General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 35-2-2024
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 2: AREA BOUNDED BY NORTH AVENUE, WEST CITY LIMIT, CAPITOL DRIVE, AND NORTH 27TH STREET.
02/22/2024 04:30 PM UTC
OFFICIAL NOTICE 35-3-2024
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 5 - AREA BOUNDED BY NORTH AVENUE, NORTH 13TH ST, CAPITOL DRIVE, AND INTERSTATE 43
02/22/2024 04:30 PM UTC
OFFICIAL NOTICE 35-4-2024
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 6: BOUNDED BY NORTH AVE., W I-43, CAPITOL DR., AND EAST CITY LIMIT
02/22/2024 04:30 PM UTC
OFFICIAL NOTICE 10-1-2024
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 7” CONCRETE ALLEY PAVEMENT,VARIABLE THICKNESS CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; Located at: ST211190198 – West Wright Street - from North 35th Street to North Sherman Boulevard
02/21/2024 04:30 PM UTC
OFFICIAL NOTICE 36-1-2024
THE CONSTRUCTION OF; CONCRETE TRAFFIC ISLAND, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” AND 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE DRIVEWAYS, VARIABLE CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, CONCRETE CURB PEDESTRIAN, DETECTABLE WARNING FIELD, INSTALLATION OF VARIOURS CONDUIT/CABLE ITEMS, VARIOURS TRAFFIC SIGNAL ITEMS, PAVEMENT GRINDING, PAVEMENT MARKING, VARIOURS TRAFFIC SIGNAGE ASSEMBLY/INSTALLATION, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, VARIOURS PAVEMENT MARKINGS, INSTALLATION OF VARIOURS LIGHTING/LUMINAIRE UNITS, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING REMOVAL, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located at: TD04884103 – West Walnut Street/East Pleasant Street; East Juneau Avenue; East/West Kilbourn Avenue
02/21/2024 04:30 PM UTC
OFFICIAL NOTICE 39-1-2024
THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: RG1515236321A – Street Lighting Improvements/Upgrades @ Various Locations (City Wide)
02/20/2024 04:30 PM UTC
OFFICIAL NOTICE 12-1-2024
The general work requested is: THE CONSTRUCTION OF; 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT AND SIDEWALK, VARIABLE THICKNESS CONCRETE BASE, 5” CONCRETE WALK, ADA HANDICAP CONCRETE RAMPS, VARIABLE CONCRETE DRIVEWAYS, VARIABLE CONCRETE CURB AND GUTTER, CLAY PAVERS, DETECTABLE WARNING FIELD, INSTALLATION OF CONDUIT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE, VARIOUS TRAFFIC CALMING DEVICES, ASSEMBLY/INSTALLATION, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING REMOVAL, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located at: TD11584006 – East Michigan Street - from North Cass Street to North Lincoln Memorial Drive (Including North Lincoln Memorial Drive)
02/16/2024 04:30 PM UTC
OFFICIAL NOTICE 13-1-2024
The general work requested is: THE CONSTRUCTION OF; CONCRETE TRAFFIC ISLAND, 5” CONCRETE WALK, ADA HANDICAP CONCRETE RAMPS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELD, INSTALLATION OF CONDUIT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE ASSEMBLY/INSTALLATION, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING REMOVAL, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located at: TD04984004 – North Van Buren Street - from East Wisconsin Avenue to East Brady Street TD07984004 – North Van Buren Street - from East Wisconsin Avenue to East Brady Street
02/15/2024 04:30 PM UTC
OFFICIAL NOTICE 43-1-2024
Former Northridge Mall Fence Replacement Project
02/14/2024 04:30 PM UTC
OFFICIAL NOTICE 37-1-2024
Remote Bridge Upgrades at Multiple Locations
02/13/2024 04:30 PM UTC
301 - 310 of 1601 Solicitations
1 2 27 28 29 31 33 34 35 160 161