General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
14 Solicitations

Closed Solicitations

Number Deadline
22-32-2
LOCK 1 BOAT LAUNCH RESOTRATION----------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary for the restoration of the Lock 1 Boat Launch located in Pearl River, Louisiana 70452, as listed within the plans and specifications.
11/30/2022 08:00 PM UTC
22-35-2
Truck-4k Gallon Sludge/Pump----------------------------------------The intent of this material bid is to define the minimum requirements of the St. Tammany Parish Department of Utilities for a vacuum liquid conveying sewer cleaner.
11/29/2022 08:00 PM UTC
22-45-1
Defiance Drive Drainage------------------------------------------------------Contractor must provide all labor, supplies, equipment, tools, permits, and materials to repair the drainage on Defiance Drive (R08I054; S25-T8-R14) in Slidell, Louisiana.
11/22/2022 08:00 PM UTC
22-41-1
St. Mary St. Building-----------------------------------------Contractor must provide all labor, equipment, tools, and materials necessary to demolish the building structure located at 61096 St. Mary St. Lacombe, La. 70445.
11/17/2022 08:00 PM UTC
22-34-2
Old River Rd Bridge--------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal of concrete approach slabs and guard rail and installation of concrete approach slabs, permanent steel sheeting, and guard rail, as required per the construction drawings and specifications. The project is located at Old River Rd, Section 37, Township 9, Range 15E in Slidell, LA.
11/15/2022 08:00 PM UTC
22-42-1
Scotch Pine Dr Drainage Repair--------Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the drainage located at the corner of Scotch Pine Dr (R04C021; S54-T7-R11) and Willow Circle (R04C024; S54-T7-R11) in Madisonville, Louisiana.
11/15/2022 08:00 PM UTC
22-40-1
Areas 2 Patching Repairs --- The Parish requires a Contractor to improve road surfaces with 8” Deep Patching as specified along Father Francis Drive (R05F023; S43-T5-R13) Bush; Watts Rd (R05E023; S28-T5-R13) Bush; Brankers Drive (R05E027; S28-T5-R13) Bush; Road Runner (R05E051; S42-T5-R13) Bush; Jerry Willis Road (R05C006; S39-T5-R12) Bush; William Galloway Cemetery (R05C003; S40-T5-R13) Bush; Maplewood Lane (R08G012; S30-T8-R15) Slidell; Brett Drive (R08F007; S29-T8-R15) Slidell; Dean Road (R08H019; S25-T8-R14) Slidell; Avenue G (R08H007; S13-T8-R14) Pearl River; Old Hwy 11 (R08D001; S31-T8-R15) Pearl River; Race Horse Road (R06H011; S8-T7-R14) Pearl River; Frank Jackley Road (R06C002; S14-T6-R14) Pearl River; Chris Kennedy Road (R06G002; S27-T7-R14) Pearl River; Mare Run (R09I037; S15-T8-R14) Slidell; Archie Singletary Road (R06H005; S19-T7R14) Pearl River, Louisiana.
11/15/2022 08:00 PM UTC
22-14-7
Janitorial Supplies--------Prices remain in effect from January 1, 2023, through December 31, 2023, with the option to extend for two (2) additional one-year renewals, by written agreement of both parties. Any delivery or service charge must be included in the bid price. Quantities may vary; minimum orders shall not be required. St. Tammany Parish Government reserves the right to award materials in whole, in part and/ or to multiple vendors. Bids must be submitted on the Pricing Sheet provided. All Price blank spaces must be filled in, NO blanks will be permitted. If the item is unavailable, or you are not bidding on the item, please enter N/A or No Bid.
11/03/2022 07:00 PM UTC
22-38-1
Ridgewood Loop Drainage Repair-----------------------Contractor must provide all labor, materials, equipment, tools, and supervision to reseal catch basin and remove/replace sidewalk located at 455 Ridgewood Loop (R04C002; S54-T7-R11) in Madisonville, Louisiana as required in the specifications.
10/27/2022 07:00 PM UTC
2-31-1
Koop Drive Landscaping Upgrade - The Parish requires a Contractor to provide labor, materials and equipment to demo and install new landscaping and new irrigation system.
10/25/2022 07:00 PM UTC
321 - 330 of 917 Solicitations
1 2 29 30 31 33 35 36 37 91 92