General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
14 Solicitations

Closed Solicitations

Number Deadline
22-25-1
Southdown Subdivision Repair...................... The Parish requires a Contractor to repair and reseal catch basins, man-hole box, remove and repair concrete panels and repair/reseal cross culvert under the roadway located on 400 Shady View Ln (R01K018; S41-T7-R10); 405 Southdown Lp (R01K019; S41-T7-R10) Madisonville; 656 & 680 Silverthorne Ln (R01K020; S41-T7-R10) in Covington, Louisiana.
06/01/2022 07:00 PM UTC
22-24-1
Autumn Woods Dr Drainage....................The Parish requires a Contractor to remove/replace existing drop inlets, remove and replace concrete driveway and catch basin on Autumn Woods Dr (R04E246; S48-T8-R12) in Lacombe, Louisiana.
06/01/2022 07:00 PM UTC
22-19-1
Biron St. Drainage-----------------------------------------------------------------------Contractor must provide all labor, materials, tools, and equipment to repair the drainage as listed in the specifications at locations along Biron Street (R04E050; S44-T8-R12) in Mandeville, Louisiana.
06/01/2022 07:00 PM UTC
22-20-1
Goldenwood Drainage Repair------------------------------------------------------------The Parish requires a Contractor to remove and replace a catch basin (CB-06), concrete driveway, sidewalk, mountable curb, and road panels, and clean, repair, and reseal interior pipe joints located at 244 Goldenwood Dr (R08M061; S38-T9-R15) Slidell, Louisiana, in accordance with specifications
06/01/2022 07:00 PM UTC
22-21-1
S Caleb Dr Repair--------------------------------------------------------------------------Contractor must provide all labor, materials, tools, and equipment to repair a pipe, reseal a catch basin and remove/replace mountable curb located at 562 & 571 S. Caleb Dr. (R08N100; S37-T9-R15) in Slidell, Louisiana 70461 in accordance with the specifications.
06/01/2022 07:00 PM UTC
22-16-1
Kay Drive Repair ---------------------------------------------------------- Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the roadway as specified near 60210 Kay Drive (R09C001; S-34-T9-R14) in Lacombe, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from issuance of the NTP by the Parish.
05/24/2022 07:00 PM UTC
22-17-1
Pawns Lane Repair ----- Contractor must provide all labor, materials, tools, and equipment to repair the sidewalk on Pawns Lane (R08I066; S26-T8-R14) located in Slidell, Louisiana as specified. The time period of completion is 30 days from Notice to Proceed issued by the Parish. A Quote Guarantee is not required for this project. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
05/18/2022 07:00 PM UTC
22-17-2
2022 District Panel Replacements ........................................................................................................................ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and replacing concrete road panels and/or rollover curbs as specified along the following Parish roads
05/05/2022 07:00 PM UTC
22-16-1
Kay Drive Repair ---------------------------------------------------------- Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the roadway as specified near 60210 Kay Drive (R09C001; S-34-T9-R14) in Lacombe, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from issuance of the NTP by the Parish.
05/05/2022 07:00 PM UTC
22-15-1
Victorian Lane Drainage ............................................................................................ The Parish requires a Contractor to remove and replace drain pipe, install catch basin and slab sodding located near the pond on Victorian Lane (R04D193; S39-T7-R11) in Mandeville, Louisiana.
05/04/2022 07:00 PM UTC
361 - 370 of 917 Solicitations
1 2 33 34 35 37 39 40 41 91 92