General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2022
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE DRIVEWAYS, PAVEMENT GRINDING/MILLING, JOINTS AND CRACK REPAIRS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELD, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: ST211200129 – North 87th Street – West Lisbon Avenue to West Melvina Street (Including: West Elmore Avenue - North 87th Street to North 88th Street)
07/14/2022 03:30 PM UTC
OFFICIAL NOTICE 84-1-2022
ELECTRICAL WORK TO REPLACE MCC-2 NORTH FILTER FLOOR, MCC-3 SOUTH FILTER FLOOR, AND ASSOCIATED LOAD CENTERS AT THE MILWAUKEE WATER WORKS (MWW) LINWOOD WATER TREATMENT PLANT
07/12/2022 03:30 PM UTC
OFFICIAL NOTICE 83-1-2022
MILWAUKEE WATER WORKS (MWW) PRINTING AND MAILING SERVICES
07/11/2022 03:30 PM UTC
OFFICIAL NOTICE 19-1-2022
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: N. 1st St. – E. / W. Meinecke Ave. to E. / W. Wright St. N. 29th St. – 240’+/- S. of W. Kilbourn Ave. to W. Richardson Pl. N. 37th St. – W. Clarke St. to W. Center St. E. Clarke St. – N. 1st St. to N. Palmer St. W. Clarke St. – N. 37th St. to N. 38th St. W. Hadley St. – N. 25th St. to N. 27th St. W. Locust St. – N. 17th St. to 15’+/- E. of N. 20th St.
06/29/2022 03:30 PM UTC
OFFICIAL NOTICE 19-2-2022
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: Located at: N. 24th Pl. – W. Nash St. to 155’+/- N. of W. Vienna Ave. N. 25th St. – 125’ +/- N. of W. Capitol Dr. to W. Hope. Ave. S. 90th St. – W. Adler St. to 340’+/-W. Adler St. W. Blue Mound Rd. – N. 63rd St. to N. 67th St. W. Vienna Ave. – N. 24th Pl. to 245’+/- E. of N. 24th Pl. W. Wisconsin Ave. – N. 55th St. to N. Hawley Rd.
06/29/2022 03:30 PM UTC
OFFICIAL NOTICE 89-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 6, BOUNDED BY NORTH AVE., W I-43, CAPITOL DR., AND EAST CITY LIMIT
06/27/2022 03:30 PM UTC
OFFICIAL NOTICE 58-1-2022
Rehabilitation of South 35th Street Viaduct over Pierce Street
06/23/2022 03:30 PM UTC
OFFICIAL NOTICE 64-1-2022
CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, ETC.; Located at: ST230220165 – Area Wide Walk Replacement for Area Bounded By (ABB) ST216220106 - ADA Ramps for Area Wide Walk for Area Bounded By (ABB): ABB: N. Downer Ave., E Belleview Pl., N. Lake Dr. and E. Park Pl. ABB: W. Historic Mitchell St., S. 7th St., W. Windlake Ave. and S. 11th St.
06/21/2022 03:30 PM UTC
OFFICIAL NOTICE 82-1-2022
Installation of pavement markings, colored pavement markings, and flexible delineators to address pedestrian, bicyclist, and motor vehicle traffic safety concerns.
06/17/2022 03:30 PM UTC
OFFICIAL NOTICE 81-1-2022
WITKOWIAK PARK SURFACING – SYNTHETIC TURF & POROUS PAVEMENT Located at: 1656 South 4th Street, Milwaukee, WI 53204 PROJECT NO. 81-1-2022: Synthetic Turf Athletic Field & Playground Surfacing
06/16/2022 03:30 PM UTC
301 - 310 of 1449 Solicitations
1 2 27 28 29 31 33 34 35 144 145