General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 2-1-2023
GROUNDS-KEEPING SERVICES at the following locations: Linnwood Water Treatment Plant (3000 N. Lincoln Memorial Dr.), North Point Pumping Station (2275 N. Lincoln Memorial Dr.), North Point Fountain / Water Tower Park (2417 E. North Ave.), Kilbourn Reservoir Park (626 E. North Ave.) and Riverside Pumping Station (1311 E. Chambers St.)
02/08/2023 04:30 PM UTC
OFFICIAL NOTICE 2-2-2023
GROUNDS-KEEPING SERVICES at the following locations: Florist Pumping Station (8525 W. Florist Ave.), Hawley Road Elevated Storage Tank (1235 N. Hawley Rd.) and Adler Pumping Station (8525 W. Adler St.)
02/08/2023 04:30 PM UTC
OFFICIAL NOTICE 2-3-2023
GROUNDS-KEEPING SERVICES at the following locations: Howard Avenue Water Treatment Plant (3929 S. 6th St.), Texas Pumping Station (2900 E. Texas Ave.), Grange Pumping Station (5353 S. 43rd St., Greenfield), Lincoln Pumping Station (3641 W. Lincoln Ave.) and Greenfield Elevated Storage Tank (8787 W. Waterford Ave., Greenfield)
02/08/2023 04:30 PM UTC
OFFICIAL NOTICE 29-1-2023
2023 SANITARY BYPASS PUMP & SANITARY LIFT STATION INSPECTION AND BYPASS PUMP WET TESTING
02/02/2023 04:30 PM UTC
OFFICIAL NOTICE 10-1-2023
SANITARY AND STORM SEWER MAIN RELAY IN: S. 37th St. – W. Burnham St. to W. Grant St. W. Becher St. – S. 36th St. to S. 37th St.
01/27/2023 04:30 PM UTC
OFFICIAL NOTICE 10-2-2023
COMBINED SEWER MAIN RELAY in: N. 37th St. - W. Highland Blvd. to W. Juneau Ave. N. 38th St. - W. Highland Blvd. to W. Juneau Ave.
01/27/2023 04:30 PM UTC
OFFICIAL NOTICE 126-1-2022
MILWAUKEE SAFETY ACADEMY BLEACHER REPLACEMENT 6680 NORTH TEUTONIA AVENUE MILWAUKEE, WISCONSIN 53209
01/26/2023 04:30 PM UTC
OFFICIAL NOTICE 127-1-2022
300 LEAD SERVICE LINE REPLACEMENTS PRIOR TO PAVING
01/04/2023 04:30 PM UTC
OFFICIAL NOTICE 125-1-2022
WATER MAIN RELAYS, at the following locations: E. Reservoir Av. (WT410210618), N. Hubbard St. to N. Buffum St. (8 working days); N. Killian Pl. (WT410210619), E. Reservoir Av. to E. Brown St. (8 working days); N. 85th St. (WT410210633), W. Glenbrook Rd. to 120’ N/O N. Joyce Av. (15 working days); W. Kilbourn Av. (WT410210634), N. 25th St. to N. 27th St. (13 working days); N. 26th St. (WT410210635), 50’ S/O W. Kilbourn Av. to W. State St. (15 working days); W. Nash St. (WT410210672), 70’ E/O N. 2nd St. to N. 3rd St. (17 working days); W. Medford Av. (WT410210679), W. Sheridan Av. to N. 83rd St. (14 working days); N. 83rd St. (WT410210680), W. Sheridan Av. to W. Medford Av. (22 working days); N. 82nd Ct. (WT410210681), W. Glen Av. to 200’ NW/O W. Glen Av. (7 working days); N. 95th St. (WT410210683), W. Rio St./N. 95th St. to W. Fond Du Lac Av. (17 working days); W. Langlade St. (WT410210684), N. 95th St. to N. Denmark St. (23 working days); W. Rio St. (WT410210685), N. 95th St. to N. Denmark St. (14 working days); N. 89th St. (WT410210686), W. Thurston Av. to W. Carmen Av. (18 working days); E. Vienna Av. (WT410220668), N. Richards St. to N. Humboldt Blvd. (43 working days); N. Fratney St. (WT410220669), E. Vienna Av. to E. Capitol Dr. (24 working days); N. Booth St. (WT410220670), E. Nash St. to E. Vienna Av. (15 working days); W. Locust St. (WT410220671), N. 8th St. to N. 13th St. (66 working days). (Note: Contractor to furnish and install approximately 17,996 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/15/2022 04:30 PM UTC
OFFICIAL NOTICE 121-2022
WASTE COLLECTION SERVICES FOR THE MILWAUKEE WATER WORKS
12/07/2022 04:30 PM UTC
291 - 300 of 1490 Solicitations
1 2 26 27 28 30 32 33 34 148 149