General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02122026.pdf (91.3 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02122026.pdf (92.9 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02122026.pdf (84.4 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02122026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/12/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
8293 - New Sidewalk Installation - 2019
New Sidewalk Installation - 2019
06/20/2019 07:00 PM UTC
8421 - Hawks Landing Flood Mitigation South - 2019
Hawks Landing Flood Mitigation South - 2019
06/20/2019 07:00 PM UTC
9411 - McKenna Boulevard Flood Mitigation
9411 - McKenna Boulevard Flood Mitigation
06/13/2019 07:00 PM UTC
8328 - 2019 Olbrich Park (At Walter Street) Site Improvements
2019 Olbrich Park (At Walter Street) Site Improvements
06/06/2019 07:00 PM UTC
8425 - Park Paving 2019
Park Paving 2019
06/06/2019 07:00 PM UTC
8427 - Fire Station No. 14 Training Tower
Fire Station No. 14 Training Tower
06/06/2019 07:00 PM UTC
8305 - Davidson Street, Dempsey Road, Maher Avenue, Park Court, Drexel Avenue, and Lake Edge Boulevard Assessment District - 2019
Davidson Street, Dempsey Road, Maher Avenue, Park Court, Drexel Avenue, and Lake Edge Boulevard Assessment District - 2019
06/06/2019 07:00 PM UTC
8420 - Glenwood Children's Park Stormwater Improvements
Glenwood Children's Park Stormwater Improvements
06/06/2019 07:00 PM UTC
8312: South Point Road Assessment District - 2019
South Point Road Assessment District - 2019
06/06/2019 07:00 PM UTC
9404 - Reindahl Park Utility Structure Improvements
Reindahl Park Utility Structure Improvements
05/23/2019 07:00 PM UTC
441 - 450 of 1072 Solicitations
1 2 41 42 43 45 47 48 49 107 108