General Info

Business Logo

Great Rivers Greenway

3745 Foundry Way Suite 253, Saint Louis, MO 63110-4161
(314) 932-4907


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
GRG Bid# 2025-017-897E Mississippi Greenway NPS Building Access Controls/Security Upgrades at Gateway Arch National Park
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for GRG Bid# 2025-017-897E Mississippi Greenway NPS Building Access Controls/Security Upgrades at Gateway Arch National Park (897E) in St. Louis City, Missouri. The Gateway Arch National Park (GANP) Law Enforcement Division/Physical Security Branch requires a complete system replacement, to include software and hardware, of the legacy Andover Continuum Operating system with an HSPD-12/FIPS 201-3 compliant Personal Identity Verification (PIV) Access Control System. While the system hardware shall be FIPS 201-3 compliant, FICAM software is not included in this project. However, any servers or prerequisite software to FICAM shall be provided and installed in accordance with the manufacturer’s instructions. The existing Andover Continuum Access Control System is spread between four buildings, and includes various control panels, card readers, and input/outputs. Existing and new system reprogramming, including but not limited to database reentry, alarm and video system integrations are also included with the new access control system. All existing servers, software, control panels, boards, readers, and peripheral equipment are to be replaced and upgraded per the new design standards Prospective Bidders are required to be in attendance at the Pre-Bid Meeting, scheduled for 9am-12pm on September 4, 2025. This meeting will begin at the Maintenance Facility located at 201 Poplar Street, St. Louis, MO 63102. THE PLANS AND SPECIFICATIONS ARE PASSWORD PROTECTED. PLEASE EMAIL WILLIAM REIN, PROJECT MANAGER, AT WREIN@GRGSTL.ORG WITH YOUR REQUEST FOR THE PASSWORD AND INTENT TO BID.
09/19/2025 03:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
GRG Bid#2019-003-118A Gravois Greenway: Orlandos to River Des Peres Greenway - Phase 3 (118A)
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for 2019-003-118A Gravois Greenway: Orlando's to River Des Peres Greenway - Phase 3 - 118A in St. Louis County, Missouri. This work consists of The work includes (but is not limited to): earthwork, clearing and grubbing, grading, asphalt and concrete paving, curb and gutter, storm and sanitary sewer construction, installation of a railroad wheel stop, precast concrete boardwalk and foundations, decorative railings, bollards, retaining walls, temporary fencing, traffic control, SWPPP measures, landscaping, and signage and striping and includes furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications.
04/23/2019 07:00 PM UTC
GRG Bid #2019-002-402 Mississippi Greenway: Katherine Ward Burg Garden (402)
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for GRG Bid #2019-002-402 Mississippi Greenway: Katherine Ward Burg Garden (402) in St. Louis City, Missouri. This work consists of construction of a half-acre urban park including terraces, performance deck, screen wall, built in seating, curvilinear walls, a custom trellis and includes furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications.
04/16/2019 07:00 PM UTC
GRG Bid#2019-061-001 Mississippi: OCRB (061)
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for GRG Bid# 2019-061-001Mississippi Greenway: OCRB (061). This project includes substructure concrete repair to Piers No. 1, 2, 3, 4 and 11 as well as concrete removal and replacement of concrete deck joints at seven locations on the bridge. Project to include furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications.
02/04/2019 09:00 PM UTC
GRG Bid#2019-061-001 Mississippi: OCRB (061)
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for GRG Bid# 2019-061-001Mississippi Greenway: OCRB (061). This project includes substructure concrete repair to Piers No. 1, 2, 3, 4 and 11 as well as concrete removal and replacement of concrete deck joints at seven locations on the bridge. Project to include furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications.
02/01/2019 08:00 PM UTC
TAP & STP-9901(632) GRG Bid# 2018-118A-002 Gravois Greenway: Orlando's to River des Peres Greenway -- Phase 2 (118A)
Great Rivers Greenway (Developer) is soliciting electronic bids via Bid Express for TAP & STP-9901(632) GRG Bid# 2018-118A-002 Gravois Greenway: Orlando's to River des Peres Greenway -- Phase 2 (118A) in St. Louis County and St. Louis City, Missouri. This project is partially funded by federal funding and must comply with all applicable requirements of MoDOT's Local Public Agency regulations. This work consists of a 1.5-mile long pedestrian & multiuse trail from Avenue I in St. Louis County to the River des Peres Greenway, south of I-55 in St. Louis City and includes furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications. Great Rivers Greenway hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
08/23/2018 07:00 PM UTC
Centennial Greenway: Delmar Blvd and I170 Intersection (603A)
The scope of work includes grading, paving, signage, striping, landscaping, and traffic signals for Centennial Greenway: Delmar Blvd and I‐170 Intersection. The project length is approximately 0.2 miles.
07/26/2018 02:00 PM UTC
Mississippi Greenway:LKS Electric Upgrades (799) 02/23/2018 09:30 PM UTC
Deer Creek Greenway: Marshall Avenue Trailhead (243A)
The Marshall Avenue Trailhead is a unique public-private partnership that will result in the development of a trail connection and trailhead amenities to the newly expanded Deer Creek Greenway in Webster Groves, MO. Construction will include: concrete trail, pavilion, pump track, solar lighting, streambank restoration and other trailhead amenities.
02/01/2018 09:00 PM UTC
Maline Greenway: Bridges in Bella Fontaine Park 286
The Contractor shall perform the work as represented on the attached drawing and the specifications. The work to be done under this contract consists of the replacement of three pedestrian bridges in Bella Fontaine County Park in north St. Louis County, Missouri. The project will also renovate the existing trails and add a new connection under Lewis & Clark Blvd. to create a new alignment adjacent to the Maline Creek. St. Louis County Parks owns and operates the park and will maintain the greenway post-construction. Other partners are the municipalities of Bellefontaine Neighbors and Moline Acres, as well as the Missouri Department of Transportation, who owns and operates Lewis & Clark Blvd. The project work includes: Earthwork, clearing and grubbing, demolition of three (3) existing pedestrian bridges, removal of approximately 3,500 feet of existing asphalt trail, rehabilitation of approximately 2,500 feet of existing asphalt trail, construction of: three (3) new single span pedestrian bridges ranging in length from 99 feet to 129 feet; decorative bridge columns; approximately 660 stream feet of creek bank restoration (bio-stabilization); approximately 6,200 feet of new 10’ wide asphalt trail; 213 feet of sanitary sewer; sanitary manholes; approximately 300 lineal feet of storm sewer and associated storm structures; 100 lineal feet of cast-in-place concrete retaining wall ranging in height from 6.5 feet to 8.5 feet; decorative hand rail; fencing; one (1) rain garden; signage; trail amenities; and general landscape. The work consists of furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items noted above in accordance with all the requirements of these specifications, and the drawings made a part thereof. Existing site amenities damaged during construction shall be replaced at no cost to the owner.
01/26/2018 06:00 PM UTC
DP-5602(606) Repairing The Old Chain of Rocks Bridge
The Great Rivers Greenway District is soliciting sealed bids for Repairs to the Old Chain of Rocks Bridge over the Mississippi River, Federal Project DP-5602(606).
10/05/2017 08:00 PM UTC
51 - 60 of 63 Solicitations