General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
7431PlanHolders06052026.pdf (91.6 KB)
Contract 7431 - Cannonball Path Ph 6
8842PlanHolders06052026.pdf (87.4 KB)
Contract 8842 - SW Path & W Wash Signal
9758PlanHolders06052026.pdf (86.8 KB)
Contract 9758 - Milwaukee St Sprecher Road Signal
9787PlanHolders06052026.pdf (88.2 KB)
Contract 9787 - Newville Park Redevelopment
9795PlanHolders06052026.pdf (88.6 KB)
Contract 9795 - James Madison Park Wall
6 Documents

Upcoming Solicitations

Number Deadline
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
9795 - James Madison Park Retaining Wall Repair
This project will replace a failing concrete retaining wall in James Madison Park. This concrete wall supports the driveway to the underground parking garage serving the Lincoln School Apartments. The project uses a hybrid approach to replace a portion of the wall in kind then regrade a portion of the hillside within the park to support the driveway without a need for a retaining wall.
06/11/2026 07:00 PM UTC
8842 - Southwest Commuter Path & West Washington Avenue Traffic Signal
The work under this contract shall include but not be limited to removing existing Rectangular Rapid Flashing Beacons, installing new traffic signal bases, conduit, removing concrete sidewalk and ramps, and installing new sidewalks and ramps.
06/11/2026 07:00 PM UTC
9758 - Milwaukee Street & Sprecher Road Traffic Signal Assessment District
The work under this contract shall include but not be limited to removing and salvaging existing arms, poles, breakaway bases, and flashing red light devices; installing new traffic signal bases, conduit, and pullboxes. The project limits for the work at the intersection of Sprecher Road & Milwaukee Street are approximately 330-feet on each approach of the intersection.
06/11/2026 07:00 PM UTC
7431 - Cannonball Path Phase 6
The work under this contract shall include but is not limited to replacement and upgrade of sanitary sewer and laterals, storm sewer pipes and structures, as well as the installation and replacement of concrete sidewalk, concrete curb & gutter, concrete driveway aprons, concrete pavement, asphalt driveways, asphalt pavement, roadway base, path and street lighting, fiber conduit, pavement markings, bike-pedestrian bridge structure, and soil restoration.
06/11/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
7170
Unit Well 26 Reservoir Repairs
08/09/2013 06:00 PM UTC
7136
Blackhawk Park Shelter Installation
08/09/2013 06:00 PM UTC
7100
Park Paving 2013
08/09/2013 06:00 PM UTC
7137
Basketball Court Reconstruction - '13
07/26/2013 06:00 PM UTC
7161
Streets West Cold Storage Roof Replacement
07/26/2013 06:00 PM UTC
6962
South Point Warm Storage Building
07/15/2013 06:00 PM UTC
7008
CENTRAL PARK PHASE 1A
07/12/2013 06:00 PM UTC
7093
Reindahl Park Splash Pad
07/12/2013 06:00 PM UTC
7153
Garner Park Masonry Repairs-2013
07/12/2013 06:00 PM UTC
6991
Cottage Grove Road Reconstruction
07/12/2013 06:00 PM UTC
1061 - 1070 of 1109 Solicitations
1 2 103 104 105 107 109 110 111