Number Deadline
Painesville Township Park Resurfacing Project, Painesville Township, Ohio, LCE Project No. 2026-009
The work covered by the plans and specifications includes pavement planing of 2", partial depth repairs, 2" asphalt concrete, intermediate course and a single chip seal with fog seal for surface and related items.
04/07/2026 02:00 PM UTC
Lake County Resurfacing Project-2026, Lake County, Concord Township, Leroy Township & Painesville Township LCE Project No. 2025-020
The work covered by the plans and specifications included: Pavement planing, partial and full depth pavement repairs, intermediate course, asphalt surface course and related items.
04/08/2026 03:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
County Roads Pavement Markings - 2023; LCE Project No. 2023-007; Prepared by James R. Gills, PE, PS, Lake County Engineer
Application of centerlines, edge lines, and related work on various County roads. All work under this contract shall be completed by September 1, 2023.
03/29/2023 03:00 PM UTC
LAK-Prouty Road (CR 414) Resurfacing Project; Concord Township, Ohio; Federal Aid Project No. FAN E220(308); LPA Project - PID No. 115910; LCE Project No. 2021-016; DBE Goal 7%; Prepared by: James R. Gills, PE, PS, Lake County Engineer
Pavement planing, placement of a scratch course, fabric, asphalt intermediate course, asphalt surface course, guardrail, storm sewer and related items. All work under this contract shall be completed by September 29, 2023.
03/15/2023 03:00 PM UTC
Drainage Improvements for Part of Shore Drive & Vicinity-RE-BID; Madison Township, Ohio; LCE Project No. 2021-003; Prepared by James R. Gills, PE, PS, Lake County Engineer
Storm sewer removal and installation, catch basin removal and installation, asphalt surface course, and related items. All work under this contract shall be completed by August 11, 2023.
02/21/2023 03:00 PM UTC
Bowhall Road Sidewalk Improvements; Painesville, Ohio; LCE Project No. 2022-016; Prepared by James R. Gills, PE, PS, Lake County Engineer
Excavation, aggregate base, sidewalk and curb ramp installation, apron/driveway replacement, re-location of fire hydrants and mailboxes, as well as utility structure adjustments. All work under this contract shall be completed by July 14, 2023.
02/21/2023 03:00 PM UTC
Reconstruction of Bannerstone, Sandstone, Foxfire, Pine Meadow and Wonderlust; Painesville Township, Ohio; OPWC No. CG38Z; LCE Project No. 2023-003; Prepared by: James R. Gills, PE, PS, Lake County Engineer
Excavation, base course, asphalt concrete, non-reinforced Portland Cement concrete pavement, concrete curb gutter, and related items. All work under this contract shall be completed by August 11, 2023.
02/21/2023 03:00 PM UTC
Lake County Resurfacing Project - 2023; City of Painesville, Lake County Fairgrounds, Concord Township & Painesville Township, Ohio; LCE Project No. 2022-019; Prepared By: James R. Gills, PE, PS, Lake County Engineer
The work covered by the plans and specifications includes: Pavement planing, fabric, asphalt intermediate course, asphalt surface course, and related items. All partial depth repair work for Balch Road, Haines Road, and Ross Road shall be completed by June 2, 2023. All work for the Lake County Fairgrounds area shall be completed by June 30, 2023. All work under this contract shall be completed by August 4, 2023.
02/15/2023 04:00 PM UTC
LAK-Sanctuary Drive Bridge; Village of Kirtland Hills, Ohio; PID No. 113455; LCE Project No. 2015-017-02; EDGE GOAL 5%
Superstructure Replacement with substructure repairs of the Sanctuary Drive Bridge over the East Branch of the Chagrin River. The existing two spans of single span prestressed non-composite box beams will be replaced with a two span continuous steel beam bridge, composite reinforced concrete deck and semi-integral abutments on the existing substructure units. Storm sewer updates and new guardrail is also included. Traffic is to be maintained via a detour route. All work under this contract shall be completed by Friday, October 27, 2023.
12/14/2022 04:00 PM UTC
Drainage Improvements for Part of Shore Drive & Vicinity; Madison Township, Ohio; LCE Project No. 2021-003
Storm sewer removal and installation, catch basin removal and installation, asphalt surface course, and related items.
11/29/2022 03:00 PM UTC
Callow Road Bridge Replacement - Re-Bid; Leroy Township; OPWC No. CU00Y; LCE Project No. 2021-007
All plant fabrication, labor, equipment, supplies and materials in performing all operations necessary for the complete replacement of the existing 18 foot span concrete slab bridge on Callow Road over East Creek in Leroy Township with a 40 foot single span steel beam bridge with all proposed appurtenances. All work under this contract shall be completed by Thursday, June 29, 2023.
06/29/2022 03:00 PM UTC
Callow Road Bridge Replacement; Leroy Township; OPWC No. CU00Y; LCE Project No. 2021-007
All plant fabrication, labor, equipment, supplies and materials in performing all operations necessary for the complete replacement of the existing 18 foot span concrete slab bridge on Callow Road over East Creek in Leroy Township with a 40 foot single span steel beam bridge with all proposed appurtenances. All work under this contract shall be completed by Friday, May 26, 2023.
05/18/2022 03:00 PM UTC