General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2014
SANITARY, STORM, AND COMBINED SEWER MAINS RELAY, COMBINED SEWER LINING, AND SANITARY SEWER ABAONDONMENT in: S. 28th St. – W. Hayes Ave. to W. Forest Home Ave. S. 35th St. – 270’ N. of W. Mitchell St. to 300’ S. of W. Burnham St. S. 42nd St. (Various Locations) – W. Forest Home Ave. to 100’ +/- S. of W. Euclid Ave. W. Euclid Ave. – S. 42nd St. to S. 43rd St.
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 55-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALT PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, POROUS PAVEMENT, RETAINING WALL, ETC, located at (TD06780002) The Brewery Phase 4 (W. Highland Ave., W. McKinley Ave., W. Winnebago St., N. 8th St., N. 9th St., N. 10th St., N. 11th St.) ALTERNATE 1: W. Winnebago St. - N. 8th St. (ext'd) to N. 10th St. (s. of s. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W. Winnebago St., N 8th St., N. 9th St., N 10th St., N 11th St. ALTERNATE 2: W. Highland Av. - N. 8th St. to N. 10th St. (n. of n. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W Winnebago St., N. 8th St., N 9th St., N 10th St., N. 11th St.)
06/18/2014 03:30 PM UTC
OFFICIAL NOTICE 54-1-2014
CONSTRUCTION OF 9” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211130136) E. Greenfield Ave. - Kinnickinnic River to S. 1st St.
06/17/2014 03:30 PM UTC
OFFICIAL NOTICE 67-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211140146) W. Hope Ave. - N. 35th St. to N. 38th St.
06/13/2014 03:30 PM UTC
OFFICIAL NOTICE 53-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, ROADWAY CUTTING, CURB REMOVAL, ETC, located at (ST211050113) N. 37th St. – W. Meinecke Av. to W. Clarke St. (also TID 40); (ST211130139) W. Lloyd St. - N. 35th St. to W. Lisbon Ave. (also TID 40)
06/11/2014 03:30 PM UTC
OFFICIAL NOTICE 29-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140101) High Impact Streets #1 - Asphalt Resurface by Contract; W. Cherry St. – Martin Luther King Dr. to Water St.; W. Wells St – N. 13th St. to N. 17th St.; N. 4th St. – Clybourn St. to Wisconsin Ave.
06/10/2014 03:30 PM UTC
OFFICIAL NOTICE 70-1-2014
R.A. ANDERSON WATER TOWER AND MUNICIPAL BUILDING REROOFING OF THE 2ND FLOOR ROOF 4001 S. 6TH STREET MILWAUKEE, WI 53221
06/10/2014 03:30 PM UTC
OFFICIAL NOTICE 74-1-2014
2014 Sanitary Manhole Rehabilitation
06/09/2014 03:30 PM UTC
OFFICIAL NOTICE 30-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140102) High Impact Streets #2; N. 16th St. – W. Wisconsin Ave. to W. Kilbourn St.; N. Renee St. – W. Kilbourn St. to W. State St.; N. 55th St. – N. Hawley/W. Vliet to N. Lisbon; N. 8th St. – W. North Ave. to W. Center St.; N. Teutonia Ave. – W. Villard Ave. to W. Silver Spring Dr.
06/06/2014 03:30 PM UTC
OFFICIAL NOTICE 42-1-2014
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT,PAVEMENT REMOVAL, CRUSHED STONE BASE, SAWING, ETC, located at (ST212140111) Alley between W. Cherry St, W. Galena St, N. Hawley Rd, and N. 54th St.; (ST212120101) Alley between W. Melvina St, W. Vienna Av, N. 67th St and N. 68th St. (south half); (ST212140101) Alley between W. Capitol Dr, W. Fiebrantz Av, W. Fiebrantz Ct, N. 79th St and N. 81st St.; (ST212140117) Alley between W. Garfield Av, W. North Av, N. 44th St. and N. 45th St.; (ST212130114) Alley between W. Brooklyn Pl, N. Norwood Pl, W. Roosevelt Dr and N. 55th St.
06/05/2014 03:30 PM UTC
1431 - 1440 of 1601 Solicitations
1 2 140 141 142 144 146 147 148 160 161