General Info

Business Logo

Summit County, Ohio

538 East South Street, Akron, OH 44311
(330) 643-8559

Our mission is to serve the Summit County Community by maintaining and improving our region’s infrastructure, encouraging economic development, and ensuring a safe and efficient transportation system while protecting the environment.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CID 2023-114
2023 Cleaning, Videotaping and Mapping of Storm Sewers for Summit County Engineer’s Office. Engineer’s Estimate: $249,650.00 Completion Date: 120 days after notice to proceed.
03/29/2023 06:00 PM UTC
CID 2023-115
2023 Summit County Catch Basin Repair Program Reconstruction of inlets as directed by engineer, work will include pavement repair, seeding and mulching and other incidental work to complete the repairs.
04/12/2023 06:00 PM UTC
PID 108141 and 112797
Valley View Rd. Resurfacing Part 1 including Valley View and Olde 8 Rd. Intersection Improvement DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened and overlayed from intersection of State Route 8 to approximately 400 feet west of the intersection with Olde 8 Rd. PID 108141 includes State Route 8 to east edge of pavement of Olde 8 Rd. PID 112797 includes west edge of pavement of Olde 8 Rd. to 400 feet west. Substandard Shoulders will be widened and improved where possible. The existing cross slopes will be maintained Driveway located on the south side of roadway approximately 140 feet west of Intersection with Olde 8 Rd. will be reconstructed to be Right-In, Right-Out only. Existing storm sewer will be upgraded and/or replaced as needed. Project Length is 0.52 Miles Completion Date; November 30, 2023 Engineer's Estimate; 802,386.09
04/14/2023 06:00 PM UTC
PID 113176
Project Name: Swartz Road Resurfacing, PID 113176 DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened and overlaid from intersection with South Main St. to the City of Akron limits, approximately 540 feet east of the intersection with Glenmount Avenue. Substandard Shoulders will be widened and improved. The existing cross slopes will be maintained. Existing roadway curve located 675 feet east of S. Main St. will be realigned to maintain clearance to utility poles. Existing roadway curve located 550 feet west of Glenmont Ave. will be realigned to maintain clearance to existing buildings Completion Date: October 30, 2023 Engineer's Estimate: 952,500.01
04/17/2023 06:00 PM UTC
PID 117468
Non-Complex Design/Build for SUM-CR 050-0.88 (South Main St. Bridge Rehabilitation) Design/Build for SUM-CR 050-0.88 (South Main St. Bridge over Nimisila Creek Rehabilitation) The work includes removal of existing superstructure and replacement with a prestressed box beam bridge with composite deck. Additional work includes triple steel tub railing, new approach slabs, guardrail and maintenance of traffic. Completion Date November 15, 2023 DBE GOAL 10%: Engineer's Estimate: $725,500.00
04/24/2023 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CID 2023-104
Project Number: Project Name: 2023 Summit County Regional 422 Resurfacing Program Project Location: Various locations in Summit County Engineer's Estimate: $709,268.00 Completion Date: September 1, 2023
03/23/2023 06:00 PM UTC
CID 2023-100
Project Number: CID 2023-100 Project Name: 2023 Summit County Regional 405 Resurfacing Program Project Location: Various Locations in Summit County Engineer's Estimate: $2,081,397.10 Completion Date: September 1, 2023
03/23/2023 06:00 PM UTC
CID 2023-416
2023 SCE Guardrail Program Replacing guardrail and/or bridge rail at six bridge locations through out the county. Engineer's estimate: Completion date: July 15, 2023
03/14/2023 06:00 PM UTC
CID 2023-103
Project Number: CID 2023-103 Project Name: 2023 Summit County Regional Concrete Pavement Repair Program Project Location: Bath, Copley, Sagamore, Twinsburg Twps. and Village of Lakemore Engineer's Estimate: $661,350.00 Completion Date: September 30, 2023
03/09/2023 07:00 PM UTC
CID 2023-101
Project Name: 2023 Summit County 441 (449) Resurfacing Program -North Project Location: Various Locations in Norther Summit County Engineer's Estimate: $3,418,713.05 Completion Date: October 15, 2023
03/09/2023 07:00 PM UTC
CID 2023-102
2023 Summit County 441 (449) Resurfacing Program - South Project Location: Various Locations in Summit County Engineer's Estimate: 1,019,450.50 (base bid) Completion Date: September 30, 2023
03/09/2023 07:00 PM UTC
PID 108200
Roadway Minor Rehab – Existing roadway to be widened and overlayed. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length os 0.90 Miles Completion Date; September 30, 2023 Engineer's Estimate: $1,108,207.00
02/09/2023 07:00 PM UTC
PID 113945
SUM-CR 239-01.04 Christman Rd. Bridge over Nimisila Reservoir Replacement of bridge on Christman Road over the Nimisila Reservoir with an entire new structure. Curs/Parapets will be constructed along with a 12-foot-wide future multi-use path (separated by a concrete barrier) on the west side of the bridge. DBE GOAL 10%: Completion Date; September 30, 2023 Engineer's Estimate: $1,352,000.00
01/13/2023 07:00 PM UTC
PID 113152
SUM-CR 137-0.02 Pressler Rd. Bridge over S. Fork of Tuscarawas River Replacement of the two-span concrete slab structure carrying Pressler Road (CR 137) over South Fork Tuscarawas River. The work includes removal of the existing bridge and replacement with a new composite concrete box beam bridge on new foundations. Additional work items include new approach slabs, replacement of roadway approach pavement, rock channel protection, shoulders, and guardrail each side of the bridge, and maintaining traffic DBE GOAL 10%: Completion Date; October 30, 2023 Engineer's Estimate: $944,683.18
12/15/2022 07:00 PM UTC
PID 108453
Akron Cleveland Road Resurfacing (CH 16) Scope of work; Roadway Minor Rehab – Existing roadway to be milled, widened, and overlaid form the City of Cuyahoga Falls north Corporation Limit to the Village of Boston Heights south Corporation Limit. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Project length is 1.56 miles. DBE GOAL 7%: Completion Date; September 30, 2022 Engineer's Estimate: 1,175,352.45
08/26/2022 06:00 PM UTC
1 - 10 of 18 Solicitations
← Previous 1