PID 116703
Roadway Minor Rehab – Existing roadway to be milled, widened and overlayed from approximately 400 feet west of the intersection with Olde 8 Rd. to Intersection of Dunham Rd. Substandard Shoulders will be widened and improved where possible. The existing cross slopes will be maintained The northwest bound approach to the intersection with North Boyden Road will be widened to accommodate a revised lane configuration of a dedicated left turn and a combined through and right turn lane. Project Length is 1.46 Miles DBE GOAL 8%: Completion Date; May 30, 2026 Engineer's Estimate: $1,409,424.66
08/08/2025 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
PID 108200 R
White Pond Road Resurfacing DBE GOAL 7%: Description of Job: Existing roadway to be widened and overlaid. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length of 0.90 Miles Completion Date: September 30, 2022, Engineer's Estimate: $1,228,618.30
04/15/2022 06:00 PM UTC
PID 108454
Olde 8 Road Resurfacing DBE GOAL 7%: Existing roadway to be milled, widened, and overlaid form the Northfield Center Township southern border to the south end of the intersection return at Highland Rd. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Olde Eight Road will be widened on the north and south approaches to the intersection with Twinsburg Rd. to add a northbound and southbound left-turn lanes. The existing box culvert 470 feet north of Lighthouse Lane will be extended. Project length is 1.19 miles. Completion Date; September 30, 2022 Engineer's Estimate: 1,094,973.00
04/15/2022 06:00 PM UTC
PID 108200
DBE GOAL 7%: Description of Job: Existing roadway to be widened and overlaid. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length of 0.90 Miles Completion Date: September 30, 2022 Engineer's Estimate: $1,085,382.90
02/28/2022 07:00 PM UTC
61 - 63 of 63 Solicitations