General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
KTA #7527
This work will include asphalt surfacing MM 71.3 to 96.5 and ramp improvements at Plaza 76 & 92.
12/11/2019 08:00 PM UTC
KTA #7529
This work will include mill and asphaltic concrete inlay of the driving lanes and shoulders from MM 210.7 to MM 224 as well as milling and overlaying the Tonganoxie Interchange (MM 212) and I-70/K-7 ramps as shown in the plans.
11/12/2019 08:00 PM UTC
KTA #7533
This work will include re-decking and widening bridges 143.180 NB & 143.180 SB.
11/12/2019 08:00 PM UTC
KTA #7495
This work will include construction of 3-14' x 6' x 159' rigid frame box bridge at MM 19.687 and geometric improvement at MM 19.0 interchange in Sumner County.
10/23/2019 07:00 PM UTC
KTA #7528
This work will include mill and asphaltic concrete inlay of the driving lanes and shoulders from MM 167.7 to MM 183.3 as well as milling and overlaying the interchange and ramps at South Topeka, the access road, parking lots and maintenance yard (MM 177), and K-4 Interchange (MM 182) in Shawnee County.
10/15/2019 07:00 PM UTC
KTA #7526
This work will include full depth removal and replacement of designated PCCP panels on the ramps for the KTA Port of Entry at MM 1.700 in Sumner County.
07/23/2019 07:00 PM UTC
KTA #7579
Bridge Painting for the following Bridges: Br. 3.048 (4), Br. 6.059 (8), Br. 8.078 (10), Br. 10.101 (12), Br. 11.105 (13) and Br. 20.172 (23) N.B.
07/16/2019 07:00 PM UTC
KTA #7578
Bridge Painting Lyon, Osage, Shawnee & Leavenworth County: Br. 148.590, Br. 158.963, Br. 169.627, Br. 172.477, & Br. 219.242.
07/16/2019 07:00 PM UTC
KTA #7482
HMA surfacing KTA MM 112.3 to 133.2, expansion joint repairs to northbound and southbound KTA Bridges 124.68 and 125.22, accel & decel ramp extension at Emporia Service Area, and drainage improvements at MM 132.2.
05/21/2019 07:00 PM UTC
KTA #7357
This work will include Ramp Improvements at Lecompton Interchange (MM 197.2), UBAS Surfacing from MM 197.9 to MM 210.7, and Drainage Structure Improvements at MM 212.1 and 214.2 in Douglas and Leavenworth Counties.
03/19/2019 07:00 PM UTC
61 - 70 of 93 Solicitations
1 2 3 4 5 7 9 10