General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9668PlanHolders08212026.pdf (94.4 KB)
Contract 9668 - Mayflower Lift Station Replacement
9782PlanHolders08212026.pdf (97.6 KB)
Contract 9782 - South Point Public Works Facility
9806PlanHolders08212026.pdf (83.7 KB)
Contract 9806 - 2026 Playgrounds -- Set 2
9818PlanHolders08212026.pdf (86 KB)
Contract 9818 - Cypress Spray Park Redevelopment
5 Documents

Upcoming Solicitations

Number Deadline
9668 - Mayflower Lift Station Replacement
The work under this contract shall include, but is not limited to, the removal and replacement of the existing Mayflower sanitary sewer lift station, replacement of the existing force main, replacement of gravity sanitary sewer mains and structures, installation of an emergency generator, installation of a telemetry antenna tower, installation of a new site access drive, grading of the site, and restoration of the site.
08/27/2026 07:00 PM UTC
9782 - South Point Public Works Facility
This single contract is for the installation of a new Streets Division Operations Building and the remodeling of an existing warm storage building for Parks Division West Maintenance Operations.
09/10/2026 07:00 PM UTC
9818 - Cypress Spray Park Redevelopment
This contract consists of installation of a Splash Pad and Playground at Cypress Spray Park (902 Magnolia Ln.). The Contractor shall view the site prior to bidding to become familiar with the existing conditions. The Contractor shall work with the existing utilities to resolve conflicts during the construction process.
09/10/2026 07:00 PM UTC
9806 - 2026 Playgrounds -- Set 2
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at five (5) City of Madison park locations including James Madison Park, Marshall Park, Eastmorland Park, Orton Park, and Heifetz Park.
09/10/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
9758 - Milwaukee Street & Sprecher Road Traffic Signal Assessment District
The work under this contract shall include but not be limited to removing and salvaging existing arms, poles, breakaway bases, and flashing red light devices; installing new traffic signal bases, conduit, and pullboxes. The project limits for the work at the intersection of Sprecher Road & Milwaukee Street are approximately 330-feet on each approach of the intersection.
06/11/2026 07:00 PM UTC
7431 - Cannonball Path Phase 6
The work under this contract shall include but is not limited to replacement and upgrade of sanitary sewer and laterals, storm sewer pipes and structures, as well as the installation and replacement of concrete sidewalk, concrete curb & gutter, concrete driveway aprons, concrete pavement, asphalt driveways, asphalt pavement, roadway base, path and street lighting, fiber conduit, pavement markings, bike-pedestrian bridge structure, and soil restoration.
06/11/2026 07:00 PM UTC
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
9776 - Overture Center Garage Electrical Upgrade
Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components, installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation.
05/21/2026 07:00 PM UTC
9709 - Yahara Hills Golf Course Paved Paths
This project constructs up to 5600 linear feet of asphalt multiuse paths for Yahara Hills Golf Course. The new multiuse paths consist of excavation of existing grade to depth for base course and grading to maintain a 2% max cross slope on all paths. Base course consists of clear stone and crushed aggregate base course. The paths will then be paved with asphalt per specifications.
05/21/2026 07:00 PM UTC
8747 - Pflaum Road Resurfacing Assessments District - 2025
This project will take place at Pflaum Road between Monona Drive and S Stoughton Road shall include, but is not limited to replacement of sanitary sewer main and laterals, replacement of water main and reconnection of water services, and storm sewer main, structures and laterals, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, installation of a new bicycle path, underground terrace and sidewalk support systems, asphalt pavement, and pavement marking.
05/21/2026 07:00 PM UTC
9490 - Fordem Avenue - First Street Relief Sanitary Sewer
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, base course, asphalt pavement, and pavement marking.
05/21/2026 07:00 PM UTC
9788 - CIPP 2026 Woodvale Drive Water Main Rehabilitation
The rehabilitation of these water mains is to be completed by lining the existing water mains with a Class IV structural cured-in-place pipe (CIPP), certified for the conveyance of drinking water. Temporary water service is to be provided to all affected properties during the rehabilitation of these water mains.
05/14/2026 07:00 PM UTC
11 - 20 of 1121 Solicitations
2 4 5 6 7 8 9 112 113