Central, Freedom, Spruce and Walnut Water and Sidewalk Improvements, Contract #CG
Project Description: The proposed work under this Contract consists of approximately 2,358 lineal feet of 12", 8", and 6" water line replacement with new valves, hydrants, and services, and 7,353 square feet of sidewalk replacement. The estimated cost for this project is $993,690.00.
05/22/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Painting of Pavement Markings and Striping, 2025-B
The proposed work under this Contract consists of approximately 29 pass miles of pavement striping, various painted pavement markings throughout the City, removal of pavement markings, and downtown striping. The estimated cost for this project is $98,708.74.
04/29/2025 03:00 PM UTC
2025 Annual Paving Program, Contract 2025-A
The proposed work under this contract includes asphalt planing and resurfacing, asphalt patching, crack sealing, concrete roadway repairs, concrete intersection replacement, asphalt and concrete road base repairs, curb ramp and sidewalk replacements, replacement of and installation of new storm and sanitary structures, and associated work items. The estimated cost for this project is $1,227,341.00 without alternate items and $1,533,008.00 with all alternate items.
03/04/2025 04:00 PM UTC
RFQ - Chestnut Street Lift Station and Discharge Pipe
The City of Ravenna is seeking consultant qualifications to design new discharge sanitary piping from the Chestnut St. lift station to the WWTP, approximately 4,800 linear feet, as phase one of the project. Phase two will be to design an upgraded lift station. Please review all documents in the Attachment List section. Letters of Interest shall be submitted on or before 11am January 23rd, 2025 and shall be sent to Bob Finney, City Engineer, 530 N. Freedom St., Ravenna, Ohio 44266 and email bob.finney@ravennaoh.gov. Please copy Dominic DiSalvo, Assistant City Engineer (dominic.disalvo@ravennaoh.gov) with your correspondence.
01/23/2025 04:00 PM UTC
City Park Improvements, 2025-P
The proposed work under this Contract consists of cleaning, sealing, and acrylic surface painting and striping two (2) tennis courts, two (2) basketball courts, and one (1) skate park, and creating three (3) new pickleball courts on an existing asphalt court which requires asphalt curb removal, surface cleaning and sealing, geofabric installation, asphalt resurfacing, pickleball hardware installation, and acrylic surface painting and striping. The estimate for this Contract is $186,558.68. Estimate with fence replacement alternates is $250,498.68.
12/03/2024 04:00 PM UTC
New Water Tank, 2024-F
The proposed work under this Contract consists of the removal of an existing 3 million gallon standpipe which was installed in 1983, and replacement with a 750,000 gallon composite water storage tank. The estimated cost for this project is $4,324,000.00.
06/13/2024 03:00 PM UTC
Spruce and Jefferson Water and Sidewalks, Contract #CG50AB/CG51AB
Project Description: The proposed work under this Contract consists of approximately 1454 lineal feet of 8" and 6" water line replacement with new valves, hydrants, and services, transferring 8 services from an existing 4" cast iron line to an existing 8" asbestos cement line, and 8638 square feet of sidewalk replacement. The estimated cost for this project is $601,454.00.
05/23/2024 03:00 PM UTC
FOXWOOD ESTATES SANITARY EXTENSION
The proposed work under this Contract consists of extending City sewer to service ten lots within Ravenna Township per Ohio Environmental Protection Agency orders. Work includes providing and placing 1,175 lineal feet of 8” SDR35 pipe and appurtenances, installing new precast manholes, installing wyes and running 6” SDR35 sanitary laterals to existing septic tank laterals, decommissioning existing septic systems, installing provided water meters on well lines, abandoning common septic system manholes and plugging two discharge points, asphalt trench paving, replacing concrete and asphalt drive aprons, and replacing sidewalks and curb ramps disturbed during construction. The estimated cost for this project is $389,270.00.
04/11/2024 03:00 PM UTC
Annual Paving Program, 2024-A
The proposed work under this Contract consists of asphalt milling, base repairs and paving, Brick road reconstruction and associated work items, concrete roadway repairs and concrete intersection replacement, placement of new curb and gutter, sidewalk & curb ramp replacements and associated work items. The estimated cost for this project is $1,109,230.00 without alternates and $1,312,340.00 with all alternate items.
02/29/2024 04:00 PM UTC
Painting of Pavement Markings and Striping - Contract 2024-B
The proposed work under this Contract consists of 24.35 pass miles of pavement striping, removal of various pavement markings and striping, and various painted pavement markings throughout the City. This project includes downtown striping but excludes striping on SR59 due to ODOT resurfacing. The estimated cost for this project is $81,437.00.
02/29/2024 04:00 PM UTC
POR Chestnut/Propsect (Ravenna) PID# 115360 - Chestnut & Prospect Resurfacing
Project Description: Improvements to 2.16 miles of North Chestnut Street and South Prospect Street located in the City of Ravenna, Ohio. Work includes asphalt milling and paving, chip seal interlayer, sidewalk replacement, ADA curb ramp improvements, and associated work items. DBE Goal: 7%
06/27/2023 03:00 PM UTC