General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
Tertiary Filter Upgrade - Water Reclamation Facility - RFQ
The City of Marysville is requesting Statements of Qualifications from Construction Manager at Risk (CMAR) organizations for the construction of the following Project, and for related pre-construction and procurement CMAR services: Tertiary Filter Upgrade – Water Reclamation Facility 50225-001 Statements of Qualifications demonstrating qualifications and ability to provide CMAR services and construct the Project shall be submitted to Cory Smith, Wastewater Superintendent via email to csmith@marysvilleohio.org until April 17, 2026 at 9:00 A.M. After that time, Marysville will no longer accept Statements of Qualifications. The CMAR Contract will include the following services and Work: • Construction Manager at Risk services including public sector construction, specifically at a wastewater treatment facility and procurement services seeking qualified construction subcontractors for specified Work packages. • Preconstruction services including, but not limited to, scheduling, cost estimating, constructability review, preliminary and final Guaranteed Maximum Price (GMP) development and open book pricing. Owner anticipates that the CMAR’s Contract Price will be approximately $3,000,000 with a range from $2,000,000 to $4,500,000 (Class IV estimated). The Project is anticipated to be fully funded using City Wastewater Funds with the CMAR pre-construction services and budgetary Contract Price included in the 2026-2027 fiscal year budget. The CMAR Contract has an expected start date September 2026 and duration for construction of 15 months. Project information and Proposal Documents for the CMAR Contract can be found on Bid Express (www.bidexpress.com). Questions about the Project should be posted on Bid Express. Selection of the Construction Manager at Risk will be made using a two-step process. • Step One: Owner will receive Statements of Qualifications. • Step Two: The most highly qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner’s consideration.
04/17/2026 01:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
2022 Water Treatment Chemicals - Ferric Chloride (Bulk)
The work consists of providing Ferric Chloride (Bulk) for the City of Marysville Water Treatment Facility operations during the 2023 calendar year.
12/12/2022 07:00 PM UTC
2023 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash for the City of Marysville Water Treatment Facility operations during the 2023 calendar year.
12/12/2022 07:00 PM UTC
Vine Street Pocket Park
This project is the construction of a new pocket park located on the vacant lot at the corner of 5th Street and Vine Street in Marysville, Ohio. A Pre Bid meeting will be held at City Hall. 209 South Main Street, Marysville, Ohio 43040 on Wednesday, November 30, 2022 at 2:00 PM
12/12/2022 07:00 PM UTC
33 Innovation Pak, Phase 3
The project consists of the following: · Public roadway extension (including curb and asphalt multi-use path) · 8” and 10” Sanitary Sewer and associated appurtenances · Street lighting system There will be a Pre-Bid Meeting held at City Hall, 209 South Main Street, Marysville, Ohio on November 30, 2022 at 1:00 p.m. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities. Bidders are encouraged to attend and participate in the conference.
12/12/2022 06:00 PM UTC
Town Run Culvert Replacement
The project consists of the following: • Rehabilitation of an existing concrete box culvert located under the former Fraternal Order of Eagles building (227 South Main Street, Marysville, OH 43040) • An alternate bid will be included for the complete removal and replacement of the box culvert structure There will be a Pre-Bid Meeting held at City Hall, 209 South Main Street, Marysville, Ohio on October 12, 2022 at 1:30 p.m. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities.
10/27/2022 05:30 PM UTC
Watkins Road Pump Station
The project consists of building a new sewage pumping station on a site owned by the City and generally consisting of the following aspects: A pump building along with a smaller building to house the biofilter. Major equipment associated with the facility include dry-pit submersible pumps, bioxide chemical feed system, biofilter odor control system, standby generator, onsite utilities, site development and paving, landscaping, and related systems. The engineer’s estimate for construction is $6,950,000. A pre-bid meeting will be held via teleconference on August 2, 2022 at 9:00 am local time. Pre-Bid Meeting - Microsoft Teams Join on your computer or mobile app: https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzI4NDE4NWMtMTUwNy00MzUzLTliYTItNDlmN2UwZTliOWM3%40thread.v2/0?context=%7b%22Tid%22%3a%2216ed5ab4-2b59-4e40-806d-8a30bdc9cf26%22%2c%22Oid%22%3a%22f78e6c5d-f43b-4ae2-af4a-496c1ca83d96%22%7d Meeting ID: 211 972 505 499 Passcode: LB5LJa Or call in (audio only): +1 513-818-0118,,929505785# United States, Cincinnati (877) 286-5733,,929505785# United States (Toll-free) Phone Conference ID: 929 505 785#
08/30/2022 06:00 PM UTC
Bishop Run Drainage Improvements
This project consists of the following: - Installation of two stormwater basins, approximately 500' of 60" storm conduit, 700' of concrete channel, and associated drainage structures - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. - Via Alternate Bids, this work may also contain the installation of approximately 250' of 36" storm conduit and associated structures. Via a separate alternate this work may also contain the replacement of approximately 950' of 24" storm conduit and associated structures
06/17/2022 05:00 PM UTC
Warner Road Utilities, Phase-1
This project entails the extension of sanitary and water along Warner Road. The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet. The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road. This project is a re-bid. The new bid opening date is June 10, 2022 at 1:15PM. There is NO pre-bid meeting for this project.
06/10/2022 05:15 PM UTC
Warner Road Utilities, Phase 1
This project entails the extension of sanitary and water along Warner Road. The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet. The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road. The date of Substantial Completion and the Engineer's Estimate are now listed in Addendum #1
04/29/2022 05:30 PM UTC
Fourth Street Bridge Replacement
The project will replace the existing reinforced concrete slab structure on 4th street over town run with a 14' x 10' precast reinforced concrete box culvert. The project includes full depth pavement replacement, curb and gutter, concrete sidewalk, building repairs, and other improvements. The total project length is 275 feet. The date of Substantial Completion is November 30, 2022, and the date of readiness for final payment is December 31, 2022. The City's Estimate is $749.500.00
04/06/2022 05:15 PM UTC
41 - 50 of 138 Solicitations
1 2 3 5 7 8 9 13 14