General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 79-1-2023
THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, ETC.; Located at: ST240230506 – Street Lighting Improvements/Upgrades @ Various Locations (City Wide)
08/31/2023 03:30 PM UTC
OFFICIAL NOTICE 86-1-2023
LEAD SERVICE LINE REPLACEMENTS
08/28/2023 03:30 PM UTC
OFFICIAL NOTICE 73-1-2023
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 6’ CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SPEED HUMP SIGNAGEASSEMBLY, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211210156 - North 84th St. - West Congress Street to West Hampton Avenue ST211210198 – West Glendale Avenue - North 84th Street to 87th Street
08/22/2023 03:30 PM UTC
OFFICIAL NOTICE 80-1-2023
2nd and Plankinton parking structure east passenger elevator hoistway repair and replace.
08/17/2023 03:30 PM UTC
OFFICIAL NOTICE 65-1-2023
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, PERMEABLE PAVERS, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212210105 – West Euclid Avenue, West Oklahoma Avenue, South 7th Street, & South 8th Street ST212220106 – North Farwell Avenue, East Irving Place, East Lafayette Place, & North Oakland Avenue ST212220105 – West Florist Avenue, West Oriole Drive, North 34th Street, & North 35th Street ST212220103 – West Glendale Avenue, West Rudy Avenue, North 41st Street, & North 42nd Street
08/10/2023 03:30 PM UTC
OFFICIAL NOTICE 17-1-2023
SANITARY SEWER MAIN RELAY, COMBINED SEWER MAIN RELAY, AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING: Located at: S. Illinois Ave. – 255' +/- N. of E. Holt Ave. to E. Morgan Ave. S. Mabbett Ave. – E. Bennett Ave. to E. Oklahoma Ave. E. Malvern Pl. – S. Kinnickinnic Ave. to S. Pennsylvania Ave. E. Oklahoma Ave. – S. Mabbett Ave. to S. Pennsylvania Ave. S. Pennsylvania Ave. – E. Ohio Ave. to E. Holt Ave. S. Pennsylvania Ave. – 176' N. of E. Oklahoma Ave. to E. Oklahoma Ave.
07/31/2023 03:30 PM UTC
OFFICIAL NOTICE 17-2-2023
SANITARY SEWER MAIN RELAY, NEW STORM SEWER, AND COMBINED SEWER MAIN RELAY: Located at: S. 9th Pl. – W. Montana St. to 300'+/- S. of W. Dakota St. S. 22nd St. – W. Greenfield Ave. to W. Orchard St. S. 41st St. – W. Greenfield Ave. to W. Orchard St. W. Orchard St. – S. 38th St. to S. 41st St. W. Walker St. – S. 5th St. to S. 6th St.
07/31/2023 03:30 PM UTC
OFFICIAL NOTICE 81-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING POLES, LIGHT POLE REMOVALS, INSTALLATION OF CONDUITS AND CABLES, ELECTRICAL APPURTENANCE REMOVALS, ETC.; Installation work at the following location: RG1515236326A – Street Lighting Series Conversion SG9-10 @ Various Locations
07/19/2023 03:30 PM UTC
OFFICIAL NOTICE 82-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING POLES, LIGHT POLE REMOVALS, INSTALLATION OF CONDUITS AND CABLES, ELECTRICAL APPURTENANCE REMOVALS, ETC.; Installation work at the following location: RG1515236326 – Street Lighting Series Conversion SO5-6 @ Various Locations
07/19/2023 03:30 PM UTC
OFFICIAL NOTICE 68-1-2023
REMOVAL AND CONSTRUCTION OF: 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, SAWING AND SODDING & TOPSOIL, GRAVEL FILLING, OTHER CONCRETE REMOVALS, ETC.; Located at: ST230230102 – 2023 Scattered Sites Sidewalk Replacements At Various Locations City Wide
07/18/2023 03:30 PM UTC
331 - 340 of 1601 Solicitations
1 2 30 31 32 34 36 37 38 160 161