General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Project # P24-3439-C8A Wompatuck State Park Bathrooms- will be available Wednesday August 6th 2025 - Sorry for the inconvenience.  



Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P25-3586-C11A
Landry Park Site Improvements Landry Way, Waltham, MA This project consists of a reconstruction of an existing park including removal of existing pathways, trees, lawn, topsoil, lighting; invasive species management, and tree pruning; construction of new concrete, porous asphalt surfacing, granite paving and permeable pavers; installation of new curbing, and accessible ramps, railing; installation of new site furnishings including bike racks, game tables, signage, drinking fountain and lighting; installation of an irrigation system, bioretention basin, planting, reinforced lawn, sodding and seeding. The estimated project cost is $1,100,000.00 The work is to be accomplished within 103 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreation Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
08/07/2025 04:00 PM UTC
P24-3567-C1A
General: Southwest Corridor Park Headquarters Boston, MA This project consists of considerable building envelope upgrades including the replacement or repair of underlying structure noted in the project set. The envelope upgrades of this 10,805 SF building consist of a new roof assembly and exterior continuous insulation with a thermally modified wood rainscreen assembly. New windows, doors, and insulated overhead doors included in the envelope upgrades. Interior modifications segregating active shop space from office space. There are also several upgrades to the building mechanical and electrical systems including a roof mounted photovoltaic array. Additionally, an accessible parking area and entry are included in site work. The estimated project: $4,688,544.00 The work is to be accomplished within 550 calendar days of a notice to proceed. Liquidated damages in the amount of $2,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firm to meet the combined requirement, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
08/14/2025 04:00 PM UTC
P25-3593-M6A
Recreational Fields Maintenance Essex, Middlesex, Suffolk, Norfolk, Worcester, Plymouth, Bristol Barnstable. The project consists of: The two – year Recreational Fields Maintenance Contract assists DCR Operations with ongoing restorative recreational field maintenance on natural turf fields and infields, (2) synthetic turf multi-use fields, (2) golf courses, with opening day spring preparation, and larger renovation projects aligned with universal access goals and comprehensive site improvements. The estimated project cost is $2,400,000 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
08/14/2025 04:00 PM UTC
P25-3593-C2A
Salt Storage Containers Counties: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The project consists of: Purchase and statewide installation of 12 (six) containers/structures suitable for storage of road salt, other materials and equipment installed at DCR facilities statewide. Sheds should be in three general sizes and quantities. 3 - Large – sizes as specified in specifications 5 - Medium (DCR Standard Size) – 32’ x 30’ 4 - Small – 22’ x 30 The estimated project value is $1,200,000. The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $ 1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
08/21/2025 04:00 PM UTC
P25-3504-M4A
West & Central Paving Location: Berkshire, Franklin, Hampshire, Hampden, Middlesex, and Worcester Counties The project primarily consists of road and trail improvements and rehabilitation. The contract contains price adjustments for hot mix asphalt mixtures. The bid price provided for hot mix asphalt mixtures shall be based on the cost of asphalt cement of $635.00/liquid ton as set by MASSDOT (New method) for the month of June 2025. The estimated project cost is $ 9,000,000.00 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle. Commissioner Massachusetts Department of Conservation and Recreation
09/04/2025 04:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
P24-3551-M1A
Installation of Reflectorized Pavement Markings This project consists of furnishing the labor, materials, transportation, traffic controls, and equipment necessary for the installation of reflectorized pavement markings and other relevant work throughout DCR properties. This operation will call for two (2) or more truck mounted striping units of painting a minimum of twelve miles of pavement markings (paint of thermoplastic) a day. The estimated project cost is $ 1,500,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in PAVEMENT MARKINGS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
04/18/2024 04:00 PM UTC
P24-3543-C1A
Georges Island Pavilion Boston Harbor Islands Work consists of site preparation, new slab and footings, transportation of materials, construction of new pavilion and connections to existing pathways at Georges Island (within Boston Harbor Islands State Park). The contract also includes removal of closed clivus trailhead units (3) and the installation of new remote bathroom to support pavilion use. The pavilion materials will be provided by DCR. The estimated project: $425,000 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) General Construction or Modular Construction and must submit with the bid an update of their respective qualifications. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
04/11/2024 04:00 PM UTC
P22-3478-C3A
Sub-BID : Masonry, Waterproofing, Damp-proofing, and Caulking, Metal Windows, Painting Quabbin Administration Building Window Abatement and Replacement This project consists of the removal of asbestos and lead based paint containing materials at window frames and openings, installation of new thermally broken aluminum windows, and masonry repairs to deteriorated lintels and brick masonry within the limits of the window openings and as indicated in the drawings. The estimated project construction cost is $: 1,732,753.00 The work is to be accomplished within 245 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders Subs and Generals for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). General bidders must be certified in Historical Building Restoration. All must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
04/11/2024 04:00 PM UTC
P24-3556-C7A
DCR Rink Roofs and Solar Project This project consists of installing photovoltaic panels on one recreational facility roof and two rink roofs. The systems include the panels, raceways, conductors, invertors, and connection to the existing buildings electrical equipment. A new roof is included at the Bajko Rink that must be installed prior to installation of the solar panels. Work shall include providing DCR with all assistance necessary in registering the roof photovoltaic systems with the required State Agencies and Utilities to bring the systems online and make fully functional. The estimated project: $3,600,000 Alternate 1 Installation of additional solar panels at the Bajko Rink to cover the roof in its entirety is available as an Alternate as part of the Bid. The Estimate amount for the Alternate is $750,000. It is at the discretion of DCR to exercise the Alternate as part of the work. The work is to be accomplished within 1,095 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Roofing Category and must submit with the bid an update of their respective qualifications. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/28/2024 04:00 PM UTC
P24-3552-M4A
Servicing Traffic Signals and Control Systems Counties: Bristol, Berkshire, Barnstable, Middlesex, Essex, Franklin, Hampden, Hampshire Norfolk, Dukes, Plymouth, Suffolk, Worcester, and Nantucket This project consists of providing service to maintain traffic signal and control systems (DCR Statewide) in good working order, including scheduled preventive maintenance, emergency repairs and modifications. Subject to appropriations for expenditures as noted in Part IV, Notice of Special Conditions of the Contract (Paragraph A & B). The estimated project cost is $2,400,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Traffic Signals to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/28/2024 04:00 PM UTC
P17-3103-C1A
Sub Bids: Masonry Work, Roofing & Flashing, and Painting: Upper Lock Building Renovations This project consists of the replacement of existing roof, including but not limited to a new slate roof, new roof trim and flashing, new soffits, new gutters and down spouts, repair / restoration of original wood eave brackets, and repair of existing steal roof structure. Exterior work also included repointing of existing brick and granite walls 100%, and various repairs as indicated in the drawings. The estimated project Base Bid cost is $1,350,000 . The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $2,000. per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on. The General Bidder shall have DCAMM certification in the category of Historic Building Restoration and all must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
03/28/2024 04:00 PM UTC
P22-3452-C1A
Trail Crossing Phase 1 Ashland State Park, Clarksburg State Park, Wendell State Forest Counties : Berkshire, Franklin, Middlesex. This project consists of the installation of three new trail crossing structures within Massachusetts Department of Conservation and Recreation (DCR) State Park lands. All work is located within three Massachusetts counties; Berkshire, Franklin, and Middlesex and two DCR regional work areas; Western and Central regions. The project locations are in Ashland State Park, Clarksburg State Park, and Wendell State Forest. The project located in Clarksburg State Park is the top priority for the agency. Work at this location must be completed first. The estimated project cost is $940,972.39 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in BRIDGE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
03/21/2024 04:00 PM UTC
P24-3569-C1A
Mass Central Rail Trail Waltham-Weston, Phase 1 Waltham, MA and Weston, MA This project consists of the rehabilitation of an existing railroad truss bridge over the MBTA Fitchburg Commuter Rail tracks and the construction of a shared use path to Jones Road in Waltham. The estimated project cost is $ 2,548,251.30. The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway-Bike Paths to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/14/2024 04:00 PM UTC
P24-3552-C2A
Reconstruction of lighting along Soldiers Field Road - Phase 2 Location: Eliot Bridge Interchange Area to Western Ave Bridge at Egress & Exit Ramps, Boston, MA The project consists of the replacement of existing lighting with new system comprising of 1907 "Style Historic" poles and energy efficient LED pendant type luminaries including new underground system: conduit, wire, hand holes Load Center Cabinets and electric service upgrade as well as any other lighting apparatus necessary for the project. The estimated project cost is $ 4,490,000.00 The work is to be accomplished within 548 calendar days of a notice to proceed. Liquidated damages in the amount of $2,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway Lighting to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
03/14/2024 04:00 PM UTC
P24-3568-C1A
Charles River Reservation, Riverwalk Park Waltham, MA This project consists of the reconstruction of a segment of the Charles River Greenway between Moody Street and Prospect Street in Waltham. In addition to reconstruction of the shared use path, the project includes invasive removal, stormwater infrastructure, riverbank stabilization, bench restoration, and landscaping. The estimated project cost is $ 1,495,574. The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway-Bike Paths to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/07/2024 05:00 PM UTC
81 - 90 of 280 Solicitations
1 2 5 6 7 9 11 12 13 27 28