General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
07/03/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
8313: CITY VIEW DRIVE ASSESSMENT DISTRICT - 2020
CITY VIEW DRIVE ASSESSMENT DISTRICT - 2020
03/26/2020 07:00 PM UTC
8495 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 4 & 8) - 2020
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 4 & 8) - 2020
03/19/2020 07:00 PM UTC
8510 - Chip Sealing 2020 - West
8510 - Chip Sealing 2020 - West
03/19/2020 07:00 PM UTC
8509 - Chip Sealing 2020 - East
8509 - Chip Sealing 2020 - East
03/19/2020 07:00 PM UTC
8493 - ANNUAL CONSTRUCTION AND RECONSTRUCTION OF CONCRETE SIDEWALK AND INCIDENTAL CONCRETE CURB & GUTTER WORK ORDERED (DISTRICT 4 & 8) BY THE COMMON COUNCIL
ANNUAL CONSTRUCTION AND RECONSTRUCTION OF CONCRETE SIDEWALK AND INCIDENTAL CONCRETE CURB & GUTTER WORK ORDERED (DISTRICT 4 & 8) BY THE COMMON COUNCIL
03/19/2020 07:00 PM UTC
8508 - Repairing and Sealing Pavement Cracks - Major Streets 2020
8508 - Repairing and Sealing Pavement Cracks - Major Streets 2020
03/19/2020 07:00 PM UTC
8507 - Repairing and Sealing Pavement Cracks - Local Streets 2020
8507 - Repairing and Sealing Pavement Cracks - Local Streets 2020
03/19/2020 07:00 PM UTC
8502-PACKERS AVENUE RESURFACING ASSESSMENT DISTRICT-2020
PACKERS AVENUE RESURFACING ASSESSMENT DISTRICT-2020
03/19/2020 07:00 PM UTC
8306 - Toepfer Avenue, Holly Avenue, Euclid Avenue and St. Clair Street Assessment District - 2019
8306 - Toepfer Avenue, Holly Avenue, Euclid Avenue and St. Clair Street Assessment District - 2019
03/19/2020 07:00 PM UTC
9428 - Warner Lagoon Pier and Ice Access
Warner Lagoon Pier and Ice Access
03/05/2020 08:00 PM UTC
361 - 370 of 1047 Solicitations
1 2 33 34 35 37 39 40 41 104 105