City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
Name * | Description | |
---|---|---|
How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
8763PlanHolders06182025.pdf (89.9 KB) |
Contract 8763 - Badger Rusk Path
| |
8784PlanHolders06182025.pdf (91.4 KB) |
Contract 8784 - E Main S Hancock
| |
9612PlanHolders06182025.pdf (108 KB) |
Contract 9612 - CIPP UVLining - Phase 1 2025
| |
9626PlanHolders06182025.pdf (110 KB) |
Contract 9626 - Mid Town Hydraulic Improvements
| |
9654PlanHolders06182025.pdf (106 KB) |
Contract 9654 - CIPP Thermal Lining - Phase 1
| |
Number | Deadline |
---|---|
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
| 06/20/2025 07:00 PM UTC |
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
| 06/20/2025 07:00 PM UTC |
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
| 06/20/2025 07:00 PM UTC |
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
| 06/25/2025 07:00 PM UTC |
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
| 07/03/2025 07:00 PM UTC |
8785 - Meyer Avenue Assessment District - 2025
Work includes excavation, sanitary sewer main and
laterals, storm sewer pipe and structure installation, sanitary sewer main and laterals, excavation, gravel base course, asphalt pavement, pervious pavement, concrete curb & gutter, driveway aprons, lighting conduit and base/poles, terrace rain gardens, soil restoration, pavement markings, and signing.
| 07/03/2025 07:00 PM UTC |
Number | Deadline |
---|---|
8298 - Groveland Terrace Assessment District- 2019
8298 - Groveland Terrace Assessment District- 2019
| 03/07/2019 08:00 PM UTC |
8238 - Metro Transit - Service Lane Addition - Phase 1
8238 - Metro Transit - Service Lane Addition - Phase 1
| 02/28/2019 08:00 PM UTC |
8119 - S. Bryan Street, Daley Drive, James Street and Thorp Street Reconstruction District 2018
8119 - S. Bryan Street, Daley Drive, James Street and Thorp Street Reconstruction District 2018
| 02/28/2019 08:00 PM UTC |
8320 - Resurfacing 2019 - Asphalt Base Patching and Base Patch Grinding
8320 - Resurfacing 2019 - Asphalt Base Patching and Base Patch Grinding
| 02/28/2019 08:00 PM UTC |
8301 - Reetz Road and Altem Circle Resurfacing Assessment District - 2019
8301 - Reetz Road and Altem Circle Resurfacing Assessment District - 2019
| 02/28/2019 08:00 PM UTC |
8319 - Resurfacing 2019 - Asphalt Pavement Pulverizing, Milling & Paving
8319 - Resurfacing 2019 - Asphalt Pavement Pulverizing, Milling & Paving
| 02/28/2019 08:00 PM UTC |
8390 - CIPP WET LINING REHAB OF SANITARY SEWERS - 2019
8390 - CIPP WET LINING REHAB OF SANITARY SEWERS - 2019
| 02/28/2019 08:00 PM UTC |
8318 - RESURFACING 2019 - CURB & GUTTER AND CASTINGS
8318 - RESURFACING 2019 - CURB & GUTTER AND CASTINGS
| 02/28/2019 08:00 PM UTC |
7613 - Portage Road Assessment District - 2016 And Eastpark Multi-Use Path & Bridge and Eastlawn Multi-Use Bridge
7613 - Portage Road Assessment District - 2016 And Eastpark Multi-Use Path & Bridge and Eastlawn Multi-Use Bridge
| 02/21/2019 08:00 PM UTC |
8367 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 9) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 9) by the Common Council
| 02/21/2019 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.