2026 Storm Sewer Lining
The work included in this project generally includes the televising, cleaning and lining of a 48” x 60” galvanized elliptical storm sewer with a UV Cured in place GRFP Liner, geopolymer spray applied pipe liner, or alternate trenchless lining solution. All proposed work shall meet all City, EPA requirements and ordinances of which the Contractor shall become familiar with. All storm service connections shall be located and properly maintained. This linear work shall start at the downstream end and work in the upstream direction. The trunk sewer begins at the main Gleneagles Golf Course Pond, down Hawkins to the rear yards and turns toward Glenwood Drive. This final section being lined begins at the intersection on Timothy/Hawkins junction chamber and heads east down Hawkins into the rear yards turning south and under Glenwood Drive, terminating at the manhole in the tree lawn. It is anticipated the upstream pond will require dewatering to a level that allows work to proceed. A siphon system for dewatering the main pond at the outlet on Timothy Lane is recommended, as it can provide the lowering over night with no noise related to a generator. Residential traffic must be maintained as this developments only ingress/egress is via Timothy Lane.
| 04/23/2026 01:00 PM UTC |
| Number | Deadline |
|---|---|
|
2026 Fitness Center Pool Lining Contract
The work for this project generally includes removal of existing pool aggregate finish and lap lane tile to a depth of approximately 3/8” and resurfacing with exposed quartz aggregate finish. Repairs to hollow/delaminated areas and cracks should be included in the bid. Contractor shall visit the site to view existing conditions and base their bid accordingly.
| 03/19/2026 01:00 PM UTC |
|
SUM - Liberty Road Trail Improvements (PID 124311)
The work for this project generally includes installation of a rubberized porous pavement trail, concrete curb, and storm sewer improvements along Liberty Road. Contractor shall visit the site to view existing conditions and base their bid accordingly.
Only ODOT pre-qualified contractors are eligible to submit bids for this project. Pre-qualification status must be in force at the time of bid, at the time of award, and through the life of the construction contract.
“Small Business (SBE) Requirement. SBE participation goals (Subcontracts, Materials, supplies) have been set on this project for those certified as SBE’s in accordance with the TEA -21 (1998) and
49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio revised Code (O.R.C.)”. The SBE Goal for this project is 7%.
| 03/19/2026 01:00 PM UTC |
|
2026 Roadway Striping Project
This project consists of re-painting existing traffic lane lines, stop bars, cross walks, lane arrows, and other pavement markings throughout the City, with certain restrictions as denoted herein. The roadway restriping project will begin June 1 and be completed by
July 30. The City has the right to award this project to the lowest, competent and most responsible bidder.
| 03/05/2026 02:00 PM UTC |
|
SUM - Glenwood Drive Resurfacing (PID 116505)
The work for this project generally includes asphalt resurfacing, asphalt repairs, concrete curb removal & replacement, asphalt grinding, minor/major asphalt repairs, curb and sidewalk repairs, and miscellaneous other repairs. Contractor shall visit the site to view existing conditions and base their bid accordingly. Work items listed are approximate only and may not include all work required for that street.
Only ODOT pre-qualified contractors are eligible to submit bids for this project. Pre-qualification status must be in force at the time of bid, at the time of award, and through the life of the construction contract.
Small Business (SBE) Requirement. SBE participation goals (Subcontracts, Materials, supplies) have been set on this project for those certified as SBE’s in accordance with the TEA -21 (1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio revised Code (O.R.C.)”. The SBE Goal for this project is 7%.
| 02/26/2026 02:00 PM UTC |
|
2026 Road Improvemens Project
The work for this project generally includes asphalt resurfacing, asphalt repairs, concrete curb removal & replacement, asphalt grinding, minor/major asphalt repairs, curb and sidewalk repairs, catch basin repairs and miscellaneous other repairs. Contractor shall visit the various sites to view existing conditions and base their bid accordingly. Work items listed for work locations are approximate only and may not include all work required for that street.
| 02/05/2026 02:00 PM UTC |
|
Wastewater Treatment Plant Improvements (Note Mandatory Pre-Bid Meeting)
The work included in this project generally consists of general site work, Flow Equalization, Tertiary Treatment, and Disinfection improvements for the City of Twinsburg Wastewater Treatment Plant.
The project includes a new 130-foot-long by 64-foot-wide by 18-foot-deep 1-million-gallon flow equalization basin, which will provide a total storage capacity of 3 million gallons. Other improvements involve enhancing cleaning operations with the use of tipping buckets, replacing the existing mixing system and adding a mixing system to the new EQ tank, replacing the EQ pump station pumps and drain pumps, and updating the overflow totalizing flow meter, instrumentation and level control for operations.
New disc filter equipment will be installed to replace the existing microstrainers. The plan is to upgrade the existing facility with new equipment and perform necessary building improvements to meet code and streamline maintenance and operation of the filters in the future.
The project includes replacing the current chlorine gas disinfection system with vertical UV disinfection. The existing chlorine contact tank will be modified to install the new UV disinfection system and a new canopy structure will be installed over the chlorine contact tank. The chemical storage rooms will be modified to accommodate the new electrical equipment.
The project also includes miscellaneous site work items, new access stairs at the existing outfall, and a new generator.
A mandatory pre-bid meeting will be held at the Wastewater Treatment Plant on November 12, 2025 at 10:30 AM. The address for the Twinsburg Wastewater Treatment Plant is 10231 Ravenna Road, Twinsburg OH 44087.
| 12/11/2025 03:00 PM UTC |
|
Uniform & Floor Mat Rental Services 2026-2028 (RE-BID OPENING 12/4/25)
The service to be provided under this contract will consist of providing various types of work uniforms, including weekly laundering, repair, replacement, delivery as well as bi-weekly mat service to various departments of the City of Twinsburg.
| 12/04/2025 02:00 PM UTC |
|
Liberty Road Culvert Extensions
The work for this project generally includes installation of storm sewer culvert extensions along Liberty Road. Contractor shall visit the site to view existing conditions and base their bid accordingly.
| 11/25/2025 02:00 PM UTC |
|
2026 Waterford Pond Dredging Phase 1
The work for this project generally includes dredging the western portion of the Waterford Pond located on the Glen Eagles Golf Course in Twinsburg, OH. The dredging work is to include dewatering the western portion of the pond, conducting a survey of the existing contours, removing accumulated sediment to bottom of original pond, and resurveying the pond to determine volume removed. The City has a site approximately 0.25 miles from the pond where sediment can be stored and dewatered, but ultimately the material must be hauled away. Contractor shall visit the site to view existing conditions and base their bid accordingly.
| 11/20/2025 02:00 PM UTC |
|
Uniform & Floor Mat Rental Services (RE-BID)
The service to be provided under this contract will consist of providing various types of work uniforms, including weekly laundering, repair, replacement, delivery as well as bi-weekly mat service to various departments of the City of Twinsburg.
| 11/14/2025 02:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.