General Info

Business Logo

Summit County, Ohio

538 East South Street, Akron, OH 44311
(330) 643-8559

Our mission is to serve the Summit County Community by maintaining and improving our region’s infrastructure, encouraging economic development, and ensuring a safe and efficient transportation system while protecting the environment.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CID#2026-100
The proposed work consists of resurfacing various County, Bath Twp., Richfield Twp., Springfield Twp. and Twinsburg roads. The project will include: milling and spot leveling as directed by the Engineer, resurfacing a surface course of Item 405 Bituminous Cold Mix and Item 422 Chip Seal and Special – Fog Seal. The following list describes the scope of work for each road. Engineer’s Estimate; $1,435,914.00 Completion Date; September 1, 2026
03/10/2026 06:00 PM UTC
CID#2026-104
This work shall consist of furnishing all labor, equipment and material, and in performing all operations necessary for applying Item 441 Asphalt Concrete, Leveling Course as directed by the Engineer, Item 422 Chip Seal, Item Special Fog Seal and other miscellaneous items. Engineer’s Estimate $1,285,431.00 (Base Bid) Completion Date: September 1, 2026
03/10/2026 06:00 PM UTC
CID#2026-103
Removal and replacement of concrete pavement, sidewalks, and curbs on various roads in Bath, Copley, Sagamore, Springfield and Twinsburg Townships. Engineer's Estimate: $733,619.00 Completion Date: September 30, 2026
03/24/2026 06:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CID#2026-101
The proposed work consists of resurfacing various County, Copley Twp and Springfield Twp. The project will include: milling, making pavement repairs, Chip Seal prior to resurfacing, an asphalt concrete leveling and surface course,and applying new pavement markings. The above items will be as directed by the Engineer. The following list describes the scope of work for each road. Engineer’s Estimate; $1,321,959.30 Completion Date; September 15, 2026
02/27/2026 07:00 PM UTC
CID# 2026-102
The proposed work consists of resurfacing various County, Bath Twp., Summit Mtro Parks, City of Munroe Falls, Richfield Twp., Sagamore Hills Twp., Summit Metro Parks and Twinsburg Twp. The project will include: milling, making pavement repairs as directed by the Engineer, Chip Seal prior to resurfacing, an asphalt concrete surface course applying new pavement markings. The following list describes the scope of work for each road. Engineer’s Estimate; $4,891,734.60 Completion Date; October 30, 2026
02/27/2026 07:00 PM UTC
PID 117489
SBE GOAL 10%: Description of Job: The work includes Design/Build Snyder Ave bridge over Tuscarawas River including 12” water Line relocation. Completion Date: November 30, 2026 Engineer's Estimate: $1,588,900.00
02/26/2026 07:00 PM UTC
CID 2025-118
Project consists of constructing a new traffic signal with pedestrian push buttons at the intersection of Canton Road and Sanitarium Road. The project also includes new curbing, curb ramps and approximately 500 feet of sidewalk. Completion Date: June 30, 2026 Engineer's Estimate: $396,178.00
10/31/2025 06:00 PM UTC
NCT 2025-001
The project includes full depth pavement replacement of an existing 1750 ft. of Bayberry Drive. Including approximately 1200 ft. of new storm sewer system and new curb and cutter.
10/10/2025 06:00 PM UTC
PID 116703
Roadway Minor Rehab – Existing roadway to be milled, widened and overlayed from approximately 400 feet west of the intersection with Olde 8 Rd. to Intersection of Dunham Rd. Substandard Shoulders will be widened and improved where possible. The existing cross slopes will be maintained The northwest bound approach to the intersection with North Boyden Road will be widened to accommodate a revised lane configuration of a dedicated left turn and a combined through and right turn lane. Project Length is 1.46 Miles DBE GOAL 8%: Completion Date; May 30, 2026 Engineer's Estimate: $1,409,424.66
08/08/2025 06:00 PM UTC
CID 2025-115
Replacement and/or reconstruction of various types of catch basins/inlets for Summit County, Bath and Sagamore Hills Townships including miscellaneous work and restoration. Completion Date: November 30, 2025 Engineer's Estimate: $139,250.00
06/13/2025 06:00 PM UTC
CID 2025-105
This work shall consist of furnishing all labor, equipment and material, and in performing all operations necessary for the rejuvenation of and in-depth sealing of asphaltic-concrete surface course by spray application of a cationic rejuvenating agent composed of petroleum oils and resins emulsified with water, complete, in accordance with the specifications and subject to the terms and conditions of the contract. Completion Date: September 1, 2025 Engineer Estimate: $151,248.00
05/23/2025 06:00 PM UTC
CID 2025-106
The work shall consist of preparing and sealing cracks per ODOT specification Item No. 423 Crack Sealing, Hot Applied, Type IV. Note that all Township roads that have concrete curb and gutter will require the gutter and pavement joint to be sealed. The engineer also reserves the right to increase/decrease the estimated quantities. Completion Date: September 1, 2025 Estimate: $137,824.09
05/01/2025 06:00 PM UTC
CID 2025-107
The work shall consist of preparation of pavement and furnishing and installing Pavement markings per ODOT Item 642 as directed by the specifications. Completion Date; September 30, 2025 Engineer's Estimate: $307,614.69
05/01/2025 06:00 PM UTC
1 - 10 of 69 Solicitations
← Previous 1 3 4 5 6 7