General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
6465
North Shore Drive and Bedford Street Storm Box Replacement-2013
06/14/2013 06:00 PM UTC
6886
ICE AGE JUNCTION PATH AND JEFFY PATH AND JEFFY TRAIL SANITARY SEWER ASSESSMENT DISTRICT
06/14/2013 06:00 PM UTC
7044
Breese Stevens Field Lighting/Sound System Improvements
06/07/2013 06:00 PM UTC
7051
Madison Water Utility Unit Well 31 - Drill Well
06/07/2013 06:00 PM UTC
6995
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2013
06/07/2013 06:00 PM UTC
6986
John Nolen Drive/North Shore Drive Intersection
06/07/2013 06:00 PM UTC
6590
Fire Station No. 13
05/24/2013 06:30 PM UTC
7045
Upgrade Booster Pumps at Unit Well 20
05/24/2013 06:00 PM UTC
6980
Brentwood Parkway, Monterey Drive, Trailsway, Wyldewood Drive and Wyldewood Circle Assessment District - 2013
05/24/2013 06:00 PM UTC
6981
Keyes Avenue Reconstruction Assessment District - 2013
05/24/2013 06:00 PM UTC
1081 - 1090 of 1107 Solicitations
1 2 103 104 105 106 107 109 111