General Info

Business Logo

City of Twinsburg, OH

10075 Ravenna Road, Twinsburg, OH 44087
(330) 963-6233


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2026 Waterford Pond Dredging Phase 1
The work for this project generally includes dredging the western portion of the Waterford Pond located on the Glen Eagles Golf Course in Twinsburg, OH. The dredging work is to include dewatering the western portion of the pond, conducting a survey of the existing contours, removing accumulated sediment to bottom of original pond, and resurveying the pond to determine volume removed. The City has a site approximately 0.25 miles from the pond where sediment can be stored and dewatered, but ultimately the material must be hauled away. Contractor shall visit the site to view existing conditions and base their bid accordingly.
11/20/2025 02:00 PM UTC
Liberty Road Culvert Extensions
The work for this project generally includes installation of storm sewer culvert extensions along Liberty Road. Contractor shall visit the site to view existing conditions and base their bid accordingly.
11/20/2025 02:00 PM UTC
Wastewater Treatment Plant Improvements (Note Mandatory Pre-Bid Meeting)
The work included in this project generally consists of general site work, Flow Equalization, Tertiary Treatment, and Disinfection improvements for the City of Twinsburg Wastewater Treatment Plant. The project includes a new 130-foot-long by 64-foot-wide by 18-foot-deep 1-million-gallon flow equalization basin, which will provide a total storage capacity of 3 million gallons. Other improvements involve enhancing cleaning operations with the use of tipping buckets, replacing the existing mixing system and adding a mixing system to the new EQ tank, replacing the EQ pump station pumps and drain pumps, and updating the overflow totalizing flow meter, instrumentation and level control for operations. New disc filter equipment will be installed to replace the existing microstrainers. The plan is to upgrade the existing facility with new equipment and perform necessary building improvements to meet code and streamline maintenance and operation of the filters in the future. The project includes replacing the current chlorine gas disinfection system with vertical UV disinfection. The existing chlorine contact tank will be modified to install the new UV disinfection system and a new canopy structure will be installed over the chlorine contact tank. The chemical storage rooms will be modified to accommodate the new electrical equipment. The project also includes miscellaneous site work items, new access stairs at the existing outfall, and a new generator. A mandatory pre-bid meeting will be held at the Wastewater Treatment Plant on November 12, 2025 at 10:30 AM. The address for the Twinsburg Wastewater Treatment Plant is 10231 Ravenna Road, Twinsburg OH 44087.
12/11/2025 03:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
2024 Glenwood Drive Waterline (OPWC Funded)
The work included in this project generally includes installation of 12” ductile iron water main, line valves, new hydrant assemblies and water service connections on Glenwood Drive. All proposed work shall meet all City, EPA and CWD requirements and ordinances of which the Contractor must become familiar with. Various improvements shown on plans are approximate only which the contractor shall verify location and elevation before installing. Contractor shall use all available resources in protecting and supporting the existing storm sewer, water line and utility poles at all times, especially during excavation. Stationing and locations shown on the improvement plans are approximate. Most locations and items are called out by station and offset and are subject to adjustment in the field.
02/01/2024 02:00 PM UTC
Proposed Restroom Facility for Glen Chamberlin Park
Work on this project will commence on or before Feb 1, 2024 and be completed by March 29, 2024. The work included in this project includes all materials, equipment and manpower to complete the restroom facility described in this contract and indicated on plans prepared by Mayer Architectural Group, Inc. This contract is partially funded by ODNR grant C725E2.
12/14/2023 03:00 PM UTC
Bank Stabilization and Sanitary Sewer
The work for this project generally includes replacement of approximately 250 linear feet of 18” sanitary sewer parallel to Tinkers Creek, stream bank stabilization, rehabilitation of four manholes, and replacement of one manhole on SR 91. Contractor shall visit the site to view existing conditions and base their bid accordingly. Work items listed for work locations are approximate only and may need to be adjusted based on field conditions. All other requests for clarification of various contract specifications for this project should be submitted through E-Mail to pjeffers@twinsburg.oh.us no later than four business days prior to the bid opening to be reviewed and responded to.
12/14/2023 02:00 PM UTC
City of Twinsburg Parks Improvements - Grading, Culvert, ADA Path and Water Quality Pond
Work on this project will commence on or before Feb 1, 2024 and be completed by June 1, 2024. The work included in this project includes all equipment and manpower for both Part A and Part B of this contract. Part A is located in the City Glenn Chamberlin Park at 10260 Ravenna Road and is intended to provide ADA access to the amphitheater patrons and is partially funded by ODNR grant C725E2. Part A consists Demo of existing Timber Bridge, rerouting of existing timber walkway, 84 ft of 30” HDPE culvert and structures, placing fill material generated from PART B of this project, grading and paving of new ADA asphalt and concrete paths and modifying/removing existing asphalt paths, seeding and sodding as indicated on plans prepared by the City of Twinsburg Engineering Dept. Part B is located in the City Liberty Park active recreation at 9375 Liberty Road and is a modification of an existing pond to provide water quality and generate burrow for PART A. Part B consists of excavation, grading, drainage and storm sewer; fence, path restoration, seeding and mulch, to construct the water quality basin as shown on plans provided by Weber Engineering.
11/08/2023 03:00 PM UTC
Glenwood Drive Sanitary Sewer Manhole Rehabilitation
The work for this project generally includes application of a structural and corrosion resistant liner to ten sanitary sewer manholes along Glenwood Drive. Contractor shall visit the site to view existing conditions and base their bid accordingly.
11/08/2023 02:00 PM UTC
SUM - Cannon Road (PID 115356)
DBE GOAL 7%: Description of Job: Asphalt grinding involving re-profiling to obtain minimum cross slope, resurfacing, asphalt base repairs, storm basins being adjusted or replaced and replacement of pavement markings on Cannon Road. Project Location: Cannon Road from Liberty Road to Ravenna Road
02/23/2023 03:00 PM UTC
SUM - Ravenna Road (PID 112583)
DBE GOAL 7% Description of Job: Asphalt grinding involving re-profiling to obtain minimum cross slope, resurfacing, asphalt base repairs, storm basins being adjusted or replaced and replacement of pavement markings on Ravenna Road. Project Location: Ravenna Road between East Idlewood Drive and Glenwood Drive.
02/24/2022 03:00 PM UTC
21 - 27 of 27 Solicitations
1 3 Next →