Standard Documents

Name * Description
2020 Concrete and Catch Basin (2-18-2020) (189 KB)
Bid Tabulation - Awarded to Liberta
2020 Cracksealing (3-31-2020) (195 KB)
Bid Tabulation - Awarded to Bituminous Pavement Systems
2020 Line Striping (4-21-2020) (90.3 KB)
Bid Tabulation - Awarded to JD Striping
SR 91 N Turn Lane (5-12-2020) (255 KB)
Bid Tabulation - Awarded to Liberta
College-Hudson Street XWalk (6-2-2020) (48.4 KB)
Bid Tabulation - Awarded to Signal Service Company
Hudson-Aurora Rd-Hudson Park Drive and SR 91-Church-Park Crosswalk Enhancements (12-8-2020) (86.5 KB)
Bid Tabulation - Awarded to Signal Service Company
Valley View Detention Pond (9-1-2020) (177 KB)
Bid Tabulation - Awarded to Woodford Excavating
2020 Storm Sewer Lining (3-31-2020) (77 KB)
Bid Tabulation - Insight Pipe Contracting
2021 Asphalt Resurfacing (1-21-2021) (116 KB)
Bid Tabulation - Awarded to Perrin Asphalt
9 Documents

Upcoming Solicitations

Number Deadline
2023 Asphalt Resurfacing and Patching Program
The proposed work consists of the repair and resurfacing, with asphaltic concrete, of various streets and city-owned properties and asphalt patching of various streets and city-owned properties in the City of Hudson, Ohio.
02/07/2023 03:00 PM UTC
Terex Road Resurfacing (PID 112743)
The proposed work consists of the resurfacing of 1.1 miles of Terex Road from Londonairy Blvd. to Barlow Road in the City of Hudson, Ohio. Disadvantaged Business (DBE) Requirement. DBE participation goals (Subcontracts, materials, supplies) have been set on this project for those certified as DBEs in accordance with the TEA-21 (1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio Revised Code (O.R.C.).” At the beginning following the project identification the DBE goal designation is written, i.e. DBE Goal: 7%. WAIVER PROCESS FOR DBE GOALS: See ODOT LPA Template, Page 19, Good Faith Effort (GFEs).
02/14/2023 02:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Hines Hill Road/Stow Road and Norfolk Southern Track Quiet Zone Improvements
The proposed work consists of the installation of four (4), 6-inch tall, raised medians, each extending 100 feet from the gate arms located at the Norfolk Southern Railroad Crossings on Stow Road and Hines Hill Road in the City of Hudson, Ohio.
11/29/2022 02:30 PM UTC
Traffic Signal Maintenance
The proposed work consists of a preventative maintenance and repair program for City traffic signals in the City of Hudson, Ohio. The scope of work includes, but is not limited to, semi-annual preventative maintenance, signal repairs, upgrades, modifications, installations and/or deletions, and warranty-related services. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
11/15/2022 03:00 PM UTC
Snow Control Program for Cul-de-sacs - Contract A RE-BID
The proposed work consists of snow plowing of the designated cul-de-sacs within the City of Hudson, Ohio. The Snow Control Program for Cul-de-sacs has been divided into two separate contracts. Only Contract A is included in this RE-BID advertisement. This Contract A will be awarded to the lowest and best bidder, regardless of whether the same contractor is awarded Contract B via the original advertisement. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
11/01/2022 02:00 PM UTC
HVAC Maintenance and Repairs
The proposed work consists of the maintenance of all City HVAC units relative to equipment, personnel and materials required to perform this work. The scope of work involved includes, but is not limited to, preventative maintenance, quarterly maintenance, emergency maintenance/repairs and diagnostics. Units will be checked for proper operations, cleaning of units annually, as well as additional preventative maintenance services listed separately. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
10/18/2022 02:00 PM UTC
Snow Control Program for Cul-de-sacs
The proposed work consists of snow plowing of the designated cul-de-sacs within the City of Hudson, Ohio. The Snow Control Program for Cul-de-sacs has been divided into two separate contracts. Contracts A and B are included in this advertisement. Contractors may bid on each contract, but only one contract will be awarded per bidder. If the same contractor is the lowest and best bidder for both Contracts A and B, Contract B will be awarded first, and Contract A will be awarded to the next lowest and best bidder. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
09/27/2022 02:00 PM UTC
Atterbury Blvd. Culvert Extension
The proposed work consists of the installation of approximately 72 lineal feet of new 36” storm sewer, headwall, grading and restoration within an existing ditch line at 458 Atterbury Blvd. within the City of Hudson, Ohio.
09/27/2022 01:30 PM UTC
Middleton Road / Stow Road Signal Improvements (re-bid)
The proposed work consists of the signalization of the intersection of Middleton Road and Stow Road. Signal features are to include infrastructure for future connection into City’s adaptive signal system, preemption, and connection to adjacent existing school zone flashers. Project includes the removal of an existing overhead flashing stop control assembly and stop signs in the City of Hudson, Ohio.
09/13/2022 01:30 PM UTC
Snow and Ice Control Program for Public Properties
The proposed work consists of snow and ice control for City-maintained downtown sidewalks and parking lots, and City-owned public properties areas within the City of Hudson, Ohio. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
09/06/2022 02:30 PM UTC
Clock Tower Repair Project (re-bid)
The proposed work consists of necessary repairs and refurbishing to restore movement of the clock tower clock, to be performed by qualified antiquarian horologists, and to be completed in accordance of the Department of the Interior, National Park Service Standards for Restorations, in Hudson, Ohio.
09/06/2022 02:00 PM UTC
Historic Headstone Preservation Project
The proposed work consists of the structural repair and preservation of approximately 158 cemetery headstones that are in various states of damage and disrepair. The construction to properly make physical repairs, level and reset, clean and apply preservation methods to each headstone will follow industry standards as detailed in the scope of work. Contractor shall furnish all supplies and equipment needed to perform this work. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
08/18/2022 02:00 PM UTC
1 - 10 of 180 Solicitations