City of Twinsburg, OH
10075 Ravenna Road, Twinsburg, OH 44087
(330) 963-6233
10075 Ravenna Road, Twinsburg, OH 44087
(330) 963-6233
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
2026 Storm Sewer Lining
The work included in this project generally includes the televising, cleaning and lining of a 48” x 60” galvanized elliptical storm sewer with a UV Cured in place GRFP Liner, geopolymer spray applied pipe liner, or alternate trenchless lining solution. All proposed work shall meet all City, EPA requirements and ordinances of which the Contractor shall become familiar with. All storm service connections shall be located and properly maintained. This linear work shall start at the downstream end and work in the upstream direction. The trunk sewer begins at the main Gleneagles Golf Course Pond, down Hawkins to the rear yards and turns toward Glenwood Drive. This final section being lined begins at the intersection on Timothy/Hawkins junction chamber and heads east down Hawkins into the rear yards turning south and under Glenwood Drive, terminating at the manhole in the tree lawn. It is anticipated the upstream pond will require dewatering to a level that allows work to proceed. A siphon system for dewatering the main pond at the outlet on Timothy Lane is recommended, as it can provide the lowering over night with no noise related to a generator. Residential traffic must be maintained as this developments only ingress/egress is via Timothy Lane.
| 04/23/2026 01:00 PM UTC |
| Number | Deadline |
|---|---|
|
Proposed Restroom Facility for Glen Chamberlin Park
Work on this project will commence on or before Feb 1, 2024 and be completed by March 29, 2024. The work included in this project includes all materials, equipment and manpower to complete the restroom facility described in this contract and indicated on plans prepared by Mayer Architectural Group, Inc. This contract is partially funded by ODNR grant C725E2.
| 12/14/2023 03:00 PM UTC |
|
Bank Stabilization and Sanitary Sewer
The work for this project generally includes replacement of approximately 250 linear feet of 18” sanitary sewer parallel to Tinkers Creek, stream bank stabilization, rehabilitation of four manholes, and replacement of one manhole on SR 91. Contractor shall visit the site to view existing conditions and base their bid accordingly. Work items listed for work locations are approximate only and may need to be adjusted based on field conditions. All other requests for clarification of various contract specifications for this project should be submitted through E-Mail to pjeffers@twinsburg.oh.us no later than four business days prior to the bid opening to be reviewed and responded to.
| 12/14/2023 02:00 PM UTC |
|
City of Twinsburg Parks Improvements - Grading, Culvert, ADA Path and Water Quality Pond
Work on this project will commence on or before Feb 1, 2024 and be completed by June 1, 2024. The work included in this project includes all equipment and manpower for both Part A and Part B of this contract.
Part A is located in the City Glenn Chamberlin Park at 10260 Ravenna Road and is intended to provide ADA access to the amphitheater patrons and is partially funded by ODNR grant C725E2. Part A consists Demo of existing Timber Bridge, rerouting of existing timber walkway, 84 ft of 30” HDPE culvert and structures, placing fill material generated from PART B of this project, grading and paving of new ADA asphalt and concrete paths and modifying/removing existing asphalt paths, seeding and sodding as indicated on plans prepared by the City of Twinsburg Engineering Dept.
Part B is located in the City Liberty Park active recreation at 9375 Liberty Road and is a modification of an existing pond to provide water quality and generate burrow for PART A. Part B consists of excavation, grading, drainage and storm sewer; fence, path restoration, seeding and mulch, to construct the water quality basin as shown on plans provided by Weber Engineering.
| 11/08/2023 03:00 PM UTC |
|
Glenwood Drive Sanitary Sewer Manhole Rehabilitation
The work for this project generally includes application of a structural and corrosion resistant liner to ten sanitary sewer manholes along Glenwood Drive. Contractor shall visit the site to view existing conditions and base their bid accordingly.
| 11/08/2023 02:00 PM UTC |
|
SUM - Cannon Road (PID 115356)
DBE GOAL 7%:
Description of Job: Asphalt grinding involving re-profiling to obtain minimum cross slope, resurfacing, asphalt base repairs, storm basins being adjusted or replaced and replacement of pavement markings on Cannon Road.
Project Location: Cannon Road from Liberty Road to Ravenna Road
| 02/23/2023 03:00 PM UTC |
|
SUM - Ravenna Road (PID 112583)
DBE GOAL 7%
Description of Job: Asphalt grinding involving re-profiling to obtain minimum cross slope, resurfacing, asphalt base repairs, storm basins being adjusted or replaced and replacement of pavement markings on Ravenna Road.
Project Location: Ravenna Road between East Idlewood Drive and Glenwood Drive.
| 02/24/2022 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.