General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8298 - Groveland Terrace Assessment District- 2019
8298 - Groveland Terrace Assessment District- 2019
03/07/2019 08:00 PM UTC
8238 - Metro Transit - Service Lane Addition - Phase 1
8238 - Metro Transit - Service Lane Addition - Phase 1
02/28/2019 08:00 PM UTC
8119 - S. Bryan Street, Daley Drive, James Street and Thorp Street Reconstruction District 2018
8119 - S. Bryan Street, Daley Drive, James Street and Thorp Street Reconstruction District 2018
02/28/2019 08:00 PM UTC
8320 - Resurfacing 2019 - Asphalt Base Patching and Base Patch Grinding
8320 - Resurfacing 2019 - Asphalt Base Patching and Base Patch Grinding
02/28/2019 08:00 PM UTC
8301 - Reetz Road and Altem Circle Resurfacing Assessment District - 2019
8301 - Reetz Road and Altem Circle Resurfacing Assessment District - 2019
02/28/2019 08:00 PM UTC
8319 - Resurfacing 2019 - Asphalt Pavement Pulverizing, Milling & Paving
8319 - Resurfacing 2019 - Asphalt Pavement Pulverizing, Milling & Paving
02/28/2019 08:00 PM UTC
8390 - CIPP WET LINING REHAB OF SANITARY SEWERS - 2019
8390 - CIPP WET LINING REHAB OF SANITARY SEWERS - 2019
02/28/2019 08:00 PM UTC
8318 - RESURFACING 2019 - CURB & GUTTER AND CASTINGS
8318 - RESURFACING 2019 - CURB & GUTTER AND CASTINGS
02/28/2019 08:00 PM UTC
7613 - Portage Road Assessment District - 2016 And Eastpark Multi-Use Path & Bridge and Eastlawn Multi-Use Bridge
7613 - Portage Road Assessment District - 2016 And Eastpark Multi-Use Path & Bridge and Eastlawn Multi-Use Bridge
02/21/2019 08:00 PM UTC
8367 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 9) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 9) by the Common Council
02/21/2019 08:00 PM UTC
511 - 520 of 1107 Solicitations
1 2 48 49 50 52 54 55 56 110 111