We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 142-1-2013
SIDEWALK SNOW/ICE REMOVAL ON CITY-OWNED PROPERTIES
10/04/2013 03:30 PM UTC
OFFICIAL NOTICE 144-1-2013
SIDEWALK SNOW/ICE REMOVAL ON CITY-OWNED PROPERTIES
10/04/2013 03:30 PM UTC
OFFICIAL NOTICE 110-1-2013
N Edison Street from W. State to W. Juneau Ave and N 72nd Street from the north line of West Chambers Street to W. Burleigh Street
10/04/2013 03:30 PM UTC
OFFICIAL NOTICE NO. 139-1-2013
SANITARY SEWER MAIN LINING & REPAIR, AND MANHOLE REPAIR & LINING IN: Area Bounded By W. Silver Spring Drive to W. Douglas Avenue and N. 27th Street to N. 43rd Street
09/30/2013 03:30 PM UTC
OFFICIAL NOTICE 120-1-2013
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, PAVEMENT GRINDING, SODDING, ETC, located at (ST211130112) N. 94th St. – W. Burleigh St. to W. Keefe Ave.
09/26/2013 03:30 PM UTC
OFFICIAL NOTICE 136-1-2013
809 BROADWAY BUILDING ITMD FOURTH FLOOR CARPET AND FLOORING REPLACEMENT
09/26/2013 03:30 PM UTC
OFFICIAL NOTICE 107-1-2013
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SEEDING, ETC, located at (ST211060117) S. 10th St. – W. Greenfield Ave. to W. Washington St., (ST210130102) E. Clifford St. – S. Greeley St. to a point West of S. Greeley St.
09/25/2013 03:30 PM UTC
OFFICIAL NOTICE 121-1-2013
PROJECT NO. 1: CONSTRUCTION OF CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST210120101) N. Buffum St. – A point 350’ south of E. Keefe Ave. to E. Keefe Ave., (ST211130113) W. Zellman Ct. – S. 13th St. to a point west of S. 13th St., (ST210130101) N. 24th Pl. – W. Cornell St. to W. Purdue St., (ST211130170) S. Bay St. (East Side) – E. Potter Ave. to E. Conway St., (ST211130199) E. Kilbourn Ave. (N/S) and N. Old World Third St. (E/S)
09/24/2013 03:30 PM UTC
OFFICIAL NOTICE 133-1-2013
CONSTRUCTION OF VT ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, ETC, located at (ST211130173) N. Milwaukee St. – E. Menomonee St. to E. St. Paul Ave.
09/23/2013 03:30 PM UTC
OFFICIAL NOTICE 91-1-2013
CONSTRUCTION OF 8” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, ETC, located at (ST211120154) S. Carferry Dr. – E. Lincoln Ave. to 5100' +/- N. of E. Lincoln Ave.