FAC 26-22Q
Project No. FAC 26-22Q
Building 12 Boiler Replacement
Sinclair Community College
444 West Third Street, Dayton, Ohio 45402
Bids Due: 2:00 PM, August 4, 2026; through the State’s electronic bidding system at https://bidexpress.com
EDGE Participation Goal: Not Required.
Domestic steel use is required per ORC 153.011.
Contract Estimated Cost
Base Bid - $597,856
Alternate 1 - $42,150
Alternate 2 - $30,785
Allowance H-1 $25,000.00 (The Allowance should be included in the base bid submitted on the bid form)
Pre-bid Meeting: July 28, 2026 at 2:00pm
Sinclair Community College
444 W. Third Street, Dayton, Ohio 45402
Building 17, Room 17140, Dayton, Ohio 45402.
Bid Documents: Available electronically at https://www.bidexpress.com.
More Info: Bids for this project are being received and published through the electronic bidding service Bid Express. All questions and answers to be submitted via Bid Express. Contact: Ron Hovell, Sinclair Project Coordinator, (937) 512-3048 or Nick Andrews - Heapy Engineering - (937) 367-0376
Scope: Replacement of one of the existing Boilers located in the lower level of Building 12. Scope also includes replacement of associated pumps serving the boilers.
NOTE: EQUIPMENT SHOP DRAWINGS FOR ALL EQUIPMENT TO BE PROVIDED UNDER THIS PROJECT ARE TO BE SUBMITTED WITH BIDS.
| 08/04/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
FAC 24-02 CHILLERS CAMPUS WIDE
Project No. FAC 24-02
Campus Wide Chillers
Sinclair Community College
444 West Third Street, Dayton, Ohio 45402
Bids Due: 2:00 PM, April 30, 2024; through the State’s electronic bidding system at https://bidexpress.com
EDGE Participation Goal: Not Required.
Domestic steel use is required per ORC 153.011.
Contract Estimated Cost
Base Bid (Bldg 12 & 20) $1,193,750.00
Alternate 1 (Bldg 9) $547,000.00
Pre-bid Meeting: April 18, 2024 at 10:00 AM, Sinclair Community College, 444 W. Third Street, Dayton, Ohio 45402. Building 17, Room 17140, Dayton, Ohio 45402.
Bid Documents: Available electronically at https://www.bidexpress.com.
More Info: Bids for this project are being received and published through the electronic bidding service Bid Express. All questions and answers to be submitted via Bid Express. Contact: Chris Haring, Sinclair Project Coordinator, (937) 512-2451 or David Zelinski, Nauman & Zelinski LLC Engineer, (937)-223-3821.
| 04/30/2024 06:00 PM UTC |
|
FAC 24-10
Project No. FAC 24-10 Install Pavers and Walkways, Building 10 North Green Space
444 W. Third St., Dayton, OH 45402
| 04/30/2024 06:00 PM UTC |
|
FAC 24-01
Project No. FAC# 24-01
Membrane Replacement Buildings 4, 5, 6, & 8
Sinclair Community College
Dayton, OH 45402
Bids Due: 2:00 PM local time, April 23, 2024; through the State’s electronic bidding system at https://bidexpress.com
Edge Participation Goal: 10.0%
Contract Estimated Cost General Contract $1,620,000.00 And any proper combination submitted on electronic Bid Form.
All Bidders are strongly encouraged to attend the Pre-Bid Meeting on Thursday April 4, 2024, at 2:00p.m. at the following
location: Sinclair Community College, Building 17 - Shop Area behind Conference Room 17140, 444 West Third Street,
Dayton, OH 45402.
Bid Documents: Electronically at https://bidexpress.com.
More Info: Bids for this project are being received and published through the electronic bidding service Bid Express. All questions and answers to be submitted via Bid Express. Contact: Rob Hensley, Sinclair Manager, Architectural Design, (937) 512-4597 or Brad Walker, THP, Ltd. Senior Restoration Project Manager, (513) 241-3222.
Questions to be submitted through Bid Express. Deadline to be 72 hours prior to Bid Opening. Description: “Questions asked outside of the Bid Express service will not be answered.”
| 04/23/2024 06:00 PM UTC |
|
FAC 24-18
Install Security Cameras Campus Wide. Dayton Main Campus and Centerville Campus.
| 04/12/2024 06:00 PM UTC |
|
FAC 24-14 Create Phlebotomy & Pharm Tech Labs
Project No. FAC 24-14
Create Phlebotomy & Pharmacy Tech Labs
Sinclair Community College
444 West Third Street, Dayton, Ohio 45402
Bids Due: 2:00pm local time, 4/2/2024; through the State’s electronic bidding system at https://bidexpress.com
Edge Participation Goal: Not Required
Domestic steel use is required per ORC 153.011.
Contract Estimated Cost
General Contract $347,000.00
Alternate #1 – ADD ZOOM capabililty to Pharm Tech Lab 203 $32,800.00
Alternate #2 – Provide new 2x2 LED lighting $3,500.00
Alternate #3 – Provide homogeneous vinyl flooring in Labs $6,500.00
Alternate #4 – ADD Wireless Access Points $2,500.00
Pre-bid Meeting: March 21, 2024 @ 9:00AM, Sinclair College, 5800 Clyo Road, Centerville, OH 45459
Bid Documents: Electronically at https://bidexpress.com.
More Info: Bids for this Project are being received and published through the electronic bidding service Bid Express. Bids will be opened via a virtual meeting through a Microsoft Teams link. All questions and answers to be submitted via Bid Express. Contact: Chris Haring, Sinclair Project Coordinator, (937) 512-2451 or Will Kaly, AIA at Levin Porter Architects, Phone: 937-224-1931
| 04/02/2024 06:00 PM UTC |
|
FAC 24-03 (RE-BID)
Project No. FAC 24-03 (RE-BID)
Move and Upgrade eLearn Production Studio (RE-BID)
Sinclair Community College
444 West Third Street, Dayton, Ohio 45402
Bids Due: 2:00 p.m. local time, February 23; through the State’s electronic bidding system at https://bidexpress.com
EDGE Participation Goal: Not Required.
Domestic steel use is required per ORC 153.011.
Contract Estimated Cost
General Contract (Base Bid) $1,100,000.00
Pre-bid Meeting: N/A
Bid Documents: Available electronically at https://bidexpress.com.
More Info: Bids for this project are being received and published through the electronic bidding service Bid Express. All questions and answers to be submitted via Bid Express. A/E contact: Bryan Greene, Champlin Architecture, Phone: (513) 969-1327, E-mail: bryan.greene@thinkchamplin.com.
| 02/23/2024 07:00 PM UTC |
|
24-06 (Rebid)
Project No. FAC 24-06 (REBID) - Utility Restoration - Phase II - Building 12 - Electric Feeders and Equipment
| 02/20/2024 07:00 PM UTC |
|
FAC 24-12
Project No. FAC 24-12
HVAC MAINTENANCE Bldg 20 (3 Units)
Sinclair Community College
444 West Third Street, Dayton, Ohio 45402
Bids Due: 2:00 PM, January 4, 2024; through the State’s electronic bidding system at https://bidexpress.com
EDGE Participation Goal: Not Required.
Domestic steel use is required per ORC 153.011.
Contract Estimated Cost
Base Bid $342,000.00
Alternate 1 $174,000.00
Alternate 2 $10,000.00
Alternate 3 $12,000.00
Alternate 4 $12,000.00
Pre-bid Meeting: December 20, 2023, 10:00 AM, Sinclair Community College, 444 W. Third Street, Dayton, Ohio 45402. Building 17, Room 17140, Dayton, Ohio 45402.
Bid Documents: Available electronically at https://bidexpress.com.
More Info: Bids for this project are being received and published through the electronic bidding service Bid Express. All questions and answers to be submitted via Bid Express. Contact: Chris Haring, Project Coordinator, Planning & Construction, (937) 512-2451 or Jeffrey Zelinski, Nauman & Zelinski LLC Engineer, (937)-223-3821.
| 01/04/2024 08:00 PM UTC |
|
FAC 24-07
Project No. FAC 24-07
HVAC MAINTENANCE
Sinclair Community College
444 West Third Street, Dayton, Ohio 45402
Bids Due: 2:00 PM, January 4, 2024; through the State’s electronic bidding system at https://bidexpress.com
EDGE Participation Goal: Not Required.
Domestic steel use is required per ORC 153.011.
Contract Estimated Cost
Base Bid $400,000.00
Pre-bid Meeting: December 20, 2023, 2:00 PM, Sinclair Community College, 444 W. Third Street, Dayton, Ohio 45402. Building 17, Room 17140, Dayton, Ohio 45402.
Bid Documents: Available electronically at https://bidexpress.com.
More Info: Bids for this project are being received and published through the electronic bidding service Bid Express. All questions and answers to be submitted via Bid Express. Contact: Chris Haring, Project Coordinator, Planning & Construction, (937) 512-2451 or David Zelinski, Nauman & Zelinski LLC Engineer, (937)-223-3821.
| 01/04/2024 07:00 PM UTC |
|
FAC 24-06
Project No. FAC 4-06 - Utility Restoration - Phase II Scope in Tunnel at Building 12 - Electric Feeders and Equipment.
| 12/21/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.