General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
14 Solicitations

Closed Solicitations

Number Deadline
20-11-2
Hollycrest Blvd - The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing, replacing and/or repairing concrete panels as specified along Hollycrest Blvd (R03L114) Section 15 Township 7S Range 11E Covington.
07/22/2020 07:00 PM UTC
20-8-2
Alton Drainage Improvements.....................The Contractor must provide all labor, equipment, and tools necessary for the installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The project location is Alton Subdivision, Slidell, LA (S23-T8S-R14E)
06/25/2020 07:00 PM UTC
20-12-2
Erindale Drainage Phase 2 - The Contractor must provide all labor, equipment, tools, and materials necessary for the removal and installation of drainage structures, concrete curb and drives, and asphalt paving per specifications. The time period for completion of the work is one hundred eighty (180) days from issuance of Notice to Proceed by the Parish.
06/24/2020 07:00 PM UTC
20-7-2
Fairgrounds Phase 3 - The project shall consist of the construction of a concession building (approx. 2,277 sq ft) as an addition to the existing structure. The building shall include a concession stand, offices, storage, restrooms, parking lot and all associated civil site improvements per the plans and specifications. The project shall also include a covered area (approx. 12,170 sq ft) and a wash-down area.
06/24/2020 07:00 PM UTC
20-14-2
2020 Official Journal - The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
06/12/2020 07:00 PM UTC
20-6-2
I-10 Service Rd. Bridge Replacements.......Contractor must provide all adequate and competent labor, equipment, testing and materials necessary for the replacement of two existing bridges (Reine Canal & French Branch Canal) along I-10 Service Rd.; (S1,T9,R14E) in Slidell, LA., with case-in-place concrete slab span bridges, reconstructed roadway approaches, new guardrails, and new drainage structures. The work includes milling and overlaying the existing roadway sections outside of the limits of the newly constructed bridges and roadway approaches.
03/31/2020 07:00 PM UTC
20-5-2
2020 District 1 Road Improvements.......................The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing road surfaces as specified along Brewster Rd (R01I003) Section 16 Township 7S Range 10E Madisonville ; Iris Dr (R01D011) Section 47 Township 7S Range 10E Covington.
03/18/2020 07:00 PM UTC
20-2-2
2019 District 4 Rd improvements...................The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying and patching road surfaces as specified along Belle Terre Blvd (R04A025) Section 21 Township 7S Range 11E, Covington, LA., 70433; Guste Island Rd (R01M016) Section 17 Township 7S Range 10E, Madisonville, LA., 70447.
03/12/2020 07:00 PM UTC
20-3-2
2019 District 6 Road Improvements, Pt 3........The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by overlaying and patching road surfaces along House Creek Rd (R02T001) Section 6 Township 5S Range 12E; N Taylor Rd (R02T003) Section 26 Township 5S Range 11E.
03/12/2020 07:00 PM UTC
20-1-2
SH Quad B Bathroom Renovations ----- The Contractor is to provide all supplies, tools, materials, man lifts, scaffolding, etc. to complete the SH Quad B Bathroom Renovations project under the submitted bid. The jobsite is to be left in a clean, safe and reasonable manner at the end of each workday. Upon completion of the project, the Contractor will remove any leftover materials, construction debris, trash, etc. from the jobsite.
03/11/2020 07:00 PM UTC
461 - 470 of 917 Solicitations
1 2 43 44 45 47 49 50 51 91 92