Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
SDN2301
SDN - Securing IT and Med Trailers at Norfolk Sheriff, Dedham, MA. This project consists of a new addition to replace the existing medical administration trailer at the Norfolk County Sheriff’s Office facility. Work consists of the demolition and removal of the existing medical administration trailer to pour a new slab to extend the current corridor into an approximately 1,000SF building addition with painted concrete block walls, steel roof joists, and PVC membrane roof. The addition shall consist of a nursing station with shelving, a dry kitchenette with refrigerator only, open office, and 1 private office. This Project includes the following Filed Sub-Bids: Masonry; Roofing & Flashing; Metal Windows; HVAC; Electrical. The Category of Work is General Building Construction. Prior to obtaining Bid Documents, interested bidders must execute the Confidentiality Agreement, found on this project’s E-Bid Room page, and return the completed form to: bidroom.dcamm@mass.gov
05/19/2026 06:00 PM UTC
DCP2302 CM RFQ
Request for Qualifications for Construction Management Services for DCP – McCormack Infrastructure Upgrades, Boston, MA, This preliminary scope of this Project is to upgrade the mechanical and plumbing infrastructure in the McCormack building, a 23-story, 800,000 gsf office tower above an underground 4-story parking garage, in Boston. The scope of work is anticipated to include replacement of: Central risers' piping; Garage Ventilation & Exhaust; One water-cooled chiller.
05/22/2026 06:00 PM UTC
DCRRINKMC CM RFP
Request for Proposals for Construction Management Services for DCR - Charlestown - Emmons Horrigan O'Neil Memorial Rink, Charlestown, MA. Please note that Request for Proposal documents are available only to prequalified Construction Management firms, but a public component of this page has been created so a list of submitting firms may be viewed after the deadline.
05/27/2026 06:00 PM UTC
DCP2633
DCP – MCI Concord – UST Removal, Concord, MA. The project work consists of removal and disposal of two 25,000-gallon fuel Underground Storage Tanks outside the G Building Power Supply Building at MCI Concord. The work will include all operations necessary for environmental hazardous remediation preparation/monitoring and permanent off-site removal and disposal of these fuel Underground Storage Tanks compliant with all DCAMM, local, state and federal regulations with related site work and obtaining all necessary licenses, permits, and certificates. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
06/03/2026 06:00 PM UTC
DYS2201 Trade RFB
DYS Taunton - Southeast Regional Youth Service Center, Taunton, MA. Trade Bids for the following Trade Categories: Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing, and Caulking; Roofing and Flashing; Metal Windows; Glass and Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection Sprinkler Systems; Plumbing; HVAC; Electrical.
06/04/2026 04:00 PM UTC
SDE1902 Phase 2 Trade RFQ
Request for Qualifications for Fourteen (14) Trade Contractor Packages: Masonry ($2,487,677); Miscellaneous & Ornamental Iron ($619,645); Waterproofing, Dampproofing & Caulking ($341,302); Roofing & Flashing ($691,428); Metal Windows ($386,350); Glass & Glazing ($130,825); Tile ($28,035); Resilient Floors ($305,322); Painting ($187,122); Elevators ($256,000); Fire Protection Sprinkler System ($363,823); Plumbing ($1,663,977); HVAC ($2,560,622); Electrical ($3,400,000), for SDE – Middleton Jail and HOC – Medical & Kitchen Building/ISB Replacement (Phase 2), Middleton, MA. The Construction Manager is Commodore Builders Corporation.
06/08/2026 04:00 PM UTC
MMP 40
Fire Alarm and Fire Protection Maintenance Services for Massachusetts State House in Boston MA. DCAMM seeks the services of an experienced and qualified Fire Alarm Systems and Equipment and Fire Protection Systems and Equipment contractor, either licensed as an Electrical Contractor in Massachusetts or employs staff with Technician D Licenses, to enter a Fire Alarm and Protection Systems and Equipment Preventive Maintenance Service Contract to include testing, inspection, preventative maintenance (including all PM required parts and materials). This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
06/08/2026 06:00 PM UTC
MMP 39
Mechanical and Plumbing Preventive Maintenance and Control Center Monitoring Contract for Certain Buildings in Boston, Massachusetts. DCAMM seeks the services of an experienced and qualified Mechanical and Plumbing Preventive Maintenance Service contractor, either licensed as a Mechanical, Refrigeration and Plumbing Contractor to enter a Mechanical and Plumbing Preventive Maintenance and Control Center Monitoring Contract for the Massachusetts State House, McCormack, Hurley, and Lindemann Buildings in Boston, Massachusetts. Services and construction to include testing, inspection, preventative maintenance. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
06/10/2026 06:00 PM UTC
OCA2501 Sub Bids
OCA – Office of the Child Advocate Interior Retrofit McCormack Building 13th Floor, Boston, MA. The project consists of an interior renovation of approximately 5,000 SF of currently unoccupied space on Level 13 of the McCormack Building. The renovation includes a new layout with a mixture of private offices and shared offices, workstations and open collaboration spaces, a medium-sized conference room, training room, two huddle rooms, a new kitchenette and new wellness room. This Project includes the following Filed Sub-Bids: Acoustical Tile; Resilient Floors; Painting; HVAC; Electrical. The Category of Work is General Building Construction.
06/11/2026 04:00 PM UTC
OCA2501
OCA – Office of the Child Advocate Interior Retrofit McCormack Building 13th Floor, Boston, MA. The project consists of an interior renovation of approximately 5,000 SF of currently unoccupied space on Level 13 of the McCormack Building. The renovation includes a new layout with a mixture of private offices and shared offices, workstations and open collaboration spaces, a medium-sized conference room, training room, two huddle rooms, a new kitchenette and new wellness room. This Project includes the following Filed Sub-Bids: Acoustical Tile; Resilient Floors; Painting; HVAC; Electrical. The Category of Work is General Building Construction.
06/24/2026 06:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
IFM2103
Fire Alarm and Fire Protection Maintenance Services, Springfield Data Center, Springfield, MA. This project is to provide testing, inspection, preventive maintenance, repair, replacement and emergency services (24 hours a day, seven days a week) for all Fire Alarm Systems and Equipment (Fire Alarm S&E) and Fire Protection Systems and Equipment (Fire Protection S&E) in the referenced building. Term of contract is one year with four 1-year options to renew. This Project bid in accordance with M.G.L. Chapter 30 Section 39M Sitework Only Projects and Building Projects $50,000 to $150,000.
05/06/2021 06:00 PM UTC
DOC1805
MCI Norfolk - Wastewater Plant Replacement, Norfolk, MA. This project is for the replacement of the existing Membrane Biological Reactor plant with an activated sludge plant, with some elements of renovation. This project includes the following Filed Sub-Bids: Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing and Caulking; Painting; HVAC; Electrical. The Category of Work is Sewage and Water Treatment Plants. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
04/23/2021 06:00 PM UTC
DCP2121 HC1
Quabbin Building Demolition, Monson State Hospital, Palmer, MA. This project includes the removal of all structures of a connected building and the removal of all elements and safe disposal of all refuse as required by law off-site. The Category of Work is Demolition.
04/12/2021 06:00 PM UTC
DCP2053
Monson Steam and Condensate Pipe Immediate Repairs, Monson, MA. This project is for asbestos removal, including complete removal of a steam line and a condensate line, including all pipings, fittings, support structures, and Thermal System Insulation (TSI) ACM. Removal of TSI debris and removal of soils and vegetation surrounding the pipes. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
04/09/2021 06:00 PM UTC
DCP2045
Massachusetts Information Technology Center - Elevator Controls Replacement, Chelsea, MA. This project is for the partial and selective modernization of six (6) hydraulic passenger elevators. Installation of new elevator controls and electrical connections for new elevator controls, including testing. This project includes the following Filed Sub-Bids: Elevators; Electrical. The Category of Work is General Building Construction.
04/07/2021 06:00 PM UTC
IFM2102
Fire Alarm and Fire Protection Maintenance Services for Certain State Buildings, Boston, Lowell, and Salem, MA. This project is for the testing, inspection, preventive maintenance, repair, replacement and emergency services for all Fire Alarm Systems and Equipment and Fire Protection Systems and Equipment. This project is scheduled for one year to completion with four (4) option terms of one year each. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
03/22/2021 06:00 PM UTC
IFM2013
Fire Alarm and Fire Protection Maintenance Services for the Massachusetts State House, Boston, MA. This project is for the testing, inspection, preventive maintenance, repair, replacement and emergency services (24 hours a day, seven days a week) for all Fire Alarm Systems and Equipment (Fire Alarm S&E) and Fire Protection Systems and Equipment (Fire Protection S&E). This project is scheduled for one year to completion with four (4) option terms of one year each. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
03/19/2021 06:00 PM UTC
DCP2135 - CM RFQ
Request for Qualifications for Construction Management Services, McCormack State Office Building - Future of Work Renovations, Boston, MA. This Project consists of a multi-floor renovation of a 21-story office building. The scope of work involves a total of approximately 170,000 square feet on 13 separate floors for 11 distinct stare agencies. The areas of renovation generally include offices, open workstation areas, conference and hearing rooms, support spaces and kitchenettes. Firms interested in being prequalified must demonstrate that they have prior experience as a CM on at least three CM at Risk projects and have completed at least one project of a similar cost, complexity, type, and size as this project identified above and described further below. The prior CM at Risk projects must have been completed within the last ten (10) years. Firms must be certified in General Building Construction.
03/18/2021 06:00 PM UTC
DPH2101
MDPH Stables Building Roof Repair, Jamaica Plain, MA. For this project, existing slate shingle roof of approximately 7,000 square feet will be removed and replaced with a standing seam metal roof. Abatement of asbestos-containing materials is required. Three existing skylights will be replaced. Selective wood trim repair. Repair and re-painting of some interior gypsum wall board assemblies. The Category of Work is Roofing.
03/17/2021 06:00 PM UTC
DCP1527
Lindemann Building Envelope and Roof Repair, Boston, MA. This project is for the replacement of the existing roof as well as a series of concrete spall repairs, including in places of the specialized bush-hammered style of concrete. This project includes the following Filed Sub-Bids: Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing and Caulking; Roofing and Flashing; Plumbing. The Category of Work is General Building Construction.