Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9588 - Wester Badger Mill Greenway Improvements
This contract and associated plan set describes the work necessary to remove existing sediment deposition, grading, erosion control, remove, repair, and install new storm sewer within the existing greenway located at the City of Madison West Badger Mill Greenway in Madison, Wisconsin. This includes excavating, loading, hauling and disposal of approximately 5,300 cubic yards of soil. This work also includes construction of one (1) 6’x6’ catch basin w/sump, (1) 4’ SAS, storm sewer pipe, topsoiling and erosion matting, native seeding, planting and ecological restoration.
06/25/2026 07:00 PM UTC
9807 - Fordem Avenue - First Street Relief Sanitary Sewer
Work includes, but is not limited to, replacement of sanitary sewer main, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, base course, asphalt pavement, and pavement marking.
06/25/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
9795 - James Madison Park Retaining Wall Repair
This project will replace a failing concrete retaining wall in James Madison Park. This concrete wall supports the driveway to the underground parking garage serving the Lincoln School Apartments. The project uses a hybrid approach to replace a portion of the wall in kind then regrade a portion of the hillside within the park to support the driveway without a need for a retaining wall.
06/11/2026 07:00 PM UTC
8842 - Southwest Commuter Path & West Washington Avenue Traffic Signal
The work under this contract shall include but not be limited to removing existing Rectangular Rapid Flashing Beacons, installing new traffic signal bases, conduit, removing concrete sidewalk and ramps, and installing new sidewalks and ramps.
06/11/2026 07:00 PM UTC
9758 - Milwaukee Street & Sprecher Road Traffic Signal Assessment District
The work under this contract shall include but not be limited to removing and salvaging existing arms, poles, breakaway bases, and flashing red light devices; installing new traffic signal bases, conduit, and pullboxes. The project limits for the work at the intersection of Sprecher Road & Milwaukee Street are approximately 330-feet on each approach of the intersection.
06/11/2026 07:00 PM UTC
7431 - Cannonball Path Phase 6
The work under this contract shall include but is not limited to replacement and upgrade of sanitary sewer and laterals, storm sewer pipes and structures, as well as the installation and replacement of concrete sidewalk, concrete curb & gutter, concrete driveway aprons, concrete pavement, asphalt driveways, asphalt pavement, roadway base, path and street lighting, fiber conduit, pavement markings, bike-pedestrian bridge structure, and soil restoration.
06/11/2026 07:00 PM UTC
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC