Number Deadline
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
10/07/2025 07:00 PM UTC
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
10/07/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
20-3-2
2019 District 6 Road Improvements, Pt 3........The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by overlaying and patching road surfaces along House Creek Rd (R02T001) Section 6 Township 5S Range 12E; N Taylor Rd (R02T003) Section 26 Township 5S Range 11E.
03/12/2020 07:00 PM UTC
20-1-2
SH Quad B Bathroom Renovations ----- The Contractor is to provide all supplies, tools, materials, man lifts, scaffolding, etc. to complete the SH Quad B Bathroom Renovations project under the submitted bid. The jobsite is to be left in a clean, safe and reasonable manner at the end of each workday. Upon completion of the project, the Contractor will remove any leftover materials, construction debris, trash, etc. from the jobsite.
03/11/2020 07:00 PM UTC
20-4-2
Concrete Culverts---Prices remain in effect from January 1, 2020, through December 31, 2020, with the option to extend for (1) one additional year, by written agreement of both parties. Any delivery or service charge must be included in the bid price. Quantities may vary; minimum orders shall not be required. Bids must be submitted on the Pricing Sheet provided. All Price blank spaces must be filled in, NO blanks will be permitted. If the item is unavailable, or you are not bidding on the item, please enter N/A or No Bid. Price per foot for reinforced concrete culverts delivered F.O.B. job site, St. Tammany Parish, in diameters listed below. Concrete culverts shall be made according to the standards of ASTM C-76 (Bell & Spicket for round and ASTM C-506 for arch with rubber gasket or FWG joints. Pipes need to be on DOTD Materials List.
02/20/2020 08:00 PM UTC
19-60-2
Belt Press-Westwood WWTP ----- The Parish extends this MATERIAL ONLY bid request to procure one (1) skid mounted Bright Technologies Model SP50-6700-8DS 1.7 Meter Belt Filter Press.
02/12/2020 08:00 PM UTC
19-62-2
2019 District 13 Road Improvements.......The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve road surfaces by milling and/or overlaying, patching, RAP material, and driveway aprons along Indian Village Rd (R08P007) Section 15 Township 9S Range 15E ; Richards Dr. (R08Q007) Section 29 Township 9S Range 15E, Slidell, LA., as required in specifications.
02/11/2020 08:00 PM UTC
19-65-2
Lake Ramsey Rd. Turn Lane ----- This is a 2019 Capital Improvement Project. The work in this project will require the contractor to provide all adequate and competent labor, equipment, and materials necessary to complete roadway improvements, along Lake Ramsey Rd. (R03D012) Section 18 Township 6S Range 11E as specified in the drawings and specifications.
02/05/2020 08:00 PM UTC
19-61-2
Whisperwood Blvd ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, materials and supervision required for 3” Mill, 1” Asphalt Leveling Course , 2” Asphalt Wearing Course, 3” Cold Planning, Patching, adjust manhole, and driveway aprons to improve road surfaces in according with specification along Whisperwood Blvd (R08I033) Section 35 Township 8S Range 14E.
02/05/2020 08:00 PM UTC
19-63-2
2019 District 9 Road Improvements, Pt 2 ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying, cold planning, patching, drain pipe, topsoil material, and driveway aprons as required in specifications along Manchester Dr. (R08N005) Section 38 Township 9S Range 15E, Slidell, LA.; Pat Smith Rd (R08B008) Section 2 Township 8S Range 14E, Pearl River, LA.; Pine Alley Dr. (R08E031) Section 19 Township 8S Range 15E, Pearl River, LA.
02/04/2020 08:00 PM UTC
19-64-2
2019 District 3 Road Improvements, Pt 3 ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by overlaying, patching, RAP material, and driveway aprons as required in the specifications along C. Gotti Rd. (R02J003) Section 36 Township 5S Range 10E ; Thompson Rd (R02J005) Section 35 Township 5S Range 10E, Folsom, LA.
02/03/2020 08:00 PM UTC
19-45-2
Utility Construction and Maintenance Contract
01/03/2020 08:00 PM UTC