The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE NO. 11-1-2026
Description: Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5” Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6” Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; Located at: ST216250111 – ADA Ramps for 2026 High Impact Paving @ Various Locations (South Side Projects). The scope of this contract is to remove and replace the ADA ramp on Menomonee River Pkwy/Tower View Rd. In addition, all of the pedestrian ramps within the limits of the following “high-impact” asphalt paving projects as follows: O.N. 14-1-2026 S. 52nd Pl. - W. Cleveland Av. to S. 53rd St. N. 68th St. - W. Center St. to W. Lisbon Av. N. 80th St. - W. Burleigh St. to W. Lisbon Av. N. 81st St. - W. Lorraine Pl. to W. Burleigh St. S. 89th St. - W. Howard Av. to W. Warnimont Av. S. 90th St. - W. Crawford Av. to W. Warnimont Av. N. 90th St. - W. Hawthorne Av. to W. Mt. Vernon Av. S. 91st St. - W. Morgan Av. to W. Holt Av. S. 99th St./Ct. - A point south of W. Ohio Av. to W. Oklahoma Av. W. Concordia Av. - N. 84th St. to N. 92nd St. W. Mount Ct. - N. 54th St. to N. 55th St. W. Ohio Av. - S. 97th St. to S. 99th Ct. W. St. Paul Av. - N. Hawley Rd. to N. 62nd St. O.N. 15-1-2026 S. 1st Pl.- W. Bolivar Av. to W. Waterford Av. S. 1st St. - W. Bolivar Av. to W. Waterford Av. S. 2nd St. - W. Bolivar Av. to W. Waterford Av. S. 5th Pl. - W. Armour Av. to W. Bottsford Av. S. 10th St. - W. Washington St. to W. National Av. S. 14th St. - A point south of W. Cleveland Av. to W. Cleveland Av. S. 29th St. - W. Lapham St. to W. Greenfield Av. S. 34th St. - W. Kinnickinnic River Pk. to W. Forest Home Av. S. 34th St. - W. Oklahoma Av. to W. Manitoba St. E. Armour Av. - S. Quincy Av. to S. Howell Av. E. Euclid Av. - S. Brust St. to S. Clement Av. E. Falling Heath Pl. - S. Kinnickinnic Av. to S. Pennsylvania Av. S. Hanson Av. - E. Howard Av. to E. Saveland Av. E. Malvern Pl. - S. Pennsylvania Av. to S. Kinnickinnic Av. W. Manitoba St. - S. 6th St. to S. 11th St. W. Rogers St. - S. 6th St. to Point east of S. 8th St. E. Tripoli Av. - S. Brust Av. to S. Hanson Av.
03/18/2026 03:30 PM UTC
OFFICIAL NOTICE 37-1-2026
PROJECT 1: 2026 SANITARY BYPASS PUMP CONTROL CABINET REPLACEMENT AND SERVICE UPGRADES Located at: Various Locations
03/19/2026 03:30 PM UTC
OFFICIAL NOTICE 46-1-2026
Concrete Repairs and Painting of the Lower Level of MacArthur Square Parking Structure
03/25/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 9-1-2026
2026 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/23/2026 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC