General Info

Business Logo

Ohio Facilities Construction Commission

30 W Spring St 4th Floor, Columbus, OH 43215-2216
(614) 466-6290

Vision
To be the premier resource for public facilities construction.

Mission
To lead collaboration with our partners in the planning, design, and construction of public facilities through quality service, expertise and knowledge sharing.

Goals
1.  To build quality facilities that promote excellence.
2.  To facilitate projects that are well planned, on time, and on budget.
3.  To embrace innovation and encourage continuous growth.
4.  To cultivate partnerships for success.

Standard Documents

Name * Description
Revised_Code_Section_153.08.pdf (14.4 KB)
Statute permitting electronic bidding in Ohio
Administrative_Code_Section_153_1-8.pdf (17.9 KB)
Administrative rule on electronic bidding in Ohio
Executive_Order_2019-12D.pdf (776 KB)
Expenditure of Public Funds for Offshore Services
Executive_Order_2022-02D.pdf (263 KB)
Ohio's Response to Russia's Unjust War on Ukraine
4 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
DRC-23F038
GCI-GRC Connection, GCI Fence Replacement
03/13/2024 02:00 PM UTC
DRC-21F015.02
NERC - HVAC Upgrades HVAC splits systems within Housing Units. Base Bid provide HVAC splits systems within Housing Units H and M. Alternate Bid – 1, Provide portable A/C with shroud within Housing Units H, J, K and M.
03/11/2024 06:00 PM UTC
DRC-21F024
Replace storefront windows in the TPU/SEG – South Side of building (North Side is not in the project scope). Make repairs to exterior fire stairs in LPH/DR, TPU/SEG, E1, E2, F1, and F2. Upgrade restroom, showers, and HVAC scope as indicated.
02/29/2024 07:00 PM UTC
DNR-230014-03 Re-Bid
The new Buck Creek Nature Center includes site pavement, utilities and landscaping improvements to the existing site with significant selective demolition of the existing building on site. Demolition includes the following: partial foundation removal, interior & exterior walls, roof in its entirety and typical MEP building systems. Partial foundations and existing concrete structural columns remain as indicated. The Work includes new construction of a 2,528 SF single-story steel post and beam structure with glu-lam roof rafters with 3” x 6” T&G roof decking. Scope of work includes new MEP systems and exterior envelope installed to meet current building and energy codes for intended use.
02/29/2024 07:00 PM UTC
DNR-230017 Mohican SP Tree Clearing
Mohican State Park Tree Clearing Ohio Department of Natural Resources 3116 State Route 3 Loudonville, OH 44842, Project includes the clearing and removal of trees within the limits shown on the construction drawings.
02/29/2024 07:00 PM UTC
DNR-230016
DNR-230016-Jesse Owens State Park Sawmill Road – Campground D Wastewater Treatment Plant Ohio Department of Natural Resources The Project consists of the construction of a new 25,000 gpd precast activated sludge wastewater treatment plant located at 10390 N State Route 83 McConnelsville, OH 43756. Project includes the construction of an effluent control building which houses tertiary filters, UV and flow monitor equipment, restroom, sink, and electrical and instrumentation equipment. There will be an outfall located on Brannons Fork. The site requires regrading and tree removal and is fenced and paved with compacted aggregate.
02/23/2024 07:00 PM UTC
DRC-21F001.02
Southeast Correctional Institute Waterline Replacement at 5900 BIS Road SW, Lancaster, OH 43130. The project consists of replacing roughly 1861’ of Waterline, and abandoning the existing waterline in place. The project also calls for hydrant removals and replacements, water service connections, etc. Alternate 1: Roughly 232’ of Sanitary Sewer Removal & Replacement.
02/15/2024 07:00 PM UTC
DNR-210062
Deer Creek State Park Wastewater Treatment Plant Improvements, Mt. Sterling, Pickaway County, Ohio. The project includes the installation of a new 60,000 GPD extended-aeration package treatment system with flow equalization and post-aeration, an operations building containing a chemical feed system, tertiary disk filter, UV disinfection system, and flow measurement system, and decommissioning of an existing lagoon and spray irrigation system, as noted in the Contract Drawings.
02/15/2024 07:00 PM UTC
DNR-230018
Project: DNR-230018-Hocking Hills Wastewater Improvements 23-24 ODNR Hocking Hills State Park, Hocking County, Ohio
02/14/2024 07:00 PM UTC
DNR-230019
Project DNR-230019 FY23-24 North Bass Island Renovations – Package 2: Renovations & Additions This project renovates three separate buildings on the North Bass Island (Isle St. George) on three separate parcels for ODNR. The buildings are Welcome Center (3,845-sf), Fox House (3,395-SF), and Ellington House (2,300-sf). The Work consists of limited site development, wells for water service, on-site sanitary systems, electric service, limited structural modifications, masonry and wood joist for new structures, wood framing for additions, metal panel roofing, exterior stone veneer and composite siding, windows, doors and frames, interior finishes, residential equipment, furniture, pluming, hvac and electrical systems and components.
02/13/2024 07:00 PM UTC
71 - 80 of 779 Solicitations
1 2 3 4 5 6 8 10 11 12 77 78