Kansas Turnpike Authority
9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537
9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
KTA 8184
This project on KTA (I-335) in Lyon County, MM 132.2 to MM 147.8, is for pavement patching, the application of Ultrathin Bonded Asphalt Surface (UBAS) (Type B) on the northbound and southbound mainline lanes, and the application of Haydite chip seal on the shoulders. This project includes the Admire Interchange at MM 147. Milling is required for patching, in transition areas, and as shown on the plans. This project also includes underdrains and rumble strips.
| 07/15/2025 07:00 PM UTC |
Number | Deadline |
---|---|
KTA #8071
Provide all materials, equipment and labor necessary to fabricate and deliver structural steel, bearing devices, headed stud anchors, fasteners and all other structural steel items shown on the plans.
| 09/19/2023 07:00 PM UTC |
KTA #7920
This work will include ramp improvements at MM 1.6 NB (Port of Entry.)
| 07/18/2023 07:00 PM UTC |
KTA #7730
This work will include drainage improvements at MM 15 (Slate Creek).
| 05/16/2023 07:00 PM UTC |
KTA #7881
This is the Cashless Tolling Signing project. The purpose of the project is to create and install signing related to the 2024 Cashless Tolling transition. The project runs the length of the Turnpike from MM 00 in Sumner County to MM 236 in Wyandotte County. This project includes signing, posts, footings, truss mounted signs, and all other work shown in the plans.
| 02/16/2023 08:00 PM UTC |
KTA #7909
The primary operations to be undertaken with this project consist of Earthwork for drainage detention at MM 214.2.
| 02/14/2023 08:00 PM UTC |
KTA #7917
This project is for safety improvements consisting of guardrail upgrades, guardrail removals and bridge pier protection at multiple locations along the turnpike in Sumner and Sedgwick Counties from MM 0-42.
| 01/18/2023 08:00 PM UTC |
KTA #7936
This work will include constructing new haunched slab mainline bridges 141.6 NB and 141.6 SB in place of an existing 7’x7’ RCB, Full depth asphalt driving lane replacement, Guardrail installations, Existing RCB extensions left and right, and Jacked pipe
| 01/18/2023 08:00 PM UTC |
KTA #7989
This work will include relocation of the signal cabinet at the intersection of Kansas Ave & SW Topeka Blvd in Topeka and all other work shown in the plans.
| 12/22/2022 08:00 PM UTC |
KTA #7922
This work will include the overlay of special high friction surfacing on two mainline curves at approximately MM 103 and MM 105.
| 12/13/2022 08:00 PM UTC |
KTA #7801
This work will include Re-deck and widen Bridge 125.22 SB, hydro demolition and latex modified concrete overlay Bridge 125.22 NB.
| 12/13/2022 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.