General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8616 - St. Paul Avenue, Ohio Avenue, Talmadge Street, Jackson Street and LaFollette Avenue Reconstruction Assessment District - 2022
8616 - St. Paul Avenue, Ohio Avenue, Talmadge Street, Jackson Street and LaFollette Avenue Reconstruction Assessment District - 2022
02/17/2022 08:00 PM UTC
9127 - Tenney Park East Johnson St. Pedestrian Bridge Wing Walls
9127 - Tenney Park East Johnson St. Pedestrian Bridge Wing Walls
02/03/2022 08:00 PM UTC
9118 - 2022 Sport Court Resurfacings
2022 Sport Court Resurfacings
02/03/2022 08:00 PM UTC
8505 - Cedar Street and Beld Street Assessment District - 2022
Cedar Street and Beld Street Assessment District - 2022
01/20/2022 08:00 PM UTC
9131 - State Street Capitol Garage (SSCO) Generator Replacement
State Street Capitol Garage (SSCO) Generator Replacement
01/20/2022 08:00 PM UTC
9136 - Metro Transit Satellite Facility - Controls Upgrade
9136 - Metro Transit Satellite Facility - Controls Upgrade
01/20/2022 08:00 PM UTC
9430 - Sprecher Road Greenway Improvement
9430 - Sprecher Road Greenway Improvement
01/06/2022 08:00 PM UTC
9087 - Metro Transit Satellite Facility - Controls Upgrade
9087 - Metro Transit Satellite Facility - Controls Upgrade
12/16/2021 08:00 PM UTC
8606 - South Point Rd Truck Scale and Fuel Point
8606 - South Point Rd Truck Scale and Fuel Point
12/16/2021 08:00 PM UTC
8573 - Kroncke Drive, Lanett Circle, and Tanager Trail Assessment District - 2021
8573 - Kroncke Drive, Lanett Circle, and Tanager Trail Assessment District - 2021
10/21/2021 07:00 PM UTC
301 - 310 of 1107 Solicitations
1 2 27 28 29 31 33 34 35 110 111