General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
7839 - 2017 - 2019 Semi-Permanent Epoxy Pavement Marking
2017 - 2019 Semi-Permanent Epoxy Pavement Marking
11/18/2016 07:00 PM UTC
7841 - Bowman Baseball Backstop Replacement
Bowman Baseball Backstop Replacement
11/04/2016 06:00 PM UTC
7584 - Walter Street & Sargent Street Assessment District - 2016
Walter Street & Sargent Street Assessment District - 2016
11/04/2016 06:00 PM UTC
7641 - Woodrow Street Reconstruction Assessment District - 2016
Woodrow Street Reconstruction Assessment District - 2016
11/04/2016 06:00 PM UTC
7851 - CIPP Rehab of Sanitary and Storm Sewers - 2016
CIPP Rehab of Sanitary and Storm Sewers - 2016
11/04/2016 06:00 PM UTC
7818 - Traffic Calming Medians Landscaping 2017
Traffic Calming Medians Landscaping 2017
11/04/2016 06:00 PM UTC
7820 - Citywide Median Replanting 2017
Citywide Median Replanting 2017
11/04/2016 06:00 PM UTC
7834 - CIPP Wet Lining Rehab of Sanitary Sewer - 2016
7834 - CIPP Wet Lining Rehab of Sanitary Sewer - 2016
10/21/2016 06:00 PM UTC
7792 - BOWMAN BASEBALL BACKSTOP REPLACEMENT
7792 - BOWMAN BASEBALL BACKSTOP REPLACEMENT
10/07/2016 06:00 PM UTC
7806 - Esther Beach Park Phase II Improvements
Esther Beach Park Phase II Improvements
10/07/2016 06:00 PM UTC
731 - 740 of 1107 Solicitations
1 2 70 71 72 74 76 77 78 110 111