General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 122-1-2022
ELECTRICAL WORK TO REPLACE MOTOR CONTROL CENTER MCC-1, MCC-1A, AND ASSOCIATED LOAD CENTERS IN THE CHEMICAL BUILDING AT THE MILWAUKEE WATER WORKS (MWW) LINWOOD WATER TREATMENT PLANT (LWTP)
11/16/2022 04:30 PM UTC
OFFICIAL NOTICE 118-1-2022
SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING AND LATERAL GROUTING in: Area Bounded By W. Congress St. to W. Glendale Ave. and N. 66th St. to N. 70th St.
11/03/2022 03:30 PM UTC
OFFICIAL NOTICE 119-1-2022
WP-337A: LINNWOOD REVETMENT REPAIRS AND REHABILITATION This project consists of repairing the steel sheet piles surrounding the north and south outfall pipes on the revetment seawall, rehabilitating the fill behind the piles, and replacing the damaged road above the pipes. Located at: LINNWOOD WATER TREATMENT PLANT
10/27/2022 03:30 PM UTC
OFFICIAL NOTICE 120-1-2022
THE REMOVAL OF EXISTING LIGHTING FIXTURE UNITS AND INSTALLATION OF NEW LIGHING LED FIXTURE UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, ETC.; Located at: ST240220518 – LED Street Lighting Improvements @ Various Locations (City Wide)
10/26/2022 03:30 PM UTC
OFFICIAL NOTICE 117-1-2022
BIOSWALES Located at: W. Oklahoma Ave.: 115’+/- east of South 72nd St. to 465’+/- west of South 61st St. W. Howard Ave.: 197’+/- west of South 76th St. to 285’+/- west of South 92nd St.
10/20/2022 03:30 PM UTC
OFFICIAL NOTICE 115-1-2022
WITKOWIAK PARK SYNTHETIC TURF - For furnishing all material and doing all the work necessary and required to install synthetic turf surfacing at Witkowiak Park, 1656 South 4th Street, Milwaukee, WI 53204
10/12/2022 03:30 PM UTC
OFFICIAL NOTICE 110-1-2022
CENTURY CITY BUSINESS PARK ROOF MAINTENANCE & REPAIRS 3533 NORTH 27TH STREET MILWAUKEE, WI
10/11/2022 03:30 PM UTC
OFFICIAL NOTICE 101-1-2022
WATER MAIN ALTERATIONS AND RELAYS, at the following locations: W. Walnut St. (WT410220001), N. 12th St. to N. 20th St. (53 working days) and N. 17th St. (WT410220688), W. Galena St. to W. Walnut St. (13 working days). (Note: Contractor to furnish and install approximately 640 lin. ft. of 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
09/28/2022 03:30 PM UTC
OFFICIAL NOTICE 114-2022
WITKOWIAK PARK SYNTHETIC TURF - For furnishing all material and doing all the work necessary and required to install synthetic turf surfacing at Witkowiak Park 1656 South 4th Street, Milwaukee, WI 53204
09/26/2022 03:30 PM UTC
Official Notice 113-1-2022
200 LEAD SERVICE LINE REPLACEMENTS
09/22/2022 03:30 PM UTC
291 - 300 of 1475 Solicitations
1 2 26 27 28 30 32 33 34 147 148