City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
Name * | Description | |
---|---|---|
How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
8709PlanHolders05152024.pdf (107 KB) |
Contract 8709 - Doncaster, Beverly, Danbury
| |
8745PlanHolders05152024.pdf (106 KB) |
Contract 8745 - Stevens Street
| |
9358PlanHolders05152024.pdf (130 KB) |
Contract 9358 - Bartillon Shelter
| |
Number | Deadline |
---|---|
9358 - Bartillon Shelter
The work includes, but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
| 05/23/2024 07:00 PM UTC |
8745 - Stevens Street Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, and replacement and installation of storm sewer pipes and structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
| 05/23/2024 07:00 PM UTC |
8709 Doncaster Beverly Danbury Reconstruction Assessment District - 2024
The work includes replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, terrace rain gardens, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, and asphalt pavement.
| 05/23/2024 07:00 PM UTC |
Number | Deadline |
---|---|
9509 - 2024 Sport Court Resurfacing
The work includes resurfacing and/or power washing existing basketball and tennis courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
| 04/04/2024 07:00 PM UTC |
8750 - Chip Sealing 2024 - East
The work includes street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
| 04/04/2024 07:00 PM UTC |
8751 - Repairing and Sealing Pavement Cracks - Local Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
| 04/04/2024 07:00 PM UTC |
8752 - Repairing and Sealing Pavement Cracks - Major Streets 2024
The work includes routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
| 04/04/2024 07:00 PM UTC |
9508 - CIPP Water Main Rehabilitation 2024
The work includes mobilization, shoring and maintaining water main access pits. Installing, disinfecting, protecting, and maintaining temporary water service. Traffic control and work site protection. Cleaning, televising, and recording the existing and new water mains. Furnishing and installing a structural CIPP water main liner. Internally reinstating service laterals. Field and laboratory documentation/testing. Site restoration (NOT to include pavement restoration). Delivering submittals and obtaining approvals (both Madison Water Utility and WI-Dept. of Natural Resources) as specified in these Contract documents.
| 04/04/2024 07:00 PM UTC |
8758 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2024
The work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the City of Madison) and associated work.
| 04/04/2024 07:00 PM UTC |
9501 Lake Street Sanitary Sewer Replacement
The work includes removal and installation of sanitary sewer pipes and structures, reconnection of sanitary laterals, trench dewatering, and trench patching of the affect streets.
| 04/04/2024 07:00 PM UTC |
8712 Lowell Street Assessment District 2024
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, water main and services, and replacement of storm sewer main and storm sewer structures, rain garden, storm sewer treatment system, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking, and signing.
| 03/28/2024 07:00 PM UTC |
8746 - West Washington Avenue and Henry Street Resurfacing Assessment District - 2024
The work includes, but is not limited to, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk replacement, pulverize and shape, asphalt pavement, traffic signals, pavement marking and signing.
| 03/28/2024 07:00 PM UTC |
9359 - Country Grove Park Shelter
The work includes furnishing all labor, materials, equipment and tools for general construction of a new Country Grove Park Shelter located at 7353 East Pass, Madison, WI, including but is not limited to, mechanical, electrical, plumbing, site and utility work including connections from the new building to water and sewer lines. Additional site work includes a new parking lot, paths, bio-retention basins and new sport courts.
| 03/21/2024 07:00 PM UTC |