General Info

Business Logo

Lake County Engineer's Office

105 Main Street, Suite A205, Painesville, OH 44077
(440) 350-2770


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Painesville Township Park Resurfacing Project, Painesville Township, Ohio, LCE Project No. 2026-009
The work covered by the plans and specifications includes pavement planing of 2", partial depth repairs, 2" asphalt concrete, intermediate course and a single chip seal with fog seal for surface and related items.
04/07/2026 02:00 PM UTC
Lake County Resurfacing Project-2026, Lake County, Concord Township, Leroy Township & Painesville Township LCE Project No. 2025-020
The work covered by the plans and specifications included: Pavement planing, partial and full depth pavement repairs, intermediate course, asphalt surface course and related items.
04/08/2026 03:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Hopkins Road Culvert Improvements and Haines Road Culvert Improvements, City of Mentor and Madison Township LCE Project No. 2022-011
The work covered by the plans and specifications includes: Clearing and Grubbing, portions of structure removed, construction of Concrete Masonry headwalls, drainage improvements, and a conduit renewal application using Cementous spray liner. The project also includes linear grading and guardrail replacement and other associated work shown on the plans. Traffic is to be maintained as per the construction plans.
03/18/2026 03:00 PM UTC
Lake County Intersection Re-Alignment Project, Painesville Township & Concord Township, Ohio OPWC No. DGAC07 LCE Project No. 2025-001
The work covered by the plans and specifications includes; pavement and base removal, excavation, subbase courses, pavement planing, partial depth pavement repairs, fabric interlayer, asphalt intermediate course, asphalt surface course and related items.
03/04/2026 04:00 PM UTC
Cascade Road Resurfacing Project - Phase I Concord Township, Ohio Bid Out: 2026 OPWC No. CG65AC/CG66AC LCE Project No. 2025-016
Cascade Road shall be planed at a depth of two inches (2”) from Williams Road going east approximately 5,270 feet (all grindings shall be delivered to Concord Township unless otherwise noted) followed by the installation of two inches (2”) of asphalt concrete, intermediate course, Type 1. A single chip seal with fog seal will be installed as the surface course. Guardrail removal and replacement, in kind, shall be completed in this section of roadway resurfacing as well.
02/24/2026 03:00 PM UTC
Manchester Road Bridge Replacement, Village of Perry, Lake County, Ohio PID 121606, LCE Project 2021-006
This Project consists of the replacement of the Manchester Road Bridge over Red Mill Creek in the Village of Perry, Lake County, Ohio. The existing bridge and the existing pedestrian bridge next to it will be removed as per the plans. The proposed bridge is a single span galvanized steel beam bridge with a composite reinforced concrete deck with reinforced concrete semi-integral abutments supported on driven steel H-piles. A 5' sidewalk will be on the proposed bridge. This project also includes roadway approach work including guardrail and other associated work shown on the plans. This is a State Funded Exchange Project with a 5% Edge Goal and Department of Commerce State Prevailing Wage rates apply.
07/23/2025 03:00 PM UTC
LAK-St. Clair Street Bridge Overlay City of Painesville & Fairport Harbor, Ohio LCE Project No. 2021-006 Federal Project No. E240628 DBE Goal 8%
The work covered by the plans and specifications includes: All plant fabrication, labor, equipment, supplies and materials in performing all operations necessary for the complete overlay of the existing Saint Clair Street Bridge over the Grand River and all associated appurtenances at the border of the City of Painesville and the Village of Fairport Harbor, Ohio. The contractor shall provide the construction of the work to be performed. All work under this contract shall be completed by October 17, 2025.
05/28/2025 03:00 PM UTC
Lake County Road Department Salt - 2025, Painesville, Ohio, LCE Project No. 2025-006
Bid for Lake County Road Department Salt supply.
05/14/2025 03:00 PM UTC
County Road Pavement Markings - 2025, Lake County, Ohio LCE Project No. 2025-004
The work covered by the plans and specifications includes: Application of centerlines, edge lines, and related work on various County and Township roads. All work under this contract shall not start until September 2, 2025, and must be completed by October 31, 2025
05/14/2025 03:00 PM UTC
Roadway Materials - 2025 Lake County Engineers Road Department, Ohio LCE Project No. 2025-003
Roadway Materials, including Limestone and Asphalt Concrete to be utilized by the Lake County Engineer's Road Department
04/16/2025 03:00 PM UTC
Pavement Markings - SR2 - 2025, Lake County, Ohio, LCE Project No. 2025-005
Application of centerlines, edge lines, and related work on State Route 2 and the various interchanges. All work under this contract shall be completed by October 31, 2025.
04/16/2025 03:00 PM UTC
Heatherstone Village Roadway Improvements - Fanwood Drive, Garwood Drive, Radley Drive & Westfield Circle, Painesville Township, Ohio<OPWC No. CG06AB/CG07AB LCE Project No. 2025-007
The work covered by the plans and specifications includes full depth concrete removal, 4” base removal, subgrade repair as needed, geotextile fabric as needed, 4” drainage base, rigid pavement replacement, curb drains, and related items.
04/01/2025 02:00 PM UTC
1 - 10 of 74 Solicitations
← Previous 1 3 4 5 6 7 8