General Info

Business Logo

Summit County, Ohio

538 East South Street, Akron, OH 44311
(330) 643-8559

Our mission is to serve the Summit County Community by maintaining and improving our region’s infrastructure, encouraging economic development, and ensuring a safe and efficient transportation system while protecting the environment.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CID# 2026-115
The proposed work consists of structure repairs for the existing prestreessed concrete box beams, abutment and piers. Removal and replacement of the existing bridge railing, bridge terminal assemblies, approach guardrail and anchor assemblies. Also included in the work is the replacement of bridge expansion joints with polymer modified expansion joint. Engineer’s Estimate; $309,875.00 Completion Date; September 30, 2026
05/08/2026 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CID#2026-107
The work shall consist of preparation of pavement and furnishing and installing Pavement markings per ODOT Item 642 as directed by the specifications. Completion Date; September 30, 2026 Engineer's Estimate: $472,146.61
04/09/2026 06:00 PM UTC
CID#2026-105
This work shall consist of furnishing all labor, equipment and material, and in performing all operations necessary for the rejuvenation of and in-depth sealing of asphaltic-concrete surface course by spray application of a cationic rejuvenating agent composed of petroleum oils and resins emulsified with water, complete, in accordance with the specifications and subject to the terms and conditions of the contract. Completion Date: September 1, 2026 Engineer Estimate: $205,895.00
04/03/2026 06:00 PM UTC
CID#2026-109
Scope of work Summit County Akron Peninsula Rd Culvert, culvert no. 10-30984 Removal and replacement of an existing 24” CMP Culvert with a new 30” HDPE culvert and headwalls. Also includes pavement replacement, rock channel protection and regrading embankment at et ends of the culvert. Medina Line Rd Culvert, culvert no. 2- 826686 Partial removal of stone headwall, full removal of culvert and replacement with 30” HDPE conduit New headwall and embankment reconstruction. The project also includes pavement and guardrail replacement and regrading of stream to enter new culvert. Completion Date: September 15, 2026 Engineer's Estimate: $210,212.00
04/03/2026 06:00 PM UTC
CID#2026-106
The work shall consist of preparing and sealing cracks per ODOT specification Item No. 423 Crack Sealing, Hot Applied, Type IV. Note that all Township roads that have concrete curb and gutter will require the gutter and pavement joint to be sealed. The engineer also reserves the right to increase/decrease the estimated quantities. Completion Date: September 1, 2026 Engineer Estimate: $177,187.58
03/31/2026 06:00 PM UTC
CID#2026-103
Removal and replacement of concrete pavement, sidewalks, and curbs on various roads in Bath, Copley, Sagamore, Springfield and Twinsburg Townships. Engineer's Estimate: $733,619.00 Completion Date: September 30, 2026
03/24/2026 06:00 PM UTC
CID#2026-104
This work shall consist of furnishing all labor, equipment and material, and in performing all operations necessary for applying Item 441 Asphalt Concrete, Leveling Course as directed by the Engineer, Item 422 Chip Seal, Item Special Fog Seal and other miscellaneous items. Engineer’s Estimate $1,285,431.00 (Base Bid) Completion Date: September 1, 2026
03/10/2026 06:00 PM UTC
CID#2026-100
The proposed work consists of resurfacing various County, Bath Twp., Richfield Twp., Springfield Twp. and Twinsburg roads. The project will include: milling and spot leveling as directed by the Engineer, resurfacing a surface course of Item 405 Bituminous Cold Mix and Item 422 Chip Seal and Special – Fog Seal. The following list describes the scope of work for each road. Engineer’s Estimate; $1,435,914.00 Completion Date; September 1, 2026
03/10/2026 06:00 PM UTC
CID# 2026-102
The proposed work consists of resurfacing various County, Bath Twp., Summit Mtro Parks, City of Munroe Falls, Richfield Twp., Sagamore Hills Twp., Summit Metro Parks and Twinsburg Twp. The project will include: milling, making pavement repairs as directed by the Engineer, Chip Seal prior to resurfacing, an asphalt concrete surface course applying new pavement markings. The following list describes the scope of work for each road. Engineer’s Estimate; $4,891,734.60 Completion Date; October 30, 2026
02/27/2026 07:00 PM UTC
CID#2026-101
The proposed work consists of resurfacing various County, Copley Twp and Springfield Twp. The project will include: milling, making pavement repairs, Chip Seal prior to resurfacing, an asphalt concrete leveling and surface course,and applying new pavement markings. The above items will be as directed by the Engineer. The following list describes the scope of work for each road. Engineer’s Estimate; $1,321,959.30 Completion Date; September 15, 2026
02/27/2026 07:00 PM UTC
PID 117489
SBE GOAL 10%: Description of Job: The work includes Design/Build Snyder Ave bridge over Tuscarawas River including 12” water Line relocation. Completion Date: November 30, 2026 Engineer's Estimate: $1,588,900.00
02/26/2026 07:00 PM UTC
1 - 10 of 76 Solicitations
← Previous 1 3 4 5 6 7 8