City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 8562PlanHolders04142026.pdf (92.4 KB) |
Contract 8562 - Pontiac Boston Nokomis Rosewood
| |
| 8813PlanHolders04142026.pdf (90.1 KB) |
Contract 8813 - Elmside, Sommers, Center Ave
| |
| 8825PlanHolders04142026.pdf (86.9 KB) |
Contract 8825 - Annual SW Construction D2,6
| |
| 8827PlanHolders04142026.pdf (88.3 KB) |
Contract 8827 - Annual HZ Sawcutting D2,6
| |
| 9726PlanHolders04142026.pdf (97.8 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9756PlanHolders04142026.pdf (90 KB) |
Contract 9756 - Sherman/Shabazz Improvements
| |
| 9766PlanHolders04142026.pdf (90.3 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| 9780PlanHolders04142026.pdf (89.6 KB) |
Contract 9780 - CIPP UV Lining Ph 1 2026
| |
| Number | Deadline |
|---|---|
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 04/23/2026 07:00 PM UTC |
|
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave.
The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
| 04/23/2026 07:00 PM UTC |
|
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
| 04/23/2026 07:00 PM UTC |
|
8813 - Elmside Boulevard, Sommers Avenue, and Center Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main and laterals; replacement of water main and reconnection of water services; replacement of storm sewer main, structures, and laterals; excavation; base preparation; installation of curb and gutter; driveway aprons; sidewalk spot repairs; asphalt pavement; pavement marking; and signing.
| 04/23/2026 07:00 PM UTC |
|
8827 - Annual Horizontal Sawcutting Concrete Sidewalk and Incidental Work (Districts 2 and 6)
The Contractor shall perform repair work primarily throughout the 2nd and 6th Aldermanic Districts. A list of approved repair locations and an area map of Aldermanic District 2 and 6 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
| 04/23/2026 07:00 PM UTC |
|
8825 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 2 and 6)
The Contractor shall perform repair work primarily throughout Alder Districts 2 and 6. This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work. A list of repair locations and an area map have been provided within these Special Provisions for reference.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
6465
North Shore Drive and Bedford Street Storm Box Replacement-2013
| 06/14/2013 06:00 PM UTC |
|
6886
ICE AGE JUNCTION PATH AND JEFFY PATH AND JEFFY TRAIL SANITARY SEWER ASSESSMENT DISTRICT
| 06/14/2013 06:00 PM UTC |
|
7044
Breese Stevens Field Lighting/Sound System Improvements
| 06/07/2013 06:00 PM UTC |
|
7051
Madison Water Utility Unit Well 31 - Drill Well
| 06/07/2013 06:00 PM UTC |
|
6995
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2013
| 06/07/2013 06:00 PM UTC |
|
6986
John Nolen Drive/North Shore Drive Intersection
| 06/07/2013 06:00 PM UTC |
|
6590
Fire Station No. 13
| 05/24/2013 06:30 PM UTC |
|
7045
Upgrade Booster Pumps at Unit Well 20
| 05/24/2013 06:00 PM UTC |
|
6980
Brentwood Parkway, Monterey Drive, Trailsway, Wyldewood Drive and Wyldewood Circle Assessment District - 2013
| 05/24/2013 06:00 PM UTC |
|
6981
Keyes Avenue Reconstruction Assessment District - 2013
| 05/24/2013 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.