General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
26-20-1
Lafitte St Drainage---------------------------------------The Parish requests a Contractor to improve drainage by removing and replacing the existing structure(s), subsurface drainage pipe, catch basin, sod, concrete driveways, and driveway aprons as specified along Lafitte St (R04D050) located in Mandeville, LA.
07/16/2026 07:00 PM UTC
26-19-1
Traffic Calming Program - Red Gap & Northern Homes------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to implement traffic calming solutions by way of asphaltic concrete speed tables, in addition to striping and respective speed table striping in on several residential streets in Red Gap & Northern Homes Subdivisions, Mandeville, La. This work, as specified in these documents and construction plans, is located along Soell Dr (R03L011), Hunt Dr (R03L012), Parker Dr (R03L014), Mire Dr (R03L016), 11th Ave (R03L013), Helenbirg Rd (R03L001), 6th Ave (R03L005), Lincoln St (R03L025), and North St (R03L026) Sections 11-14, Township 7S Range 11E.
07/16/2026 07:00 PM UTC
26-21-1
Lacombe Turning Radii Improvements___ The Parish requests a contractor to improve turning radii by installing drain pipes, catch basins, patching and shoulder materials as specified along Charlotte St (R07E044) Lacombe ; N. 25th St (R07E030) Lacombe ; Cloverland Dr (R07E040) Lacombe ; N. 8th St (R07E002) Lacombe, Louisiana.
07/16/2026 07:00 PM UTC
26-35-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
07/28/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
23-21-2
Safe Haven Water Utility Improvements----The work of this contract comprises the rehabilitation and upgrade to two existing water well facilities (PWS ID 1103039), including, but not limited to, demolition and replacement of the existing chemical buildings, new chemical feed skids, new electrical service and components, new control panels, and a new well pump and piping improvements at Well #1.
11/08/2023 08:00 PM UTC
23-41-1
Installation of Fuel Tanks and Removal of the Existing Fuel Tanks at Department of Public Works Facilities--------To supply all equipment, materials, and labor to place two (2) five thousand (5,000) gallon above ground fuel tanks at each location with all required equipment to supply diesel fuel and unleaded gasoline for governmental equipment usage. Requirements: •Submit all fire marshal paperwork for the scope of work for the project. •Form up a properly sized concrete footing for tank saddlers with welded anchoring. •Install bollards for each tank that is properly sized and meets all regulations. •Pour tank pad and bollards with four thousand (4,000) PSI ready mix concrete. •Supply and install two (2) five thousand (5,000) gallon cylinder Fireguard UL2085, or equal, above ground fuel tank with all required fittings and piping from the fuel tank to the fuel delivery system or approved equal per location. If not biding as specified, specify Make/Model: __________________________________ •Properly ground the fuel tank •Supply and install split containment and overfill protection. •Supply and install a Green Leaf Gauge, or equal, level gauge. If not biding as specified, specify Make/Model: __________________________________ •Install a cap to manually test the fuel level. •Supply an atmospheric vent cap to meet regulations. •Connect and modify to existing fuel delivery system for complete/functional installation comparable with Petrovend software that communicates with Phoenix fuel system. •All waste/debris will be removed from the site and disposed of properly by the completion of the job. •All work should be Monday thru Friday between 7 am and 3 pm unless prior approval from DPW Director. •All equipment shall have a minimum one (1) year manufacturer’s warranty. Workmanship shall be covered by a one (1) year warranty for all installation work. This project time will be for ninety (90) calendar days.
11/02/2023 07:00 PM UTC
23-4-2
Cross Gates Water System Well Improvements------New water well, controls, control building, generator, fencing, electrical service, equipment, utility lines, and various related items at the Ozone Pines site. Well improvements, new controls, control building, generator, equipment, utility lines, and related items at the Willow Wood site.
11/01/2023 07:00 PM UTC
23-45-1
Foxbriar Street Drainage Repair------Contractor must provide all labor, materials, tools, supervision, and equipment to remove/replace existing concrete sidewalk, panels and wrap pipe joints due to base failures as specified on Foxbriar Street (R08V020; S13-T9-R14) located in Slidell, Louisiana. The time period to complete the work shall be forty-five (45) calendar days from issuance of the Notice to Proceed issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
11/01/2023 07:00 PM UTC
23-47-1
Leonelle Circle & Bard Circle Drainage Repair----Contractor must provide all labor, materials, tools, and equipment to remove/ replace and/ or repair concrete sidewalk, concrete curbing and CB-06 at Leonelle Circle (R08I065; S25-T8-R14) in Slidell, and reseal pipe joints, remove/ replace concrete road panels and sidewalks at Bard Circle (R08I050; S25- T8-R14) located in Slidell, Louisiana as specified. The time period of completion is forty-five (45) days from the issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
11/01/2023 07:00 PM UTC
23-46-1
Place St. Charles & Place St. Germain Sinkhole Repairs----------------------------The Parish requires a Contractor to excavate around existing pipe and reseal the exterior of the pipe joint at Place St. Charles (R01E020; S47-T7-R11),and at Place St. Germain (R01E030; S47- T7-R10) in Covington, Louisiana.
11/01/2023 07:00 PM UTC
23-48-1
Kingspoint Blvd------------------------------------------------------------------------------------The Parish requires a Contractor to remove/replace concrete sidewalk panels on Kingspoint Blvd (R08V019; S13-T9-R14) in Slidell, Louisiana.
11/01/2023 07:00 PM UTC
23-39-2
Berry Todd Rd Bridge - The Contractor must provide all labor, equipment, materials, and tools necessary for the removal of concrete approach slabs and guard rail and installation of concrete approach slabs, and guard rail, as required per the construction drawings and specifications. The project location is Berry Todd Rd, Sections 43 and 39, Township 8, Range 13E in Lacombe, LA.
10/25/2023 07:00 PM UTC
23-42-1
Riverside Drive Drainage Repair ------ Contractor must provide all labor, materials, tools, supervision, and equipment to install sub-surface drainage with catch basins in order to prevent erosion in the roadside ditches at 71368 Riverside Drive (R03B002; S42-T7-R11) located in Covington, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from Notice to Proceed issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
10/25/2023 07:00 PM UTC
23-37-2
2023 East District Panel Replacements--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along the following roads: -Ellwood Cir (R08I062) Section 25 Township 8S Range 14E Slidell; -Dockside Dr (R08F031) Section 38 Township 8S Range 15E Slidell; -Cedarwood Dr (R08M067) Section 38 Township 9S Range 15E Slidell; -Clipper Dr (R09J018) Section 44 Township 9S Range 14E Slidell; -Meadow Lake Dr East (R08M075) Section 12 Township 9S Range 14E Slidell; -Foxcroft St (R08V019) Section 13 Township 9S Range 14E Slidell.
10/24/2023 07:00 PM UTC
301 - 310 of 981 Solicitations
1 2 27 28 29 31 33 34 35 98 99