General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Division Street Box Culvert Repair
The proposed work includes the removal of a section of failed box culvert lid along Division Street, installing a new reinforced concrete slab in its place, and restoring the pavement in the City of Hudson, Ohio.
11/04/2025 02:30 PM UTC
Lake Forest Sidewalk and Road Realignment and Boston Mills Road Multi-Use Path (re-bid)
The proposed work on Lake Forest Drive includes the installation of approximately 1,800 LF of new five (5) foot wide Class C sidewalk, storm improvements, curbing, pedestrian improvements, driveway improvements, grading and restoration between Boston Mills Road and Essex Circle. The project also includes the realignment of Lake Forest Drive for approximately 230 feet. The proposed work on Boston Mills Road consists of the construction of approximately 3,600 feet of new 10’ wide multi-use path, including the installation of two timber boardwalks and a bridge over Lake Forest, an 8’ stone path through the Park will also be installed. Some of the existing multi-use paths along Boston Mills Road will also be used and upgraded between 115 Executive Parkway and Lake Forest Drive in the City of Hudson, Ohio.
11/04/2025 03:00 PM UTC
Fiber Construction Material Procurement
The purchase will involve fiber and related material (e.g., conduit, fiber, fiber closures, splicing material, demarks, ground closures, aerial attachment equipment, etc.) for use in the construction of the Fiber to the Home project in accordance with the specifications which are on file in the office of the Assistant IT Director. Procured materials are to be stored by Supplier until requested for delivery to the Fiber to the Home project site(s).
11/12/2025 03:00 PM UTC
Fiber to the Home - Year 1 - Area 1
The proposed work includes the installation of new fiber optic infrastructure, including approximately 16,800 lineal feet of 1.5-inch underground HDPE fiber conduit via horizontal directional drilling, 20,900 lineal feet of 2 x 1.5-inch underground HDPE fiber conduit (2 parallel conduit runs pulled together) via horizontal directional drilling, 7,250 lineal feet of new aerial fiber, approximately 54,000 lineal fiber of fiber optic cable (various strand count), the placement of underground fiber vaults and handholes, and the subsequent fiber optic cable installation and testing in the City of Hudson, Ohio. Bidders are required to provide a price for Labor and Material as well as an alternate bid for Labor Only.
11/12/2025 03:30 PM UTC
Demolition and Remediation at 5487 Sullivan Road
The proposed work consists of the demolition of 5487 Sullivan Road that includes a 1,488 square foot house and two 250 square foot sheds. The project also includes the removal of multiple vehicles and various rubbish and debris, including pallets, tires, household appliances, etc. Relevant local, state, and federal requirements regarding the abatement of hazardous materials, includes asbestos, will apply. Work is located in the City of Hudson, Ohio.
11/12/2025 04:00 PM UTC
Hudson Softener Media Replacement (re-bid)
The proposed work consists of the upgrading of Softener #4 at the City of Hudson Water Treatment Plant located at 572 W. Streetsboro Road. Work includes interior and exterior work, including installation of new 6” DeZurik influent and effluent valves for isolation of softener, removal and disposal of existing softener media, cleaning of softener vessel, inspection coordination by 3rd party contractor, and full media replacement, enlarging entry hatch to OSHA standards, structural rehabilitation of tank (pitwelds), disinfection, sandblasting, & epoxy coating of softener vessel. Work may also include partial or full replacement of internal tank components, disinfecting and epoxy coating and additional work related to Softener #3 in the City of Hudson, Ohio.
11/18/2025 02:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
General Cleaning Services
The proposed work consists of the cleaning of all City-owned/occupied buildings and properties, to include, but not limited to vacuuming, sweeping, mopping, hard surface floor care, dusting, waste receptacles, restrooms, carpet cleaning and any other miscellaneous cleaning tasks as requested. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
10/23/2025 02:00 PM UTC
Hudson Softener Media Replacement
The proposed work consists of the upgrading of Softener #4 at the City of Hudson Water Treatment Plant located at 572 W. Streetsboro Road. Work includes interior and exterior work, including installation of new 6” DeZurik influent and effluent valves for isolation of softener, removal and disposal of existing softener media, cleaning of softener vessel, inspection coordination by 3rd party contractor, and full media replacement, enlarging entry hatch to OSHA standards, structural rehabilitation of tank (pitwelds), disinfection, sandblasting, & epoxy coating of softener vessel. Work may also include partial or full replacement of internal tank components, disinfecting and epoxy coating and additional work related to Softener #3 in the City of Hudson, Ohio.
10/21/2025 01:30 PM UTC
2025 Leaf Disposal Services
The proposed work consists of allowance of dumping of the leaf material collected in the City of Hudson, Ohio, and acceptance of ownership of the material. The material may be reused by the new owner for any purpose. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
09/16/2025 02:00 PM UTC
Lake Forest Sidewalk and Road Realignment and Boston Mills Road Multi-Use Path
The proposed work on Lake Forest Drive includes the installation of approximately 1,800 LF of new five (5) foot wide Class C sidewalk, storm improvements, curbing, pedestrian improvements, driveway improvements, grading and restoration between Boston Mills Road and Essex Circle. The project also includes the realignment of Lake Forest Drive for approximately 230 feet. The proposed work on Boston Mills Road consists of the construction of approximately 3,600 feet of new 10’ wide multi-use path, including the installation of two timber boardwalks and a bridge over Lake Forest, an 8’ stone path through the Park will also be installed. Some of the existing multi-use paths along Boston Mills Road will also be used and upgraded between 115 Executive Parkway and Lake Forest Drive in the City of Hudson, Ohio.
09/10/2025 02:00 PM UTC
2025-2026 Residential Driveway Plowing Program
The proposed work consists of snow plowing services of residential driveways (and possible alternates involving snow clearing and salt application) to assist seniors and adults with disabilities within the City of Hudson, Ohio. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
08/26/2025 02:00 PM UTC
Pickleball Courts Lighting Installation
The proposed work consists of the furnishing of all necessary labor, supervision, tools, material, and equipment (except for equipment furnished by OWNER and installed by the CONTRACTOR) to complete all Work necessary for the Pickleball Courts Lighting Installation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
08/19/2025 02:00 PM UTC
Herrick Park Drive Storm Improvements
The proposed work consists of the installation of new 8” PVC SDR 35 storm pipe, 12” PVC SDR 35 storm pipe, 2-2 catch basins to improve overland drainage near 7410 Herrick Park Drive as well as tying the new storm system into the existing storm facilities on Herrick Park Drive and improvements to an existing storm ditch & infrastructure off of Benjamin Circle in the City of Hudson, Ohio.
08/19/2025 01:30 PM UTC
Preventative Maintenance & Relay Testing of the Eastside Substation - REBID
The proposed work consists of preventative maintenance and relay testing at the Eastside Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
08/12/2025 02:00 PM UTC
Towbridge Rear Yard Drainage Improvement
The proposed work consists of the reestablishment of an existing drainage ditch (Stefan’s Run) and cleaning and removing debris from the ditch for approximately 1,800 lineal feet to better promote positive flow of the existing upstream storm facilities in the City of Hudson, Ohio.
08/12/2025 01:30 PM UTC
Valley View Road Culvert Repair
This project consists of the removal and replacement of a culvert in an existing drainage ditch off Valley View Road on private property and the reestablishment of the drainage ditch for approximately 50 Lineal Feet downstream in the City of Hudson, Ohio
08/05/2025 02:30 PM UTC
1 - 10 of 278 Solicitations
← Previous 1 3 4 5 6 7 8 9 27 28