2017 Asphalt Resurfacing Program (132 KB) |
Bid Tabulation
| |
2017 Concrete Replacement Program (31.5 KB) |
Bid Tabulation
| |
2017 Storm Sewer Lining (26 KB) |
Bid Tabulation
| |
2017 Line Striping and Painting Program (62.9 KB) |
Bid Tabulation
| |
Atterbury Blvd Storm Structure Repairs (2017) (29.7 KB) |
Bid Tabulation
| |
2017 Crack Sealing (126 KB) |
Bid Tabulation
| |
2017 Crack Sealing - Re-bid.pdf (187 KB) |
Bid Tabulation
| |
Manor Drive Waterline and Storm Sewer Installation (2017) (158 KB) |
Bid Tabulation
| |
Repainting of Fire Hydrants on the Akron Water System (13.5 KB) |
Bid Tabulation
| |
Manor Drive Waterline and Storm Sewer Installation - REBID (184 KB) |
Bid Tabulation
| |
2018 Asphalt Program (73.9 KB) |
Bid Tabulation - Awarded to Ronyak Paving
| |
2018 Guardrail Replacement (67.5 KB) |
Bid Tabulation - Awarded to Lake Erie Construction
| |
Valley View Culvert Replacement (65.7 KB) |
Bid Tabulation - Awarded to CATTS Construction
| |
2018 Concrete Replacement Program (140 KB) |
Bid Tabulation - Awarded to Liberta
| |
Salt Storage and Bus Maintenance Garage (198 KB) |
Bid Tabulation - Awarded to Cavanaugh Building
| |
2018 Crack Sealing (99.5 KB) |
Bid Tabulation - Awarded to Asphalt Fabrics
| |
2018 Line Striping and Painting (69.5 KB) |
Bid Tabulation - Awarded to Dura Mark
| |
2018 Storm Sewer Lining (33.9 KB) |
Bid Tabulation - Awarded to Insight Pipe
| |
Seasons Road Interchange Signal Pole Procurement (11.4 KB) |
Bid Tabulation - Awarded to Path Master
| |
Hudson Drive Waterline (7-10-2018) (67 KB) |
Bid Tabulation - All Bids Rejected
| |
Hudson Drive Waterline - Rebid (8-16-2018) (183 KB) |
Bid Tabulation - All Bids Rejected
| |
S.R. 303 Butterfly Valve Replacement Project (10-23-2018) (61 KB) |
Bid Tabulation - All Bids Rejected
| |
City Administration Building ADA Ramp Installation - Rebid (10-23-2018) (25.2 KB) |
Bid Tabulation - All Bids Rejected
| |
2019 Asphalt Resurfacing Program (250 KB) |
Bid Tabulation - Awarded to Perrin Asphalt
| |
S.R. 303 Butterfly Valve Replacement Project - REBID (12-11-2018) (61.9 KB) |
Bid Tabulation - Awarded to M. Campbell Contracting
| |
N. Main St/Brandywine Drive Storm Sewer (Cemetery) Project (1-8-2019) (64 KB) |
Bid Tabulation - Awarded to Lake Co. Landscape
| |
City Admin Renovations & ADA Ramp - 1-29-2019 (79.6 KB) |
Bid Tabulation - All Bids Rejected
| |
2019 Concrete Program (2-5-2019) (189 KB) |
Bid Tabulation - Awarded to Set-in-Stone Contracting
| |
2019 Line Striping and Painting (3-5-2019) (78.6 KB) |
Bid Tabulation - Awarded to Dura Mark
| |
2019 Crack Sealing Program (2-26-2019) (92.4 KB) |
Bid Tabulation - Awarded to Asphalt Fabrics
| |
2019 Storm Lining (4-4-2019) (75.6 KB) |
Bid Tabulation - Awarded to Insight Pipe
| |
City Admin Renovations ADA Ramp (2-19-2019) (127 KB) |
Bid Tabulation - Awarded to Augere Construction
| |
Hudson Drive Waterline Instalaltion (6-4-2019) (91.2 KB) |
Bid Tabulation - Awarded to X-Press Underground
| |
Hudson Old School Green (6-19-2019) (86.5 KB) |
Bid Tabulation - Awarded to Vizmeg Landscape
| |
Owen Brown Street Remediation and Demolition Phase 2 - Bus Garage (82.7 KB) |
Bid Tabulation - Awarded to ProQuality Land
| |
Veterans Trails Phase 3 (130 KB) |
Bid Tabulation - Awarded to Eclipse Co., LLC
| |
Number | Deadline |
---|---|
2021 Asphalt Resurfacing and Patching Program
The proposed work consists of the repair and resurfacing, with asphaltic concrete, of various streets and city-owned properties, asphalt overlay of concrete streets, and work incidental to, as well as asphalt patching of various streets and city-owned properties in the City of Hudson, Ohio, in accordance with the specifications.
| 01/21/2021 02:30 PM UTC |
Number | Deadline |
---|---|
2019 Asphalt Resurfacing Program
The proposed work consists of the resurfacing and repairs with asphaltic concrete of various streets and city owned properties and asphalt overlay of concrete streets in the City of Hudson, Ohio.
| 12/18/2018 03:00 PM UTC |
S.R. 303 Butterfly Valve Replacement Project (re-bid)
The proposed work consists of the installation of three new 16-inch valves along the 16-inch water main on W. Streetsboro Street between 569 W. Streetsboro Street and 201 Boston Mills Road in the City of Hudson, Ohio.
| 12/11/2018 03:00 PM UTC |
Brine Well Construction Project for City of Hudson
The proposed work consists of furnishing all necessary labor, supervision, tools, material and equipment to complete each of the following project task items for construction of the Brine Well construction,
| 11/06/2018 02:00 PM UTC |
Owen Brown Street Remediation and Demolition, Phase I
The proposed work consists of the removal and abatement of asbestos containing materials (ACM) from structures, demolition of multiple structures including the removal of foundations and pavements, removal and disposal of the demolition debris and below-ground utilities proximate to the structures, limited soils removal, abatement of environmental hazardous materials, abandoning utility services and restoration of grading and stabilization of the areas disturbed by the demolition activity at the Hudson Public Power and Salt Barn located at 95 Owen Brown Street and structures at 100 Owen Brown Street in the City of Hudson, Ohio.
| 10/30/2018 02:30 PM UTC |
General Landscaping (re-bid)
The proposed work consists of professional grounds maintenance activities for City Greens, associated landscape beds and gardens, and restorative landscaping for City public improvements.
| 10/30/2018 02:00 PM UTC |
City Administration Building ADA Ramp Installation (re-bid)
The proposed work consists of the installation of an ADA accessible ramp at the City’s new administration building located at 1140 Terex Road in the City of Hudson, Ohio.
This project is funded in part with Community Development Block Grant Funds provided by The County of Summit Community and Economic Development under Summit County Executive Ilene Shapiro.
| 10/23/2018 02:00 PM UTC |
S.R. 303 Butterfly Valve Replacement Project
The proposed work consists of the installation of three new 16-inch valves along the 16-inch water main on W. Streetsboro Street between 569 W. Streetsboro Street and 201 Boston Mills Road in the City of Hudson, Ohio.
| 10/23/2018 01:30 PM UTC |
Hudson Northern Bulk Water Salt
The proposed work consists of delivery of bulk northern rock salt.
| 10/17/2018 01:30 PM UTC |
Hudson General Landscaping Contract 2019-2020
The proposed work consists of professional grounds maintenance activities for City Greens, associated landscape beds and gardens, and restorative landscaping for City public improvements.
| 10/02/2018 02:30 PM UTC |
City Administration Building ADA Ramp Installation
The proposed work consists of the installation of an ADA accessible ramp at the City’s new administration building located at 1140 Terex Road in the City of Hudson, Ohio.
This project is funded in part with Community Development Block Grant Funds provided by The County of Summit Community and Economic Development under Summit County Executive Ilene Shapiro.