General Info

Business Logo

Lake County Engineer's Office

105 Main Street, Suite A205, Painesville, OH 44077
(440) 350-2770


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Painesville Township Park Resurfacing Project, Painesville Township, Ohio, LCE Project No. 2026-009
The work covered by the plans and specifications includes pavement planing of 2", partial depth repairs, 2" asphalt concrete, intermediate course and a single chip seal with fog seal for surface and related items.
04/07/2026 02:00 PM UTC
Lake County Resurfacing Project-2026, Lake County, Concord Township, Leroy Township & Painesville Township LCE Project No. 2025-020
The work covered by the plans and specifications included: Pavement planing, partial and full depth pavement repairs, intermediate course, asphalt surface course and related items.
04/08/2026 03:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Copperfield, Dorthea & Hawk Ridge Roadway Improvements, Painesville Township, OPWC No. CG29AA, LCE No. 2023-017
Excavation, base course, asphalt concrete, non-reinforced Portland Cement concrete pavement, concrete curb gutter, and related items.
03/26/2024 02:00 PM UTC
Lake County Resurfacing Project - 2024, Lake County, Lake County Animal Shelter, Concord Township and Painesville Township, Ohio LCE Job No. 2023-018
The work covered by the plans and specifications includes: Pavement planing, partial depth pavement repairs, fabric, asphalt Intermediate course, asphalt surface course, guardrail, storm sewer and related items. All partial depth repair work for Bates Road, Brakeman Road, Lockwood Road, Blair Road and Paine Road shall be completed by May 31, 2024. Work on Wintergreen Hill Drive may not begin until June 10, 2024 due to storm sewer work. All work under this contract shall be completed by August 16, 2024.
03/20/2024 03:00 PM UTC
Lockwood Road Reconstruction Project, Madison Township, Ohio, OPWC No. DGAA10, LCE Project No. 2023-004
The work covered by the plans and specifications includes: excavation, cold in-place recycling, fabric, asphalt intermediate course, asphalt surface course, mastic chip seal, and related items.
12/06/2023 04:00 PM UTC
Paine Road Retaining Wall and Bridge Replacement, Leroy Township, Ohio, LCE Project No. 2022-014
All plant fabrication, labor, equipment, supplies and materials in performing all operations necessary for the replacement of an existing retaining wall and culvert on Paine Road in Leroy Township with the construction of a drilled shaft with soldier piles and lagging retaining wall and a reinforced concrete 3-sided frame culvert on spread footings and all proposed appurtenances. The work also includes pavement planning, asphalt intermediate and surface courses, guardrail, storm sewer and related items. All work under this contract shall be completed by Friday, September 6, 2024.
11/08/2023 04:00 PM UTC
Callow Road Reconstruction Project, Phase I, OPWC, LCE Project No. 2023-013
Work under this contract shall consist of: cold in-place recycling, single chip seal surface, and related items. The intent is to have two-way traffic maintained throughout the project area as practicable.
07/11/2023 02:00 PM UTC
LAK-(CR535-0.24) Booth Road Bridge Re-Bid; City of Kirtland, Ohio; Federal Project No. E230160; PID No. 117512; LCE Project No. 2022-018; DBE Goal 8%; Prepared By: James R. Gills, PE, PS, Lake County Engineer
The work covered by the plans and specifications includes: All plant fabrication, labor, equipment, supplies and materials in performing all operations necessary for the complete replacement of the existing Booth Road Bridge superstructure with all associated appurtenances over Stoney Brook in the City of Kirtland, Ohio. The Contractor shall provide the design and construction of the work to be performed. All work under this contract shall be completed by Friday, August 30, 2024.
06/21/2023 03:00 PM UTC
LAK-(CR711-0.59) Bishop Road Bridge; City of Willoughby Hills, Ohio; Federal Project No. E230248; PID No. 117510; LCE Project No. 2022-017; DBE Goal 10%; Prepared by: James R. Gills, PE, PS, Lake County Engineer
All plan fabrication, labor, equipment, supplies and materials in performing all operations necessary for the complete replacement of the existing Bishop Road Bridge over an unnamed stream with a new bridge and all associated appurtenances in the City of Willoughby Hills, Ohio. The contractor shall provide the design and construction of the work to be performed. All work under this contract shall be completed by November 11, 2024.
04/26/2023 03:00 PM UTC
LAK-(CR535-0.24) BOOTH ROAD BRIDGE; City of Kirtland, Ohio; Federal Project No. E230160; PID No. 117512; LCE Project No. 2022-018; DBE GOAL 8%; Prepared by: James R. Gills, PE, PS, Lake County Engineer
All plant fabrication, labor, equipment, supplies and materials in performing all operations necessary for the complete replacement of the existing Booth Road Bridge superstructure with all associated appurtenances over Stoney Brook in the City of Kirtland, Ohio. The Contractor shall provide the design and construction of the work to be performed. Proposed construction shall not begin before Monday, April 1, 2024. All work under this contract shall be completed by Friday, August 30, 2024.
04/19/2023 03:00 PM UTC
Cheryl Drive Reconstruction; Concord Township, Ohio; LCE Project No. 2023-009; Prepared by James R. Gills, PE, PS, Lake County Engineer
Pavement and base removal, drainage base, non-reinforced concrete surface and related items. All work under this contract shall be completed by Friday, August 11, 2023.
04/11/2023 02:00 PM UTC
SR 2 - Mowing - 2023; Cuyahoga County Line to Grand River Bridge; LCE Project No. 2023-006; Prepared by: James R. Gills, PE, PS, Lake County Engineer
Mowing and trimming various areas along SR 2 from Cuyahoga County line to Grand River Bridge. All work under this contract shall be completed by Saturday, November 18, 2023.
03/29/2023 03:00 PM UTC
21 - 30 of 74 Solicitations
1 3 5 6 7 8