General Info

Business Logo

Ohio Department of Public Safety

1970 W Broad St Ste 225, Columbus, OH 43223-1102
(614) 752-2069


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
DPS-250008/12-24031 Springfield Dispatch Upgrades
Springfield Dispatch Upgrades, DPS-250008/12-24031 4201 Gateway Boulevard Springfield, Ohio 45502 Clark County Pre-bid Meeting: Tuesday, June 17, 2024, at 10:00 am Scope of Work: Interior renovation of the Springfield Highway Patrol Post including, dispatch room, relocated main entrance, new vestibule and lobby areas along with mechanical and electrical upgrades. Post to remain operational during construction.
07/10/2025 02:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
25-22052 Emergency Management Agency (EMA) Parking Lot Replacement
25-22052 Emergency Management Agency (EMA) Parking Lot Replacement located at: 2855 West Dublin-Granville Road Columbus, Ohio 43235 Pre-Bid Meeting: March 14, 2023, at 9:30AM, at site location. The pre-bid meeting will be held inside the building, Room 204. Each company will need to check-in with the security desk before this meeting, please arrive 5-10 minutes early to allow time for this process. SCOPE OF WORK: • Base Bid: o Demolition work consists of milling min. 2" of existing asphalt pavement in main parking area "A", Approx. 109,529 sq. Ft. o New construction includes installation of minimum 2" of new asphalt and tack coat. Match existing drainage per design to storm water drains, and seal & restriping parking lot after new asphalt to match existing. o Please refence the Section 32 17 23 “Painted Pavement Markings” on pages 29-31 within the Limited Scope Document for the pavement specifications. • Alternate 1: o Demolition work consists of saw cutting and removing min. 2" of existing asphalt pavement, Approx. 9,359 sq. Ft., in areas identified. o New construction includes recompacting base and providing new pavement in areas identified. • Alternate 2: o New construction includes asphalt crack filling as needed, and reseal.
03/24/2023 02:00 PM UTC
25-22048 Shipley Parking Lot Seal and Stripe
25-22048 Shipley Parking Lot Seal and Stripe 3/9/2023 at 10:00 AM: Pre-Bid Meeting (we will meet at the Shipley Parking Lot cross walk area) Furnishing and applying retro-reflective pavement marking materials in accordance with the lines and dimensions shown on the plans or as described therein. All pavement markings shall conform with the requirements of the "Ohio Manual of Uniform Traffic Control Devices for Streets and Highways".
03/17/2023 02:00 PM UTC
25-22046 (DPS-180003) Pump House / Fire Tank Demolition
25-22046 (DPS-180003) Pump House / Fire Tank Demolition Alum Creek Facility Ohio Department of Public Safety 1583 Alum Creek Drive Columbus, Ohio 43209 Door #52, West side of Building The work consists of the following: - Demolition of abandoned Pump House and underground storage tanks (including all site utilities) - and the construction of an asphalt parking lot. Pre-Bid Meeting on Tuesday, February 7, 2023 from 10:00 AM until approximately 11:00 AM Publicly Advertised in Newspaper: Feb 2, 2023 Feb 9, 2023 Feb 16, 2023
02/28/2023 05:00 PM UTC
25-23022 OSP Academy Flooring Replacement
Provide and Install approximately 12,800 Square Feet of new 24" x 24" carpet squares and cove base at the State Highway Patrol Academy located at: 740 East 17th Avenue Columbus, OH 43211 Please see attached drawing and bid solicitation with scope of work and project details.
02/15/2023 03:00 PM UTC
89-23023 OSP Southern Posts Flooring Replacement - REBID
Install new carpet and cove base at Ten, Ohio State Highway Post Locations in the Southern half of the state. Square Footage varies for each location and can range from 100 SF to 2500 SF per site. Please see attached map and floorplans. Carpet has already been purchased by OSP and will need to be picked up from 1583 Alum Creek Drive, Columbus, OH 43209 and delivered to the job sites.
02/10/2023 03:00 PM UTC
89-23021 OSP Northern Posts Flooring Replacement - REBID
Install new carpet and cove base at Nine, Ohio State Highway Post Locations in the Northern half of the state. Square Footage varies for each location and can range from 150 SF to 2000 SF per site. Please see attached map and floorplans. Carpet has already been purchased by OSP and will need to be picked up from 1583 Alum Creek Drive, Columbus, OH 43209 and delivered to the job sites.
02/10/2023 03:00 PM UTC
89-23023 OSP Southern Posts Flooring Replacement
Install new carpet and cove base at Ten, Ohio State Highway Post Locations in the Southern half of the state. Square Footage varies for each location and can range from 100 SF to 2500 SF per site. Please see attached map and floorplans. Carpet has already been purchased by OSP and will need to be picked up from 1583 Alum Creek Drive, Columbus, OH 43209 and delivered to the job sites.
01/25/2023 03:00 PM UTC
89-23021 OSP Northern Posts Flooring Replacement
Install new carpet and cove base at Nine, Ohio State Highway Post Locations in the Northern half of the state. Square Footage varies for each location and can range from 150 SF to 2000 SF per site. Please see attached map and floorplans. Carpet has already been purchased by OSP and will need to be picked up from 1583 Alum Creek Drive, Columbus, OH 43209 and delivered to the job sites.
01/25/2023 03:00 PM UTC
25-23028 OSP Academy Range Trap Replacement
25-23028 OSP Academy Range Trap Replacement Scope of Work - Demolition of the existing trap system - Removal of existing trap, auger, and dust collection unit - HEPA vacuum of the range floor - Disposal of existing steel plates, dust collection unit, and auger - Installation of a new Rubber Berm Trap, which shall be: - Rifle rated - Flame retardant - Contractor removes and properly disposes of all materials consistent with al laws and industry best practices for the disposal of hazardous waste 1. Facility Access background checks required from all Contractor employees before work may begin. Contractor must submit all required forms within 3 days of contract award to allow time to process all paperwork. 2. All required permits to be obtained by contractor. 3. EDGE is required for bids exceeding $50,000. Participation should include 5% of the full bid amount including labor and materials. EDGE vendors can include labor and material suppliers. 4. Prevailing Wage rates are required for any state project that exceeds $75,000. See attached rates. 5. Contractor to provide the following compliance documentation upon contract award: - Valid State ID – If you have not previously worked with the State of Ohio, you will need to apply for a State ID number – Please do so as soon as possible given this process can take up to (2) weeks. Please visit: https://supplier.ohio.gov/wps/portal/sp/suppliers/login - Valid BWC certificate - Proof of participation in the BWC Drug Free Safety Program, or signed affidavit - Proof of Liability Insurance - EEO Certificate of Compliance - Bond – Bids exceeding $5,000 require a bond with Power of Attorney for the full amount of your proposal
01/12/2023 03:00 PM UTC
25-22045 Ohio State Highway Patrol Fleet - Tailor Shop Renovation
25-22045 Ohio State Highway Patrol Fleet - Tailor Shop Renovation located at: 1583 Alum Creek Drive Columbus, OH 43209 Pre-Bid Meeting: January 4, 2023, at 9:30 AM at site location. Please meet at the Office of Facility Services on the westside of the building. SCOPE OF WORK: • 1. Partial non-structural demolition of existing walls • 2. Remove existing doors and relocate, turn over to owner any doors not reused • 3. Remove existing window and turn over to owner • 4. Remove existing service window and counter and turn over to Owner • 5. Remove existing flooring as needed • 6. Construct and finish new non-structural walls • 7. Reuse existing ceiling tiles, replace any broken tiles as needed • 8. Fire suppression: relocate existing or add new fire sprinkler heads as needed • 9. Relocate existing light fixture(s) as needed • 10. Reconfigure existing light switches • 11. Reconfigure existing electrical receptacles as needed • 12. Install new electrical light switches and receptacles as needed • 13. No plumbing work required • 14. HVAC work required • 15. Owner to relocate existing pod walls and loose furniture
01/10/2023 03:00 PM UTC
71 - 80 of 153 Solicitations
1 2 3 4 5 6 8 10 11 12 15 16