General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 34-6-2025
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
02/25/2025 04:30 PM UTC
OFFICIAL NOTICE 2-1-2025
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF ADA RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK, ETC.;
02/21/2025 04:30 PM UTC
OFFICIAL NOTICE 16-1-2025
HARBOR DISTRICT RIVERWALK PROJECT - NORTH
02/20/2025 04:30 PM UTC
OFFICIAL NOTICE 17-1-2025
HARBOR DISTRICT RIVERWALK PROJECT - SOUTH
02/20/2025 04:30 PM UTC
OFFICIAL NOTICE 15-1-2025
A. This project consists of permanently abandoning a well that is located in our Robert Anderson Tower basement. The well is 1834 feet deep. There is wood floating in water at around 319 feet deep. The wood will need to be removed per WDNR. Additionally, the 12-inch diameter ungrouted liner would either need to be removed, shot, or ripped prior to abandoning the well (ss. NR 811.13(4)(a) & NR 811.13(4)(d), Wis. Adm. Code). The well must be abandoned per ss. NR 811.13(4)(a) & NR 811.13(4)(d), Wis. Adm. Code. Once completed, the contractor would then need to submit a well filling and sealing report in accordance with (s. NR 811.13(8), Wis. Adm. Code).
02/19/2025 04:30 PM UTC
OFFICIAL NOTICE 30-1-2025
500 LEAD SERVICE LINE REPLACEMENTS – EQUITY PRIORITIZATION PROGRAM
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 30-2-2025
500 LEAD SERVICE LINE REPLACEMENTS – EQUITY PRIORITIZATION PROGRAM
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 30-3-2025
200 LEAD SERVICE LINE REPLACEMENTS – EQUITY PRIORITIZATION PROGRAM
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 31-1-2025
WATER MAIN RELAYS AND HYDRANT ALTERATIONS, at the following locations: E Michigan St (WT410240733), N Cass St to N Lincoln Memorial Dr (3 working days); S 43rd St (WT410240736), W Howard Ave to W Cold Spring Rd (3 working days); N 35th St (WT410240737), W Lisbon Ave to W North Ave (3 working days); W Morgan Ave (WT410240739), S 6th St to S 20th St (4 working days); W Lisbon Ave (WT410240753), W Burleigh St to N 100th St (35 working days). (Note: Contractor to furnish and install approximately 556 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/17/2025 04:30 PM UTC
OFFICIAL NOTICE 22-1-2025
Traffic Safety Improvements, High Impact Asphaltic Concrete Paving & ADA Sidewalk Project
02/14/2025 04:30 PM UTC
71 - 80 of 1491 Solicitations
1 2 3 4 5 6 8 10 11 12 149 150