General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Project # P24-3439-C8A Wompatuck State Park Bathrooms- will be available Wednesday August 6th 2025 - Sorry for the inconvenience.  



Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P25-3586-C11A
Landry Park Site Improvements Landry Way, Waltham, MA This project consists of a reconstruction of an existing park including removal of existing pathways, trees, lawn, topsoil, lighting; invasive species management, and tree pruning; construction of new concrete, porous asphalt surfacing, granite paving and permeable pavers; installation of new curbing, and accessible ramps, railing; installation of new site furnishings including bike racks, game tables, signage, drinking fountain and lighting; installation of an irrigation system, bioretention basin, planting, reinforced lawn, sodding and seeding. The estimated project cost is $1,100,000.00 The work is to be accomplished within 103 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreation Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
08/07/2025 04:00 PM UTC
P24-3567-C1A
General: Southwest Corridor Park Headquarters Boston, MA This project consists of considerable building envelope upgrades including the replacement or repair of underlying structure noted in the project set. The envelope upgrades of this 10,805 SF building consist of a new roof assembly and exterior continuous insulation with a thermally modified wood rainscreen assembly. New windows, doors, and insulated overhead doors included in the envelope upgrades. Interior modifications segregating active shop space from office space. There are also several upgrades to the building mechanical and electrical systems including a roof mounted photovoltaic array. Additionally, an accessible parking area and entry are included in site work. The estimated project: $4,688,544.00 The work is to be accomplished within 550 calendar days of a notice to proceed. Liquidated damages in the amount of $2,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firm to meet the combined requirement, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
08/14/2025 04:00 PM UTC
P25-3593-M6A
Recreational Fields Maintenance Essex, Middlesex, Suffolk, Norfolk, Worcester, Plymouth, Bristol Barnstable. The project consists of: The two – year Recreational Fields Maintenance Contract assists DCR Operations with ongoing restorative recreational field maintenance on natural turf fields and infields, (2) synthetic turf multi-use fields, (2) golf courses, with opening day spring preparation, and larger renovation projects aligned with universal access goals and comprehensive site improvements. The estimated project cost is $2,400,000 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
08/14/2025 04:00 PM UTC
P25-3593-C2A
Salt Storage Containers Counties: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The project consists of: Purchase and statewide installation of 12 (six) containers/structures suitable for storage of road salt, other materials and equipment installed at DCR facilities statewide. Sheds should be in three general sizes and quantities. 3 - Large – sizes as specified in specifications 5 - Medium (DCR Standard Size) – 32’ x 30’ 4 - Small – 22’ x 30 The estimated project value is $1,200,000. The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $ 1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
08/21/2025 04:00 PM UTC
P25-3504-M4A
West & Central Paving Location: Berkshire, Franklin, Hampshire, Hampden, Middlesex, and Worcester Counties The project primarily consists of road and trail improvements and rehabilitation. The contract contains price adjustments for hot mix asphalt mixtures. The bid price provided for hot mix asphalt mixtures shall be based on the cost of asphalt cement of $635.00/liquid ton as set by MASSDOT (New method) for the month of June 2025. The estimated project cost is $ 9,000,000.00 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle. Commissioner Massachusetts Department of Conservation and Recreation
09/04/2025 04:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
P22-3461-C1A
Installation of Fencing/Guard Rail/Closure Gates/Impact Attenuators in 12 Mainland Counties in Massachusetts Essex, Middlesex, Norfolk, Suffolk, Plymouth, Bristol, Barnstable, Worcester, Hampden, Hampshire, Franklin & Berkshire Counties The project consists of installation of new and maintenance of existing fencing, guardrail, gates, and impact attenuators throughout the DCR. The estimated project cost is $ 6,000,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Guardrail & Fencing to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/23/2022 05:00 PM UTC
P22-3455-C2A
Pine Tree Brook Reservoir Dam Decommissioning and Stream Restoration - Milton, MA Labor, equipment, and materials necessary to remove portions of Pine Tree Brook Dam . Restore unimpeded flow to a stable, natural stream channel. A pre-bidding conference for prospective bidders will be held at the Site on Wednesday, February 16, 2022, at 11:00 AM. The Site is located near the southwest corner of Unquity Road and Canton Ave (near 851 Canton Ave), adjacent to the Max Ulin Memorial Public Skating Rink. The meeting will begin n the Rink parking lot and then proceed by foot to the Site. The estimated project cost is $ 75,000 The work is to be accomplished within 30 calendar days of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division Dam Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/23/2022 05:00 PM UTC
P15 2928 C1A
Sub-BIDS:Shannon Beach Restroom Facilities Mystic Lake State Park, Winchester MA SUB-BIDS: Misc. And Ornamental Iron, Roof and Flashing, Tile, Plumbing, and Electrical The project consists of: Project consist of Construction and Site Development to provide a new Rest Room facility for Shannon Beach. The facility will provide toilets, lavatories, outdoor rinse stations. Site development will provide accessibility to the beach and all portions of the project. The project also includes landscaping paving, ramps, shrubs, and trees. Alternate #1 is a small storage building. The cost estimate for this base project is $2,050,694.00. The cost estimate for add alternate 1 is $130,010.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications Generals must be certified in General Building Construction and must submit with the bid an update of their respective qualifications.
02/17/2022 05:00 PM UTC
P15-2984-C2A
Amelia Earhart Dam Facility Hardening Upgrade Somerville, Massachusetts The project consists of facilities hardening and flood protection to elevation 122 (MDC) including replacing hatches, doors, manhole covers, limit switches, sump pumps and related piping, repair construction/expansion joints and concrete spall, replacement of building storefront, seal electrical conduits, and two new standby generators. The estimated project cost is $4,900,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Pump Station to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/16/2022 05:00 PM UTC
P22-3453 C1A
DCR Middlesex Fell Reservation Limited Demolition 164 Pond Street, Stoneham, MA Demolishing three structures and above-ground gas tank facility located on the Middlesex Fells Reservation and remove all debris. Abate asbestos in each building as required and grade the site as shown on the site plan. Relocate all items designated on the contract documents to be relocated to a temporary storage facility located adjacent to the work area. The existing slabs and foundations shall not be removed as part of this contract. The estimated project Base Bid cost is $275,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Demolition and must submit with the bid an update of their respective qualifications
02/09/2022 05:00 PM UTC
P22-3462-C1A
Sidewalk Improvements on Fellsway Fellsway, Medford, MA The project consists of repairs to driveways, sidewalks, traffic islands, as well as various other items listed herein to be completed within 180 days. The estimated project cost is $ 4,100,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY – SIDEWALK AND CURBING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/09/2022 05:00 PM UTC
P22-3457-M1A
Annual Maintenance and Service to HVAC and Plumbing Systems at Various Flood Control/Navigational Facilities Location: Boston, Somerville, Everett, Revere, Dedham, Newton. The project consists of: Providing annual maintenance and service of Industrial Heating Ventilation and air Conditioning (HVAC) and plumbing systems at Various Flood Control /Navigational Facilities. The estimated project Base Bid cost is $ 240,000.00 A Mandatory pre-bid meeting for prospective bidders will be held on January 19, 2022, at 1:00 PM at New Charles River Dam, 250 Warren Avenue Charlestown MA 02129 All General Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in Both HVAC & PLUMBING which they are bidding on and must submit with the bid an update of their respective qualifications. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
02/02/2022 05:00 PM UTC
P22-3461-M2A
Servicing Electrical & Electronic Systems - Statewide Location: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The scope of this work includes maintenance repair, removal and new installation of electrical and electronic systems at various DCR sport facilities, recreational areas, properties and buildings. The estimated project Base Bid cost is $ 1,400.000.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Electrical and must submit with the bid an update of their respective qualifications.
01/26/2022 05:00 PM UTC
P22-3440-M1A
NATURAL TURF FIELD MAINTENANCE Kelly Field, 25 Turtle Pond Parkway, Boston, MA & Foss Park, 49 Fellsway West, Somerville, MA The project consists of restorative maintenance on natural turf athletic fields at Foss Park and Kelley Field. Maintenance activities include filling low spots, aeration, topdressing, seeding and fertilizing in areas indicated on the Drawings. The estimated project cost is $200,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in LANDSCAPING INCLUDING TREE PLANTING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/26/2022 05:00 PM UTC
P22-3442-C1A
MAGAZINE BEACH BATHHOUSE ENTRANCE 719 Memorial Drive, Cambridge, MA Sitework to remove existing vegetation , demolish existing concrete ramp at the front of the bathhouse. Construct a new concrete landing , ADA compliant asphalt pathway at front entrance. Plantings,site furnishings,benches & bike racks. The estimated project cost is $ 285,000 Bidders must be pre-qualified by ( MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/19/2022 05:00 PM UTC
181 - 190 of 280 Solicitations
1 2 15 16 17 19 21 22 23 27 28