19th Ave. The project includes environmental (NEPA) analysis for the project envelope. The project limits are OR-126 (also Franklin Blvd) to the north and approximately milepoint 0.87 approaching a railroad overpass to the south. The project length is approximately 4,400’. This RFP is a Qualifications Based Selection (QBS) with Federal Highway Administration (FHWA) Funding. A DBE participation goal of 8.5% has been assigned for the Contract.
10/27/2022 10:00 PM UTC
22/23-07-RFP OR-225: OR-126 to end of City jurisdiction (Springfield)
OR-225: OR-126 to end of City jurisdiction (Springfield) Request for Proposal This project will develop a comprehensive design concept for the OR-225 (Franklin Blvd) corridor that improves safety and accommodates all modes of transportation. The corridor currently lacks bicycle, pedestrian, transit, stormwater, and intersection traffic control facilities. The project includes elements such intersection layout and right-of-way envelope, and potential re-alignment of an intersecting street. Traffic roundabouts are proposed at E 19th Ave, Nugget Way, and in the vicinity of the southern end of the project. Additional elements include protected bicycle facilities, lighting, and a center median and landscaping that will incorporate stormwater facilities. The design concept will also determine the future design for the underpass at the Union Pacific Railroad crossing just north of E 19th Ave. The project includes environmental (NEPA) analysis for the project envelope. The project limits are OR-126 (also Franklin Blvd) to the north and approximately milepoint 0.87 approaching a railroad overpass to the south. The project length is approximately 4,400’. This RFP is a Qualifications Based Selection (QBS) with Federal Highway Administration (FHWA) Funding. A DBE participation goal of 8.5% has been assigned for the Contract.
10/20/2022 04:00 PM UTC
22/23-04-PARKS Fern Ridge Water Tank Construction
This project will add four - 5,000 gallon tanks next to an existing 20,000 gallon concrete reservoir and plumb the new tanks together to act as a single reservoir. Installation of the new tanks will require excavation and placement of crushed rock to support the tanks. Eco Blocks are required to retain adjacent ground due to the excavation depth for the reservoirs. Pipe connections are required to integrate the new tanks with the existing tank and drain manhole. The estimated project cost range for the work described is $100,000 to $150,000.
10/11/2022 05:00 PM UTC
41 - 50 of 75 Solicitations
1 2 3 5 7 8