General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 52-2-2014
SANITARY, COMBINED, AND STORM SEWER MAINS RELAY AND LINING, MANHOLE REPAIR &LINING, AND SANITARY BYPASS PUMP SITE RECONSTRUCTION
04/28/2014 03:30 PM UTC
OFFICIAL NOTICE 40-1-2014
CONSTRUCTION OF CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWER WORK, SODDING, ETC, located at (ST211120115) W. Legion St. - S. 24th St. to S. Layton Bl.; (ST211110116) S. 66th St. - W. Dickinson St. to W. Main St.
04/24/2014 03:30 PM UTC
OFFICIAL NOTICE 45-1-2014
This project involves the Interior Painting of the 2nd and Plankinton Parking Structure, including but not limited to; ceilings, columns, beams, walls, doors, trim, windows, drain piping, parapets, steel railing, stairway, and incidental work. The parking structure is located at 724 North 2nd Street, Milwaukee, Wisconsin.
04/17/2014 03:30 PM UTC
OFFICIAL NOTICE 21-1-2014
WP-318: SOUTH FILTERED WATER RESERVOIR ROOF REPLACEMENT PROJECT LOCATED AT 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
04/09/2014 02:30 PM UTC
OFFICIAL NOTICE 48-1-2014
2014 BYPASS PUMP REHABILITATION PART 1
04/04/2014 03:30 PM UTC
OFFICIAL NOTICE 41-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, RUBBLIZING CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWER WORK, SODDING, ETC, located at (ST211130117) N. 73rd St. – W. Calumet Rd. to W. Bradley Rd.; (ST211130107) W. Tower Ave. – N. 87th St. to N. Faulkner Rd.
04/03/2014 03:30 PM UTC
OFFICIAL NOTICE 17-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211040132) S. Honey Creek Dr. – W. Cold Spring Rd. to S. 60th St. (Including W Leroy Ave – S. 57th St. to S. Honey Creek Dr.); (ST211110117) S. 67th St. – W. Fremont Pl. to W. Cleveland Ave.; (ST211130137) S. 28th St. – A point south of W. Cleveland Ave. (U.P.R.R.) to W. Cleveland Ave.
04/02/2014 03:30 PM UTC
OFFICIAL NOTICE 15-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211110111) S. 2nd St. – A point south of W. Norwich St. to W. Howard Av.; (ST211120107) S. Griffin Av. – E. Morgan Av. to E. Holt Ave.
03/28/2014 03:30 PM UTC
OFFICIAL NOTICE 39-1-2014
Expansion bearing replacement and overhead concrete surface repairs at the Sixth Street Viaduct Cable-Stayed Bridges.
03/27/2014 03:30 PM UTC
OFFICIAL NOTICE 28-1-2014
SANITARY SEWER AND STORM SEWER MAIN LINING AND REPAIR, & MANHOLE REPAIR AND LINING IN S. Howell Ave. - E./W. Howard Ave. to E./W. Layton Ave.
03/25/2014 03:30 PM UTC
1461 - 1470 of 1601 Solicitations
1 2 143 144 145 147 149 150 151 160 161