General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8786PlanHolders03132026.pdf (91.6 KB)
Contract 8786 - MacArthur, Larson, Sycamore
8810PlanHolders03132026.pdf (88.5 KB)
Contract 8810 - Midvale Boulevard Pavement
8845PlanHolders03132026.pdf (91.7 KB)
Contract 8845 - Campus Babcock Railroad Crossing
9593PlanHolders03132026.pdf (88.5 KB)
Contract 9593 - Pressure Zone 4 Crossing
9613PlanHolders03132026.pdf (91.2 KB)
Contract 9613 - CIPP UV Lining Rehabilitation
9694PlanHolders03132026.pdf (86.5 KB)
Contract 9694 - Warner & Worthington Park Courts
9712PlanHolders03132026.pdf (88.6 KB)
Contract 9712 - Yahara Hills Golf Course Well Pipe
9726PlanHolders03132026.pdf (96.1 KB)
Contract 9726 - Country Grove Singletrack Trail
9730PlanHolders03132026.pdf (92.3 KB)
Contract 9730 - Manitou Way Storm Box
9740PlanHolders03132026.pdf (94 KB)
Contract 9740 - Unit Well 12 Upgrade
11 Documents

Upcoming Solicitations

Number Deadline
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/19/2026 07:00 PM UTC
9712 - Yahara Hills Golf Course Well Transfer Pipe
The objective of these specifications is to reroute the existing irrigation well to irrigation pond #3. Routing of the pipe shall avoid existing golf irrigation system. This project consists of irrigation mainline installation, irrigation shut off valve installation, and site restoration.
03/19/2026 07:00 PM UTC
9730 - Manitou Way Storm Box Replacement
The work under this contract shall include, but not be limited to, replacement of a portion of the storm sewer box culvert main and endwall, excavation, terrace restoration, and removal and rebuilding of a historical stone wall.
03/19/2026 07:00 PM UTC
8845 - Campus Drive at Babcock Drive Railroad Crossing Improvements
Work includes, but is not limited to, base preparation, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, electrical, traffic signals, lighting, pavement marking, signs, fencing, landscaping, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
03/19/2026 07:00 PM UTC
8810 - Midvale Boulevard Pavement Patching
The work under this contract shall include, but not be limited to, asphalt pavement patching, pavement markings, tubular bollard curb extensions, and rectangular rapid flashing beacon installations.
03/19/2026 07:00 PM UTC
8786 - MacArthur Road, MacArthur Court, Larson Court, Sycamore Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
03/19/2026 07:00 PM UTC
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
09/18/2025 07:00 PM UTC
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
09/18/2025 07:00 PM UTC
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following: • Removal of existing bridge • Bridge fabrication, delivery and installation of new bridge on existing abutments
09/18/2025 07:00 PM UTC
8801 - Troy Drive Green Avenue Sanitary Sewer with Resurfacing Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, installation sanitary sewer main and laterals, adjustment of water valves, and storm inlets, pulverize and shape the existing asphalt pavement, full width grinding of the existing pavement, bus pad installation, and spot replacement of curb and gutter and sidewalks, and new pavement marking.
09/18/2025 07:00 PM UTC
9659 - Engineering Operations Facility (EOF) Locker Room Renovation
This contract is for improvements to the Engineering Services Building (ESB) Locker Room located at 1600 Emil Street, Madison, WI. The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of interior walls, removal and replacement of slabs on grade, and interior renovations to create 12 individual use restrooms (4 of these rooms also have showers), and a general locker room area within the footprint of the existing building.
09/04/2025 07:00 PM UTC
9682 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace Parking structure.
09/04/2025 07:00 PM UTC
9657 - Stricker Pond Forebay Dredging
Dewater and dredge the existing stormwater forebay located at the City of Madison Park Stricker's Pond, 7214 Longmeadow Rd. This work also includes construction of four catch basins, topsoiling and native seeding.
09/04/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
9673 - Bartillon Shelter Fiber Connection
1904 Bartillon Drive, Madison, WI.
08/21/2025 07:00 PM UTC
9677 - Quann Park Lighting Project
The project generally consists of installing City-standard path lighting (LED, cut-off fixtures) along the Quann Park Path. The project also includes work at Penn Park to install two solar street lighting units.
08/21/2025 07:00 PM UTC
11 - 20 of 1076 Solicitations
2 4 5 6 7 8 9 107 108