Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3659-C1A
Damon Pond Dam Repairs and Area Improvements Willard Brook State Forest, Ashby, Ma The project consists of work to bring Damon Pond Dam into compliance with the Massachusetts Dam Safety Regulations (302 CMR 10.00) and making state park site improvements. Proposed work includes concrete and masonry repairs to the dam, spillway, and training walls, removal of unsuitable vegetation on and within 20 feet of the dam, site drainage improvements, overtopping protection to the dam embankment and structural repairs to the bridge deck and railings. The project also includes construction of recreational features including two ADA- compliant parking spaces and an ADA/MAAB-compliant stabilized aggregate path from Hosmer Road to the boundary of the southern beach. The estimated project cost is $2,130,971.00 The work is to be accomplished within 365 calendar days of a notice to proceed. Liquidated damages in the amount of $750 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Dam Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Bidders shall also have a minimum of 10 years of experience and shall have successfully completed at least five dam rehabilitation or repair construction projects within the last 10 years including at least two projects in excess of one million dollars. Submit a summary of experience and representative projects with references to show compliance with the requirements listed above. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
07/23/2026 04:00 PM UTC
W26-7610-C02
Fabric Storage Structures Counties : Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The project consists of purchase and statewide installation of up to 5 (five) structures suitable for storage of road salt, other materials and equipment installed at DCR facilities statewide. Sheds should be in three general sizes and quantities. Large – sizes as specified in specifications Medium (DCR Standard Size) – 32' x 30' Small – 22' x 30' The estimated project value is: $400,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $ 1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/23/2026 04:00 PM UTC
P26-3636-C6A
Project Shade: Lake Wyola State Park 94 Lakeview Road, Shutesbury, MA 01072 The project consists of the installation of tree protection, construction fence, and erosion control; installation of (3) small shade pavilions at south end of the site and installation of (1) medium pavilion at the north end of the site; installation of accessible paths, boardwalks, accessible parking improvements, picnic tables, grills and wood post and rail fencing; procurement, installation and maintenance of trees and shrubs, and seeding and establishment of lawn and meadow areas. See documents for list of Owner-supplied wood. The estimated project cost is $891,000.00. The work is to be accomplished within 273 calendar days of notice to proceed. Liquidated damages in the amount of 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/30/2026 04:00 PM UTC
P26-3665-M6A
Bridge Maintenance and Repairs - Statewide The project consists of undertaking scheduled and emergency bridge repairs to bridges- statewide. The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of _500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Bridge Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/30/2026 04:00 PM UTC
P26-3663-C1A
New Bedford State Pier North Wharf Reconstruction The project consists selective demolition, over sheeting of the pier bulkhead, construction of new pile supported structures, float System improvements (gravity sewer line, power pedestals, lighting), grounds improvements (sink hole repair and ramp construction), installation of new gangway to the MEP floats, fence and gating improvements, repair of select Ro-Ro access structure piles, and concrete replacement to select areas of the North Wharf. The estimated project cost is $ 31,593,295.41 The work is to be accomplished within 395 calendar days of a notice to proceed. Liquidated damages in the amount of $1,200 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in MARINE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
08/20/2026 04:00 PM UTC
P26-3670-C1A
Drainage – Repair & Replacement The project consists of both emergency & scheduled repairs and/or adjustment of rebuilding of drainage structures to proper grade, as well as the emergency & scheduled repair and/or replacement, and installation of new & existing statewide DCR drainage infrastructure The estimated project cost is $10,500,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in DRAINAGE to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
08/20/2026 04:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
P22-3442-M6A
Carpentry Maintenance and Repair in DCR Facilities – Central & Western, MA Carpentry Maintenance and Repairs at DCR Facilities in Central and Western Massachusetts. Repairs may include accessibility improvements, deck repairs, siding replacement, gutter & downspout replacement, doors and window replacement. This is a work order contract for building sites not identified at this time and will include work on historic structures. Work on historic structures shall comply with appropriate architectural preservation standards. This is a work order contract and does not have specific projects sites identified at this time. The estimated project cost is $ 2,800,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for General Building Construction & Historic Structure Renovation and must submit with the bid an update of their respective qualifications.
05/18/2022 04:00 PM UTC
P22-3478-C2A
Building Demolition (Asset Mitigation Initiative) Belchertown, Boston, Egremont, Georgetown, Mount Washington, Princeton This project entails demolition of thirteen high priority structures found at six different locations . All structures within this contract have been deemed high priority due to safety hazards from the statewide Asset Mitigation Initiative. See Part V for listed buildings. The estimated project Base Bid cost is $ 600,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications Generals must be certified in Demolition and must submit with the bid an update of their respective qualifications.
05/11/2022 04:00 PM UTC
P22-3442-M5A
Carpentry Maintenance and Repair in DCR Facilities – Eastern Massachusetts Bristol, Barnstable, Middlesex, Essex, Norfolk, Plymouth, Suffolk, Worcester A pre-bidding conference for prospective bidders will be held via MS-TEAMS at 10:00AM April 20, 2022 at the following link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjljNWNkOTAtZDc3OS00ZjFiLWI5N2ItZGQ0ZWQxNzk3NGQx%40thread.v2/0?context=%7b%22Tid%22%3a%223e861d16-48b7-4a0e-9806-8c04d81b7b2a%22%2c%22Oid%22%3a%223718f684-c36e-4532-8814-425d96b655c7%22%7d and call-in #: +1 857-327-9245; 979714924# The project consists of: Carpentry Maintenance and Repairs at DCR Facilities in Eastern Massachusetts. Repairs may include accessibility improvements, deck repairs, siding replacement, gutter & downspout replacement, doors, and window replacement. This is a work order contract for building sites not identified at this time and will include work on historic structures. Work on historic structures shall comply with appropriate architectural preservation standards. This is a work order contract and does not have specific projects sites identified at this time. The estimated project Base Bid cost is $ 3,500,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for General Building Construction & Historic Structure Renovation and must submit with the bid an update of their respective qualifications.
05/11/2022 04:00 PM UTC
P20-3340-C2A Re-Bid
RE-BID Maudslay Garden Wall – Phase 2 Maudslay State Park, Newburyport, MA The project consists of the repointing of the brick enclosure walls at the Italian and Rose Gardens, with some limited reconstruction in selected areas, and some landscaping work in areas adjacent to the walls. The estimated project cost is $330,000.00 A pre-bidding conference for prospective bidders will be held on Tuesday, April 12, 2022, at 8 AM at the project site. The work is to be accomplished within 120 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in " Recreational Facilities" to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
04/27/2022 04:00 PM UTC
P18-3198-C1A
Marsh Post Trail Connection 5 Greenough Boulevard, Cambridge, MA 02138 The project consists of improvements to the site access and parking area and improve accessibility and circulation of bicycle, pedestrian, and vehicle traffic. Additionally, trees will be removed and replaced, a new stormwater management infiltration basin will be installed, and the entire grass area will be renovated with new soil and seeding. The estimated project cost is $1,300,000 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - BIKE PATHS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
04/13/2022 04:00 PM UTC
P22-3461-M3A
Installation of Reflectorized Pavement Markings on Parkways and Roadways of DCR – Statewide: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, and Worcester Counties The project consists of installation of pavement markings on Parkways, Roadways and Parking Lots of the Department of Conservation and Recreation. This operation will call for two (2) or more truck mounted striping units of painting a minimum of twelve miles of pavement making (paint of thermoplastic) a day. The estimated project cost is $1,600,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
04/11/2022 04:00 PM UTC
P22-3463-M1A
Landscape Maintenance and Improvements – Eastern Region Middlesex, Essex, Norfolk, Bristol, Plymouth, Barnstable, Worcester Counties This project consists of regular landscape maintenance, plants, tree installation, seeding, natural turf/ lawn installation and care. Invasive species removal, tree work, grading and general seasonal landscape DCR parks clean up. Specialized maintenance requirements include filling turf low spots, aeration, topdressing, seeding fertilizing and pruning in areas indicated on documents provided DCR. The estimated project cost is $3,000,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in LANDSCAPING INCLUDING TREE PLANTING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
03/30/2022 04:00 PM UTC
P22-3440-M2A
Hard Courts Maintenance Locations: Essex, Middlesex, Suffolk, Norfolk,Worcester, Plymouth, Bristol,Barnstable The project consists of repair and maintenance of DCR Hard Courts: including milling resurfacing, excavation, subbase, and resurfacing, striping. Hard courts equipment: posts, nets, baskets, backboards, fences, concrete walls; earthwork, site drainage, concrete pavement, site landscape restoration, and other work related to hard courts facilities. The estimated project cost is $ 2,000,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
03/23/2022 04:00 PM UTC
P20-3349-C1A
Purgatory Chasm Entrance & Trail Improvement Construction Phase I Sutton, MA The project consists of reconfiguring the entrance to Purgatory Chasm and work will be focused on the west side of Purgatory Road for this Phase of work. Parking along Purgatory Road will be altered, HMA paving, grading, soil and vegetative restoration areas, wood guardrail, drinking fountain, and tree plantings. Other work includes stabilized aggregate paving, site furnishings, two boardwalks with railings and overlooks, foot bridges, signage, lawn, drainage swales and ditches, and planting of native vegetation. These improvements will provide improved accessibility in compliance with the Americans with Disabilities Act (ADA). The estimated project cost is $ 990,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway – Bike Paths to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
03/16/2022 04:00 PM UTC
P20-3340-C2A
Maudslay Garden Wall – Phase 2 Newburyport, MA The project consists of the repointing of the brick enclosure walls at the Italian and Rose Gardens, with some limited reconstruction in selected areas, and some landscaping work in areas adjacent to the walls. The estimated project cost is $330,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities or Landscaping Including Tree Planting to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
03/16/2022 04:00 PM UTC
211 - 220 of 322 Solicitations