General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
TRC1903 Trade RFQ
TRC1903 Request for Qualifications for Fifteen (15) Trade Contractor packages: Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Damp-proofing and Caulking; Roofing and Flashing; Glass and Glazing; Tile; Acoustical Tile; Resilient Floors; Terrazzo; Painting; Elevators; Fire Protection Sprinkler System; Plumbing; HVAC & Electrical for the Quincy Trial Court with a new state-of-the-art judicial facility, housing the District Court, Juvenile Court, and Housing Court.
07/13/2026 04:00 PM UTC
STC2202 Glass & Glazing Trade RFB
Springfield Technical Community College – School of Health and Patient Simulation (SHPS) Modernization, Springfield, MA. Trade Bid for the following Trade Category: Glass & Glazing.
07/14/2026 04:00 PM UTC
MMP 42
Mechanical and Plumbing Preventive Maintenance Contract, Springfield Data Center, Springfield, MA. Includes all Mechanical and Plumbing Equipment specified in the Bid Documents. Includes testing, inspection, preventive maintenance (including all PM required parts and materials), repairs, requested emergency services and incidental extra services for all mechanical and plumbing equipment. Must be licensed as a Mechanical, Refrigeration and Plumbing Contractor in Massachusetts and meet the qualifications specified in the Bid Documents. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
07/22/2026 06:00 PM UTC
SDE1902 Trade RFQ
Request for Qualifications for (2) Two Trade Contractors: Acoustical Tile ($133,176) & Elevators 2nd Request ($256,000) for SDE - Middleton Jail and HOC - Medical & Kitchen Building/ISB Replacement (Phase 2), Middleton, MA. The Construction Manager is Commodore Builders Corporation.
07/23/2026 04:00 PM UTC
MIL2201 Trade RFQ
Request for Qualifications for Thirteen (13) Trade Contractor Packages: Masonry ($2,368,500); Miscellaneous & Ornamental Iron ($229,800); Waterproofing, Dampproofing and Caulking ($231,500); Roofing & Flashing ($1,983,000); Glass & Glazing ($32,500); Tile ($101,500); Acoustical Tile ($226,500); Resilient Floors ($289,500); Painting ($273,600); Fire Protection Sprinkler System ($865,500); Plumbing ($1,038,500); HVAC ($3,244,000); Electrical ($6,816,000), for MIL – Camp Edwards – New Readiness Center, Bourne, MA. The Construction Manager is W.T. Rich Co., Inc.
07/27/2026 04:00 PM UTC
DCP2524 Sub Bids
DCP - Monson State Hospital Multiple Building Demolition – Phase 2 – Monson, MA, The project work consists of the abatement and demolition of fourteen (14) buildings on the campus of Monson State Hospital located in Monson, MA. Two of which are interconnected buildings designated as combined building numbers 22 & 23. All fourteen (14) buildings identified for demolition in the drawings shall either be traditionally abated of hazardous materials, demolished, and removed from the site, or removed from the site as bulk waste under Non-Traditional Work Plans (NTWP) to meet all requirements of the Contract Documents. The Category of Work is General Building Construction or Demolition. This Project includes the following Filed Sub-Bid: Masonry.
07/29/2026 04:00 PM UTC
SDP2301 Phase 2 Plumbing Re-Bid
Plumbing Re-Bid for: Plymouth County Sheriff Roof Replacement - Phase 2, Plymouth, MA. The project is the second phase roof replacement of the SDP Plymouth County Sheriff Department building. The areas to be reroofed comprise approximately 68,000 square feet out of the entire approximate 170,000 square foot roof. The new roof assembly will consist of vapor retarder, two layers of insulation (R-30 minimum), cover board, and PVC roof membrane. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Plumbing; HVAC; Electrical. The Category of Work is Roofing. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
07/30/2026 04:00 PM UTC
TRC2204 Trade RFQ
Request for Qualifications for Three (3) Trade Contractor Packages for Masonry ($1,800,000); Waterproofing, Dampproofing and Caulking, ($590,000) and Elevators, ($802,000) for TRC – Framingham Justice Center, Framingham, MA. This Project is for a new 120,000 to 130,000 GSF courthouse to be located in downtown Framingham on the site of the former Danforth Museum. The building will provide modern facilities for the District Court, Juvenile Court, Housing Court and the Probate and Family Court. The Construction Manager is Dimeo Construction Company.
07/30/2026 04:00 PM UTC
SDP2301 Phase 2
Plymouth County Sheriff Roof Replacement - Phase 2, Plymouth, MA. The project is the second phase roof replacement of the SDP Plymouth County Sheriff Department building. The areas to be reroofed comprise approximately 68,000 square feet out of the entire approximate 170,000 square foot roof. The new roof assembly will consist of vapor retarder, two layers of insulation (R-30 minimum), cover board, and PVC roof membrane. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Plumbing; HVAC; Electrical. The Category of Work is Roofing. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
08/10/2026 06:00 PM UTC
DCP2524
DCP - Monson State Hospital Multiple Building Demolition – Phase 2 – Monson, MA. The project work consists of the abatement and demolition of fourteen (14) buildings on the campus of Monson State Hospital located in Monson, MA. Two of which are interconnected buildings designated as combined building numbers 22 & 23. All fourteen (14) buildings identified for demolition in the drawings shall either be traditionally abated of hazardous materials, demolished, and removed from the site, or removed from the site as bulk waste under Non-Traditional Work Plans (NTWP) to meet all requirements of the Contract Documents. The Category of Work is General Building Construction or Demolition. This Project includes the following Filed Sub-Bid: Masonry.
08/11/2026 06:00 PM UTC
DOC2503
DOC – DOC Headquarters – Roof Replacement, 50 Maple Street, Milford, MA. The Project work consists of replacement of the roof assembly at the Department of Correction Headquarters. Work includes removal of existing ballasted EPDM roof assembly and replacement with EPDM membrane or thermoplastic membrane for the office tower, warehouse and connector totaling approximately 164,000 square feet. The Category of Work is Roofing.
08/18/2026 06:00 PM UTC
11 Solicitations

Closed Solicitations

Number Deadline
WSC1901 - Trade RFQ
Request for Qualifications for One (1) Trade Contractor Package: Waterproofing, Dampproofing & Caulking ($78,000), for Westfield State University - Renovate Parenzo Hall/Demo Mod Hall, Westfield, MA. This project is for renovations to Parenzo Hall to better fit the current needs of Westfield State University. The project will include addition of HVAC, sprinkler system, new windows, asbestos removal, updates for Building Code/ADA compliance, updates to Dever Auditorium, and demo of Mod Hall. The Construction Manager is Daniel O'Connell's Sons.
08/19/2021 04:00 PM UTC
DPH1641 - Trade RFQ
Request for Qualifications for Four (4) Trade Contractor Packages: Waterproofing, Dampproofing & Caulking ($475,479); Meta Windows ($2,779,942); Resilient Floors - Second Request ($1,234,288); Electrical - Second Request ($19,633,666), for Mass. Department of Public Health, Jamaica Plain Campus Tower Building Renovation, Jamaica Plain, MA. This project is for the phased renovation of an approximately 208,000 GSF, eight-story plus basement building that contains laboratory, administrative, and research space. Built in the 1970’s, this building is cast-in-place construction with MEP systems that warrant special construction due to the sophistication and complexity of the program and operations housed in the building. The building will remain occupied throughout construction and remain 24/7/365 operational. The Construction Manager is The Whiting-Turner Contracting Co.
08/18/2021 04:00 PM UTC
SDH1801
Hampden County Correctional Center, HVAC Code Deficiency Repairs, Ludlow, MA. This project is to correct ventilation-related issues within the three Inmate Housing Towers and five Support Buildings. Facility will remain occupied and fully operational. At Housing Towers, new rooftop support HVAC mechanical equipment & associated ductwork, electrical, and controls will be added. Cleaning of existing HVAC air distribution systems & equipment at Support Buildings. This project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Roofing & Flashing; HVAC; Electrical. The Category of Work is General Building Construction. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
08/17/2021 06:00 PM UTC
MBC1901 - Trade RFQ
Request for Qualifications for Thirteen (13) Trade Contractor packages: Masonry ($1,895,115); Miscellaneous & Ornamental Iron ($399,092); Waterproofing, Dampproofing & Caulking ($278,391); Roofing & Flashing ($720,019); Glass & Glazing ($68,958); Tile ($94,610); Acoustical Tile ($496,972); Resilient Floors ($389,640); Painting ($206,217); Fire Protection Sprinkler System ($436,138); Plumbing ($827,795); HVAC ($6,833,369); Electrical ($3,766,629), for Mass. Bay Community College - Health Science Center, Framingham, MA. This project is a new 4-story academic building containing approximately 71,000 SF of administration space, offices, classrooms, simulation rooms, student services and lounges, a cafe, toilet rooms, mechanical rooms, loading, and a parking field. The CM at Risk Firm is Lee Kennedy Co., Inc.
08/12/2021 04:00 PM UTC
DYS2102
Allen Hall Bathroom Renovations, Westborough State Hospital, Westborough, MA. This project is for the demolition of existing core gang shower rooms and gang toilet rooms to be replaced with four single use rooms that include a shower, lavatory, and water closet with one of the rooms to be fully ADA compliant. Also included is the demolition of existing single-use toilet rooms. Each of those rooms will be replaced with an ADA-compliant single-use room. Installation of all-new risers to serve the stacked bathrooms and feeding up from the basement level. A new hot water circ pump will be installed in the mechanical room. All fixtures will be ligature resistant. This project includes the following Filed Sub-Bids: Resilient Floors; Painting; Fire Protection; Plumbing; HVAC; Electrical. The Category of Work is General Building Construction.
08/06/2021 06:00 PM UTC
MBC1901 - Trade RFQ - Elevators 2nd Request
Request for Qualifications for One (1) Trade Contractor Package - Elevators - 2nd Request ($645,200), for Mass. Bay Community College - Framingham - Health Science Center, Framingham, MA. This project is a new 4-story academic building containing approximately 71,000 SF of administration space, offices, classrooms, simulation rooms, student services and lounges, a cafe, toilet rooms, mechanical rooms, loading, and a parking field. The Construction Manager is Lee Kennedy Co., Inc.
08/05/2021 04:00 PM UTC
ITD2002
ITD - McCormack Building, 8th Floor, Suite 812 Reconfiguration, Boston, MA. This project is for partial floor use reconfiguration, converting from data center into class "A" office space. Remove & replace existing partitions with new demountable partitions; remove & replace existing finishes; remove existing data center equipment; remove one existing duct riser; new HVAC; remove & replace sprinkler system; electrical & telecommunications upgrades. This project includes the following Filed Sub-Bids: HVAC; Electrical. The Category of Work is: General Building Construction.
07/30/2021 06:00 PM UTC
BHC1901 - Trade RFQ
Request for Qualifications for Three (3) Trade Contractor Packages: Early Fire Protection Sprinkler System ($36,000); Early Plumbing ($42,000); Early HVAC ($57,000), for Bunker Hill Community College - New Academic Student Success Center - Building E Renovation, Boston, MA. This project is for construction of a new building, partial renovation of E Building, which was constructed in 1973, the demolition of the M Building (modular building), and the replacement of the primary electrical infrastructure on the Charlestown Campus.
07/29/2021 04:00 PM UTC
DCP2056
Hurley/Lindemann Building Cooling Separation, Boston, MA. This project is to separate the existing cooling systems of the Hurley and Lindemann Buildings by installing a new chiller in the existing Lindemann Building mechanical room. This project also includes installation of a platform on the roof surrounding the existing cooling tower. This project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Electrical. The Category of Work is HVAC.
07/15/2021 06:00 PM UTC
DCP2135 - Trade RFQ
Request for Qualifications for Two (2) Trade Contractor Packages (Track 1): Resilient Floors - Track 1 ($33,000); Plumbing - Track 1 ($26,000), for the McCormack State Office Building - Future of Work Renovations, Boston, MA. This project is for construction of renovations within a 21-story building located next to the State House in downtown Boston. The scope of work for this Project involves a total of approximately 170,000 square feet on 13 separate floors for 11 distinct agencies. Areas of renovation generally include offices, open workstation areas, conference and hearing rooms, support spaces, and kitchenettes.
07/14/2021 04:00 PM UTC
261 - 270 of 451 Solicitations
1 2 23 24 25 27 29 30 31 45 46